Professionals and Qualifications

Equalities impact assessment authorship and the duty

7 min readBy PlanScope Editorial Team

Section 149 of the Equality Act 2010 sits on the local planning authority. An applicant's equalities assessment is evidence for that duty, and it needs a named author and sourced local data.

The public sector equality duty sits on the council, not on you. Section 149 of the Equality Act 2010 requires a public authority to have due regard to three things when exercising its functions, and determining a planning application is one of those functions. An equalities impact assessment planning document prepared by an applicant is therefore not a statutory submission requirement. It is evidence the authority can use to discharge a duty that remains its own.

That distinction decides who writes it, what goes in it, and how much weight it carries. It also explains why some officers treat a developer's assessment as useful material and others barely read it.

Where the duty applies and to whom

The duty binds listed public authorities, which for planning purposes means the local planning authority, the Mayor of London and the Secretary of State. It applies to decisions on applications, to plan-making, to the use of enforcement powers and to the setting of policy.

It does not bind the applicant. A private developer has obligations under other parts of the Equality Act, on services and on employment, but section 149 is not one of them. What a developer can do is give the decision maker the material it needs, which is a practical motive rather than a legal one.

Three limbs make up the duty. The authority must have due regard to the need to eliminate unlawful discrimination, harassment and victimisation, to advance equality of opportunity between people who share a protected characteristic and those who do not, and to foster good relations between those groups. The protected characteristics are age, disability, gender reassignment, pregnancy and maternity, race, religion or belief, sex and sexual orientation, with marriage and civil partnership relevant to the first limb only.

The courts have been clear that due regard means substance rather than form. The duty must be exercised with an open mind, before or at the time of the decision rather than afterwards, and it cannot be delegated away to a consultant's report.

What the assessment has to consider

A useful document works through the proposal's effects on people sharing each protected characteristic, in relation to the three limbs, and says where the effect is neutral.

For a development scheme the recurring themes are:

  • Physical accessibility of routes, entrances, level changes and parking, and how the scheme performs against inclusive design standards rather than minimum compliance.
  • Housing mix and tenure, and whether the dwelling sizes and types respond to household structures that differ by age and by ethnicity in the local population.
  • Loss or relocation of a facility used disproportionately by one group, such as a place of worship, a community hall, a day centre or a market.
  • Construction phase effects, including severance of routes used by disabled residents and noise affecting people at home during the day.
  • Employment and training commitments secured through a planning obligation, and whether they reach the groups most affected by local unemployment.
  • Safety and perceived safety, including lighting and overlooking of routes, which bears differently on women and on older residents.

Write about who is affected and how. A document that lists the characteristics and records no effect against any of them is telling the officer nothing.

Who prepares it for an applicant

There is no licence, register or statutory competency for this work. In practice the author is usually the planning consultant leading the application, sometimes with input from an access consultant on the physical accessibility sections and from a social research specialist where primary engagement is involved.

That lack of a formal standard is not an argument for anonymity. Name the author and the date on the front of the report, as you would with any other supporting document, for the same reasons set out for naming the author and date on a planning report. An unattributed equalities assessment reads as boilerplate, and officers treat it accordingly.

An Equalities Impact Assessment is one of the more straightforward supporting documents to structure, which is why AI drafting handles the framework well. The judgement calls about local effect still need a human author who knows the area, and the draft should be reviewed before it is submitted.

Where the scheme is large enough to need a health assessment as well, the two documents share much of their evidence base, and the question of who can prepare a health impact assessment is worth settling at the same time so the data work is done once.

Evidence on protected characteristics

Use published local data and cite it. Census outputs from the Office for National Statistics give age structure, ethnic group, religion, disability and household composition at output area and ward level, which is granular enough for a site-specific assessment. Local authority joint strategic needs assessments, indices of deprivation and the council's own equality monitoring reports add the local narrative.

Avoid two habits. The first is quoting national averages when local figures are available and tell a different story. The second is asserting local characteristics with no source at all, which is the fastest way to get the document discounted.

Evidence need Where it comes from
Age, ethnicity, religion, disability, household type ONS census outputs at ward or output area level
Health and care needs The local joint strategic needs assessment
Deprivation context Indices of deprivation for the lower layer super output area
Local priorities and policy The council's own equality objectives and local plan policies
Views of affected groups Engagement carried out for the Statement of Community Involvement

Where you have engaged with local groups, report what was said rather than how many events you held. The record of a conversation with a disabled residents group about a pedestrian route carries more weight than an attendance count.

Mitigation recorded in the submission

Mitigation only counts if it survives into the permission. Design responses belong on the approved drawings, management responses belong in a management plan secured by condition, and anything financial or long-term belongs in the section 106 agreement.

A short table tying each identified effect to the mechanism that delivers the response is the most useful page in the document. It gives the officer the drafting for the condition or the obligation, and it stops a commitment from evaporating between the planning statement and the decision notice.

As an illustrative example, an assessment for a mixed use scheme replacing a community hall might identify loss of a venue used mainly by older residents and by a faith group, and record three responses: a replacement hall of stated floor area shown on the drawings, a phasing condition keeping the existing hall in use until the replacement is complete, and a lettings policy for community use secured by obligation. Each has an owner and a trigger.

How the authority uses the document

The officer report is where the duty is discharged. Expect the officer to summarise the equality considerations, to reach a conclusion on whether any group is disadvantaged, and to record that members had regard to the duty before resolving to grant or refuse.

Your document feeds that section. It does not replace it, and an officer who simply attaches your assessment without analysis leaves the decision exposed to challenge. If the committee report does not deal with an effect your assessment identified, that is worth raising before the resolution rather than after, because a decision taken without regard to the duty is vulnerable on judicial review.

Where the authority disagrees with your analysis, treat it the way you would any other technical disagreement with the council, and be ready for the officer's conclusion to carry more weight than yours.

Avoiding a tick-box document

Three tests separate a working assessment from a filler document. Does it name a group and a specific effect on a specific part of the scheme? Does every factual claim about the local population have a citation? Does every stated mitigation measure appear somewhere enforceable?

A document that fails all three is worse than no document, because it invites the officer to conclude that the applicant has considered equality and found nothing, which is rarely true of any development of scale.

If you want a second pair of eyes before submission, the professional directory is the route to a reviewer who can check the document against the duty and the local evidence.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is an equalities impact assessment a statutory requirement for applicants?

No. The public sector equality duty in section 149 of the Equality Act 2010 binds the local planning authority as decision maker, not the applicant. An applicant's assessment is voluntary evidence, though some local plan policies and validation lists ask for one on larger schemes, and it helps the officer discharge the duty properly.

Who should write the assessment?

There is no licence or register for this work. Usually the planning consultant leading the application writes it, with an access consultant contributing on physical accessibility and a social research specialist where primary engagement is needed. Whoever writes it should be named on the front of the document with a date.

Which protected characteristics must be covered?

Age, disability, gender reassignment, pregnancy and maternity, race, religion or belief, sex and sexual orientation. Marriage and civil partnership is relevant only to the first limb of the duty, which concerns eliminating unlawful discrimination. Record where the effect on a group is neutral as well as where it is adverse.

What local data should the assessment use?

Census outputs from the Office for National Statistics at ward or output area level for age, ethnicity, religion, disability and household composition, plus the joint strategic needs assessment, indices of deprivation and the council's own equality objectives. Cite each source. National averages used in place of available local figures weaken the document.

Can a decision be challenged for ignoring the duty?

Yes. The duty must be exercised in substance, with an open mind, before or at the time of the decision. If the officer report and the committee minutes show no regard to a relevant equality effect, the decision is open to judicial review. Raise the gap before the resolution rather than after it.

Sources and further reading

equalitiesequality act 2010public sector equality dutyreport authorshipplanning process

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Professionals and Qualifications

View all →
Professionals and Qualifications7 min read

Structural and geotechnical sign off for a planning case

Structural and geotechnical reports are judged on whether the author's competence is on the face of the document. The routes, the Eurocode 7 categories and reliance.

Read article →
Professionals and Qualifications7 min read

Who signs off a materials management plan

Reusing excavated soil on site depends on a declaration signed by a registered qualified person. Get the appointment and the timing wrong and the material becomes waste.

Read article →
Professionals and Qualifications7 min read

Who can author a BS 5837 arboricultural report

There is no statutory licence for arboriculturists. Councils test competence through registers, qualification levels and the quality of the method statement, and they do reject reports.

Read article →
Professionals and Qualifications7 min read

What to ask about a consultant's last appeal appearance

Ask which appeal they last gave evidence at and what the inspector said about it. Unlike most pitch claims, the answer can be verified in about twenty minutes.

Read article →
Professionals and Qualifications7 min read

How to check a report against the standard it cites

Reports that cite a British Standard but do not follow it fail in predictable places: wrong edition, skipped normative clause, missing correction, withheld raw data.

Read article →
Professionals and Qualifications7 min read

Keeping a competence file for condition discharge

When a condition says the work must be done by a suitably qualified person, the authority will ask who and why. Build the evidence file at appointment, not at discharge.

Read article →