Report Deep Dives

Judging significance of effects in an LVIA

7 min readBy PlanScope Editorial Team

Significance of effects in an LVIA is a reasoned judgement built from value, susceptibility and magnitude. Matrices present the conclusions; they do not produce them.

Significance of effects in an LVIA is a reasoned professional judgement, not an arithmetic output. The Guidelines for Landscape and Visual Impact Assessment, third edition (GLVIA3), published by the Landscape Institute and IEMA in 2013, asks the author to combine the sensitivity of the receptor with the magnitude of change and then explain the conclusion in words. Where a reviewer or an inspector finds fault, it is almost always because the explanation is missing rather than because the matrix was wrong.

That matters because the conclusion carries planning weight. A moderate adverse effect on a National Landscape is treated very differently from a moderate adverse effect on a degraded urban fringe, and the assessment has to make the difference legible.

How sensitivity and magnitude combine

GLVIA3 keeps the two inputs separate for a reason. Sensitivity describes the receptor and exists before the scheme. Magnitude describes the change the scheme causes.

Sensitivity has two components. Value is the relative worth attached to the landscape or the view, evidenced by designation, published landscape character assessment, condition, recreational use, and cultural or historic associations. Susceptibility is the ability of the receptor to accommodate the particular development without undue consequences for its character or for visual amenity. A valued landscape may have low susceptibility to one kind of change and high susceptibility to another, which is why susceptibility must be judged against the actual proposal.

Magnitude is normally built from size or scale of change, geographical extent, duration and reversibility. Construction effects are short term and reversible. A 20 metre building is permanent, so its magnitude is assessed over the lifetime of the scheme.

The combination step is where authors drift. GLVIA3 does not supply a formula, and a table that always returns "major" from "high plus large" is describing the table rather than the landscape.

Keeping landscape effects apart from visual effects

Chapter 5 of GLVIA3 deals with effects on the landscape as a resource, and Chapter 6 with effects on views and visual amenity experienced by people. They are separate assessments with separate receptors, and conflating them is the error that reviewers see most often.

Landscape receptors are elements, characteristics and character areas: the field pattern, the hedgerow network, the skyline, a named landscape character type from the National Character Area profiles or a county assessment. Visual receptors are people at identified locations: residents, users of a public right of way, visitors to a designated viewpoint, motorists on a given stretch of road.

Assessment Receptor Evidence base Typical mitigation
Landscape effects Character areas, features, pattern Landscape character assessment, condition survey Retention of features, reinforcement planting, layout change
Visual effects People at defined viewpoints Viewpoint survey, visualisations to TGN 06/19 Screening, massing change, setback, boundary planting

One practical test. If a paragraph says "views of the hedgerow network will be affected", it has merged the two. Name the person who holds the view, or name the landscape feature being changed, and keep the sentence to one of them.

Value and susceptibility set out separately

Reviewers should expect the assessment to state value and susceptibility as distinct findings before sensitivity appears. Where they are collapsed into a single "high sensitivity" label, the reasoning cannot be audited and an inspector cannot test it.

Value is the easier of the two to evidence. A National Landscape boundary, a registered park and garden, a Local Landscape Designation in the adopted plan, or a well used promoted route all provide something citable. The August 2026 National Planning Policy Framework carries the policy tests for designated landscapes, and the edition should be stated because the chapter and policy codes changed from the paragraph numbering used in the December 2024 version.

Susceptibility needs the author to engage with the scheme. A wooded valley with strong internal enclosure may absorb a cluster of low buildings while being highly susceptible to a tall mast. Write that sentence, with the reason, rather than assigning a grade.

Making judgement auditable

The reviewer's question is simple. Could another competent assessor follow this reasoning to the same place, and if not, can they see where they would differ?

Four things make that possible:

  1. State the criteria used for each grade in the methodology, before any site findings, and keep them unchanged throughout.
  2. Give the reasoning for every effect judged moderate or higher, in prose, naming the determinative factor.
  3. Record where the judgement was finely balanced and say which way it was taken.
  4. Keep the viewpoint schedule, the photography date and the visualisation type consistent with Landscape Institute Technical Guidance Note 06/19.

An illustrative example. A single wind turbine 500 metres from a Grade II listed farmhouse, on arable land within a National Landscape. Landscape value is high by designation. Susceptibility to a vertical moving element in an open arable landscape is also high, because the landscape's character derives in part from its uninterrupted skyline. Magnitude is large in the near field and reduces with distance and intervening vegetation. The author concludes major adverse on the character area and major adverse on the residents of the farmhouse, and sets out that the determinative factor is the absence of any existing vertical reference in the baseline. That last sentence is what survives examination.

Matrices as a presentation device

Matrices are useful for showing a reader the pattern of conclusions across many receptors at a glance. They are not a method. GLVIA3 is explicit that the guidelines do not prescribe thresholds or a scoring system, and that professional judgement sits at the centre of the process.

Two habits to avoid. First, converting grades into numbers and adding them, which produces a false precision the underlying judgements cannot support. Second, using a five by five grid and then only ever reporting the diagonal, which suggests the matrix is driving the answer.

Where a matrix is used, reproduce the criteria next to it and allow the text to depart from the cell where the author's judgement differs, with the reason stated. A departure that is explained is stronger evidence than a grid that is never questioned.

Residual effects, mitigation and time

Effects should be reported at construction, at completion and at a later point when planting has matured, commonly year 15 for landscape mitigation in UK practice. Report the residual effect after embedded and additional mitigation, and be honest where mitigation does not reach the effect. Screening a view does not restore a lost field pattern.

Reversibility belongs with duration. A temporary consent for a period of years changes the magnitude assessment, and so does a restoration scheme secured by condition or obligation. Both should appear in the magnitude reasoning rather than only in the mitigation chapter.

Where the scheme is EIA development under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017, the Environmental Statement must identify the likely effects of importance, and those regulations require the statement to be prepared by competent experts. An LVIA inside an Environmental Impact Assessment therefore carries a competency requirement that a standalone LVIA does not.

Where the reasoning gets tested

Appeal inspectors probe the same joints every time. Whether value and susceptibility were separately evidenced. Whether visual receptors were identified as people rather than as views. Whether the magnitude judgement accounted for distance and screening honestly, or relied on summer photography. Whether the conclusion in the non-technical summary matches the conclusion in the chapter.

They also test consistency with the authority's own evidence. If the adopted landscape character assessment describes the area as having a strong sense of enclosure and the LVIA treats it as open, one of them has to give way, and the author should say which and why.

The same discipline applies to the townscape version of this work, where the receptors are street character areas and urban views rather than rural ones, and to the narrower Townscape and Visual Impact Assessment often asked for on urban sites. For comparison, the way a baseline is fixed and defended in other technical chapters follows the same pattern, as in the baseline sound survey chapter of a BS 4142 report and the baseline condition assessment in a biodiversity metric.

Councils normally expect an LVIA from a suitably qualified author, usually a chartered landscape architect, and professional review is strongly advised before submission. PlanScope can draft the structure, the policy framing and the receptor schedule, with gaps flagged for the assessor to complete from site survey, which is a starting point for that professional rather than a substitute for them.

If you are reviewing drafts and want to see where sign-off is expected, the professional directory sets out the review and sign-off route.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required.

Frequently asked questions

How is significance of effects defined in GLVIA3?

GLVIA3 does not set thresholds or a scoring system. It asks the assessor to combine the sensitivity of the receptor, built from value and susceptibility, with the magnitude of change, and then to state the resulting judgement with reasons. The guidance treats professional judgement as central and expects the reasoning to be recorded transparently.

What is the difference between landscape and visual effects?

Landscape effects are changes to the landscape as a resource, so the receptors are features, characteristics and character areas. Visual effects are changes to views and visual amenity, so the receptors are people at identified locations such as residents or users of a public right of way. GLVIA3 deals with them in separate chapters.

Are matrices acceptable in an LVIA?

They are acceptable as a way of presenting many conclusions at once, provided the criteria are reproduced alongside and the text explains each judgement of moderate or higher. Converting grades to numbers and adding them is not acceptable, because it implies a precision the underlying judgements cannot support.

When should residual effects be reported?

Report effects at construction, at completion and at a later point once planting has matured, commonly year 15 in UK practice. State the residual effect after both embedded and additional mitigation, and say plainly where mitigation does not address the effect, such as screening a view that does not restore a lost field pattern.

Who should prepare an LVIA?

Councils normally expect a suitably qualified author, usually a chartered landscape architect, and professional review before submission is strongly advised. Where the LVIA sits within an Environmental Statement, the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 require preparation by competent experts, which is a legal requirement rather than a preference.

Sources and further reading

lviaglvia3landscapevisual impacteialandscape institute

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Report Deep Dives

View all →
Report Deep Dives7 min read

Deliveries and routing in a construction traffic plan

A routing section that promises to use the primary network where practicable will be returned. Name the roads, give the peak vehicle numbers, and say how a breach is handled.

Read article →
Report Deep Dives7 min read

Choosing consultation methods in an SCI

The methods section has to show the consultation could have changed something. That means justifying each method against its audience and reporting what it failed to reach.

Read article →
Report Deep Dives7 min read

Unregulated emissions in a whole life carbon assessment

Appliances, small power and lifts are not controlled by Part L but still belong in B6. Why figures vary so widely and what a checkable assessment states.

Read article →
Report Deep Dives7 min read

The maintenance section of a landscape strategy

The maintenance section is where a landscape strategy is won or lost. It has to name who does the work, for how long, paid from what, with what happens when planting fails.

Read article →
Report Deep Dives7 min read

The viability appraisal inputs section explained

A reviewer reads the land value derivation and the developer return first. How to set out every input with its source, and test the conclusion honestly.

Read article →
Report Deep Dives7 min read

The mitigation section of a protected species survey

Officers read the mitigation section asking whether the measures can be conditioned and whether a licence is likely. How to write one that answers both.

Read article →