Report Deep Dives

Unregulated emissions in a whole life carbon assessment

7 min readBy PlanScope Editorial Team

Appliances, small power and lifts are not controlled by Part L but still belong in B6. Why figures vary so widely and what a checkable assessment states.

Unregulated emissions in a whole life carbon assessment are the operational energy the Building Regulations do not control: appliances, cooking, small power, IT equipment, lifts and escalators, external lighting and catering equipment. They sit inside module B6 alongside regulated energy, and they are the part of a submission most likely to be wrong, because nothing in Part L forces you to model them and no single benchmark commands agreement.

The result is that two assessments of near-identical buildings can report B6 figures that differ by a wide margin, with neither author having done anything improper. Getting the reporting right is therefore more useful than arguing about the number.

Regulated and unregulated operational carbon

Regulated energy is the energy use controlled under Part L of the Building Regulations: space heating and cooling, domestic hot water, ventilation, fixed internal lighting and the auxiliary energy for pumps and fans. It is what the compliance model calculates and what an energy statement reports against a target.

Unregulated energy is everything else the building consumes in use. In a residential scheme that means cooking, white goods, consumer electronics, lifts and communal external lighting. In an office or a laboratory it can exceed the regulated load, because server rooms, specialist equipment and catering are all unregulated.

Both are operational energy, so both belong in the whole life carbon result. Leaving unregulated energy out produces a figure that understates the building's actual carbon over its life, and a reviewer who spots the omission will treat the rest of the assessment with less confidence.

Which modules capture unregulated energy

The module structure in the assessment follows BS EN 15978, and the RICS professional standard on whole life carbon assessment sets out how it is applied in the United Kingdom.

Module What it covers Unregulated energy here
A1 to A3 Product stage, materials No
A4 to A5 Transport to site and construction No, though site energy sits in A5
B1 to B5 Use, maintenance, repair, replacement, refurbishment Replacement of appliances and lifts, not their operation
B6 Operational energy use Yes, regulated and unregulated together
B7 Operational water use No, water only
C1 to C4 End of life No
D Benefits and loads beyond the boundary Exported energy, reported separately

So B6 is the module to read. Note that the equipment itself appears twice legitimately: its manufacture and replacement in B4, its energy consumption in B6. Those are different flows and counting both is correct.

The assumptions that drive the number

Four inputs account for most of the variation between submissions, and each should be stated explicitly.

Small power density, usually expressed in watts per square metre, together with the hours of operation assumed. A figure taken from a design guide benchmark for a generic office will not match a measured figure for a building with a trading floor in it.

Appliance and equipment schedules. In residential work the assumption about white goods, their efficiency class and their replacement over the study period moves the result materially, and the same applies to whether lifts are modelled from manufacturer data or from a benchmark.

Occupancy and operating hours. A 60 year study period multiplies any error in the daily assumption by a very large number, which is why an unexplained occupancy profile is a reasonable thing for a reviewer to challenge.

The carbon factor applied to grid electricity, and whether a decarbonisation trajectory is used across the study period. This is the single largest lever in the whole of B6. An assessment using a flat present-day factor over 60 years and one applying a published decarbonisation projection will produce very different results from identical energy figures.

An illustrative example of how the levers interact: take a residential block where the regulated load has been reduced through fabric and a heat pump, so unregulated energy becomes the larger share of B6. Change only the grid decarbonisation assumption and the reported B6 figure moves more than any fabric improvement available to the design team. The design has not changed. The accounting has.

Why submissions vary so widely

Beyond the assumptions, three practices drive divergence.

Some authors model unregulated energy explicitly, using an operational energy modelling approach rather than the compliance model. Others apply a benchmark per square metre. Both are defensible and they do not produce comparable outputs, so the method has to be stated.

Some assessments report B6 as a single number and others split it. A single number hides whether unregulated energy was included at all, and a reader cannot tell the difference between a thorough assessment and an omission.

And the floor area basis differs. A result in kilograms of carbon dioxide equivalent per square metre is meaningless without knowing whether the denominator is gross internal area, net internal area or something else, and whether it was measured to a stated standard.

Reporting conventions that make results comparable

Six things, stated on the face of the assessment, make a result checkable:

  1. The reference study period used, which is normally 60 years, and the reason if a different period is adopted.
  2. The modules reported, with any excluded modules named rather than silently omitted.
  3. B6 split into regulated and unregulated, each with its method and source.
  4. The grid carbon factor source, the baseline year and the decarbonisation trajectory applied.
  5. The floor area, the area basis and the measurement standard used for the normalised figure.
  6. The assumptions schedule, covering small power density, operating hours, occupancy, equipment efficiencies and replacement intervals.

That last item is the one most often left out and the one a reviewer reaches for first. A Whole Life Carbon Assessment with a clear assumptions schedule can be interrogated and agreed. One without it can only be accepted or doubted.

Where a scheme is in Greater London, the authority's own whole life-cycle carbon guidance sets out a reporting template and submission stages, and following its structure saves an exchange of comments.

Where reviewers find double counting

Four recurring overlaps are worth checking before submission.

On-site renewable generation netted off B6 and also claimed as an export benefit in module D. Generation used in the building reduces B6. Generation exported is a module D flow. Counting the same kilowatt hour twice inflates the result in your favour and is the error most likely to be spotted.

Tenant fit-out appearing in both A5 and B5, usually where a base build assessment and a fit-out assessment were produced by different teams and then combined.

Heat network carbon counted at both the building and the network level, which happens where a scheme takes heat from a wider network and the network's own emissions are also allocated to it.

Lift and appliance energy appearing both inside a modelled B6 figure and again as a separately added unregulated allowance. This is the specific double count that arises from mixing the two methods described above, and it is why the method statement matters.

The same discipline that makes any baseline figure comparable applies here, in the way described for the baseline condition assessment in a BNG metric: state the method, state the inputs, and let the reviewer reproduce the number.

Tying the result back to the energy strategy

The B6 figure has to be consistent with the Energy Statement for the same scheme. The energy statement reports regulated carbon against the Part L target, usually through the energy hierarchy of being lean, clean, green and seen. The whole life carbon assessment takes that regulated figure, adds a stated unregulated allowance, and projects both across the study period.

Where the two documents disagree, it is nearly always because they were produced by different consultants at different design stages, and nobody reconciled them. Set out a one page reconciliation showing the regulated figure in each document and explaining any difference. It takes an hour and removes a whole round of officer comments.

Two related documents interact with the same numbers. An Overheating Risk Assessment under Part O may introduce mechanical cooling, which is regulated energy and changes B6. A Circular Economy Statement deals with the material flows behind modules A and C and should use the same quantities.

Councils expect a suitably qualified author for an assessment of this kind, and professional review is strongly advised before submission.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. For specialist technical reports, qualified professional input may be required. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What counts as unregulated energy?

Everything the building consumes that Part L of the Building Regulations does not control: appliances, cooking, small power, IT equipment, lifts and escalators, external lighting and catering equipment. In offices and laboratories it can exceed the regulated load, because servers and specialist equipment all fall outside the compliance calculation.

Which module captures unregulated operational energy?

Module B6, operational energy use, which covers regulated and unregulated energy together. Module B4 covers the manufacture and replacement of the equipment itself, so appliances and lifts appear in both modules legitimately. Those are different flows and counting both is correct rather than a double count.

Why do B6 figures differ so much between submissions?

Four inputs dominate: small power density and operating hours, appliance and equipment schedules, occupancy assumptions over the study period, and the grid electricity carbon factor with any decarbonisation trajectory applied. The last of these is the largest lever, and a flat present-day factor produces a very different result from a published projection.

What should a whole life carbon assessment state to be checkable?

The reference study period, normally 60 years, the modules reported with any exclusions named, B6 split into regulated and unregulated with the method for each, the grid carbon factor source and trajectory, the floor area basis and measurement standard, and a full assumptions schedule.

Where does double counting usually occur?

On-site renewable generation netted off B6 and also claimed as an export benefit in module D, tenant fit-out appearing in both A5 and B5, heat network emissions allocated at both building and network level, and lift or appliance energy included in a modelled B6 figure and again as a separate unregulated allowance.

Sources and further reading

whole life carbonunregulated energymodule b6energy statementricsreporting

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Report Deep Dives

View all →
Report Deep Dives7 min read

Deliveries and routing in a construction traffic plan

A routing section that promises to use the primary network where practicable will be returned. Name the roads, give the peak vehicle numbers, and say how a breach is handled.

Read article →
Report Deep Dives7 min read

Choosing consultation methods in an SCI

The methods section has to show the consultation could have changed something. That means justifying each method against its audience and reporting what it failed to reach.

Read article →
Report Deep Dives7 min read

Judging significance of effects in an LVIA

Significance of effects in an LVIA is a reasoned judgement built from value, susceptibility and magnitude. Matrices present the conclusions; they do not produce them.

Read article →
Report Deep Dives7 min read

The maintenance section of a landscape strategy

The maintenance section is where a landscape strategy is won or lost. It has to name who does the work, for how long, paid from what, with what happens when planting fails.

Read article →
Report Deep Dives7 min read

The viability appraisal inputs section explained

A reviewer reads the land value derivation and the developer return first. How to set out every input with its source, and test the conclusion honestly.

Read article →
Report Deep Dives7 min read

The mitigation section of a protected species survey

Officers read the mitigation section asking whether the measures can be conditioned and whether a licence is likely. How to write one that answers both.

Read article →