Reports for a raised play structure in a garden

7 min readBy PlanScope Editorial Team

The raised platform rule, not the overall height, is what takes most play towers and treehouses outside permitted development. Here is what to submit.

A garden play structure stops being permitted development the moment it includes a raised platform higher than 0.3 metres. That single sentence in Schedule 2 Part 1 Class E of the General Permitted Development Order 2015 is why most treehouses, raised decking with a slide and the better sort of climbing frame need planning permission, while a trampoline sunk into the lawn and a swing set do not.

Councils receive very few applications for these and a good many complaints about them, which means the ones that are refused are usually refused on overlooking.

Height limits and the raised platform rule

Class E allows buildings, enclosures and other structures within the curtilage of a house for a purpose incidental to the enjoyment of the dwellinghouse, within limits. The ones that bite on play structures are these.

The structure must not include a raised platform exceeding 0.3 metres in height, measured from the ground. Overall height is limited to 2.5 metres where any part is within 2 metres of the boundary of the curtilage, and otherwise to 4 metres for a dual pitched roof or 3 metres for any other roof. Nothing may sit forward of the principal elevation. Buildings and structures together must not cover more than half the area of the curtilage excluding the original house. And in the curtilage of a listed building, Class E does not apply at all.

The platform rule is the one that catches people, because a play tower with a deck at 1.2 metres is a raised platform even though the structure as a whole is well under the height limits. A slide needs that deck to work, so the better designed the structure, the more likely it needs permission.

Two further points. A swing frame, a goal, a trampoline at ground level or a small playhouse sitting on the grass is usually either not development at all or comfortably within the class. And scale matters in a different way for very large structures: a substantial fixed installation can stop being incidental to the enjoyment of the dwellinghouse, which takes it outside Class E regardless of its dimensions.

Overlooking from an elevated platform

This is the issue that decides applications. A deck at 1.5 metres puts a child's eye level above a 1.8 metre fence, and in a street of small rear gardens it provides a view into two or three neighbouring gardens and sometimes into first floor windows.

What works in a submission:

  1. Site the platform away from the shared boundaries, towards the house or into a corner screened by existing planting.
  2. Set a screen on the sides facing neighbours, drawn and dimensioned, using close boarded timber or louvres rather than open balustrade.
  3. Keep the platform height to the minimum the design needs, and say what that minimum is driven by.
  4. Show the sight lines on a section drawing from the platform to the nearest neighbouring windows and garden areas.
  5. Where planting is relied on, specify species and heights at planting rather than at maturity, because an officer will not credit a hedge that does not yet exist.

Noise is occasionally raised and rarely decisive. Children playing in a garden is an ordinary residential activity, and councils do not usually control it by condition. Hours conditions on a play structure are unusual, although a council may restrict the use of a very large installation close to a boundary.

Trees, and whether the structure is fixed to one

Building in or around a tree raises two separate questions.

If the tree is protected by a Tree Preservation Order, or stands in a conservation area and so is covered by the six week notice requirement under section 211 of the Town and Country Planning Act 1990, then cutting branches to make space, fixing into the trunk, or compacting the root protection area during construction can all be unauthorised work to the tree. That is a separate offence from any planning breach, with its own penalties.

Even where the tree is unprotected, fixing a structure into a living tree is a long term maintenance commitment, and a structure that loads one side of a mature tree changes how it moves in wind. A short note from an arboriculturist, or a tree survey and Arboricultural Impact Assessment where the tree is protected, deals with both the planning question and the practical one. The usual engineering answer is a free standing frame with posts clear of the root protection area and the platform built around the trunk without touching it.

Foundations near a boundary hedge or a neighbour's tree are the other trap. A post hole dug through roots inside a protected tree's root protection area is work you need consent for before you start.

Siting relative to boundaries

The 2 metre rule is a useful design discipline. Keeping the whole structure more than 2 metres from every boundary raises the permitted height, improves the overlooking position and removes the argument about foundations near a neighbour's fence.

Where the garden is too small for that, accept the 2.5 metre limit and design to it. A platform at 0.6 metres under a 2.5 metre roof is a usable play structure and a far easier application than a tower at platform height 1.8 metres.

Boundary treatment interacts with all of this. A fence next to the structure is itself limited to 2 metres under Part 2 Class A, or 1 metre where it adjoins a highway used by vehicles, so screening the platform by raising the fence is not usually an option without a separate application.

Conservation areas and listed buildings

In a conservation area, Class E is restricted: a building, enclosure, pool or container sited between a side elevation of the dwellinghouse and the boundary is not permitted development. A structure in the rear garden can still qualify, subject to the ordinary limits, so the platform rule remains the controlling factor.

In the curtilage of a listed building, Class E does not apply, so any structure needs planning permission. It may also need listed building consent where it affects the character or setting of the building, and a timber tower against the rear elevation of a listed farmhouse will be assessed on that basis. A short Heritage Statement describing the building, the setting and the reversibility of the structure is the document that gets these approved, and reversibility is the strongest argument available: a free standing timber frame fixed with ground screws can be removed without trace.

When an application is needed, and what to submit

Apply where any of these is true: a raised platform above 0.3 metres, a structure forward of the principal elevation, a height above the limits, coverage taking the curtilage past the half rule, a position between a side elevation and the boundary in a conservation area, or any location in the curtilage of a listed building.

The pack is short:

  • Location plan at 1:1250 and a site plan at 1:200 showing the structure, the boundaries and the distances to them
  • Elevations and a section with heights dimensioned from existing ground level, including the platform height
  • A sight line section towards the nearest neighbouring windows and garden areas
  • A screening detail where overlooking is an issue
  • A short Planning Statement covering incidental use, height, overlooking and materials
  • A heritage statement for a listed building or conservation area context
  • Tree information where a protected or influencing tree is involved

A householder application fee applies, and it is indexed, so check the current schedule before paying.

PlanScope can draft the planning and heritage documents for a householder application of this kind from your postcode and a few answers, with the address checked against conservation area, listed building and flood data as you go. The drawings and any arboricultural input need to come from your designer or arboriculturist.

This is general guidance, not legal advice. A Lawful Development Certificate is the only formal way to confirm that works are lawful, so check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Does a treehouse need planning permission?

Usually yes. Schedule 2 Part 1 Class E of the General Permitted Development Order 2015 excludes any structure including a raised platform higher than 0.3 metres, and a treehouse or play tower deck is almost always above that. A ground level trampoline, a swing frame or a small playhouse normally needs no permission.

How high can a garden play structure be?

Where the class applies, 2.5 metres if any part is within 2 metres of the curtilage boundary, otherwise 4 metres with a dual pitched roof or 3 metres with any other roof. Buildings and structures together must not cover more than half the curtilage excluding the original house.

What usually causes refusal?

Overlooking. A deck at 1.5 metres puts eye level above a standard fence and gives views into neighbouring gardens and sometimes first floor windows. Site the platform away from shared boundaries, add a dimensioned screen on the facing sides, keep the platform as low as the design allows, and submit a sight line section.

Can I fix a structure to a protected tree?

Not without consent. Where a Tree Preservation Order applies, or the tree stands in a conservation area and so needs six weeks' notice under section 211 of the Town and Country Planning Act 1990, cutting branches, fixing into the trunk or compacting the root protection area can all be unauthorised work with its own penalties.

Is the position different in a conservation area or at a listed building?

Yes. In a conservation area, Class E does not permit a building or enclosure sited between a side elevation and the boundary, though a rear garden structure can still qualify. In the curtilage of a listed building Class E does not apply at all, and listed building consent may also be needed.

Sources and further reading

play structuretreehousepermitted developmenthouseholderoverlookingwhich reports

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Which Reports Do I Need

View all →
Which Reports Do I Need7 min read

Reports needed for a riding arena with lighting

Keeping horses for riding is not agriculture, so a floodlit arena needs full permission. Here is the evidence base a rural council will look for, and the order to assemble it in.

Read article →
Which Reports Do I Need6 min read

Reports needed for a boatyard expansion on a tidal river

A tidal boatyard sits in two consenting regimes. Plot mean high and low water first, then build the evidence base around flood levels, hull work noise and dust, antifouling contamination and designated intertidal habitat.

Read article →
Which Reports Do I Need6 min read

Reports needed for allotments on grazing land

Cultivation on former grazing land is likely to count as agriculture. The structures, hardstanding, parking and new access are what need permission, and ecology plus access evidence decide the application.

Read article →
Which Reports Do I Need6 min read

Reports needed for a doctors' surgery in a converted house

A dwelling to surgery change of use is not permitted development. Parking demand, clinical waste storage, accessible entry and the loss of a residential unit drive the evidence base far more than any building work.

Read article →
Which Reports Do I Need6 min read

Reports needed to floodlight a school playing field

Floodlight columns are development, so permission is needed. The decisive evidence is an obtrusive light assessment against the lighting zone, bat sensitivity along boundary habitat, evening noise and parking demand.

Read article →
Which Reports Do I Need7 min read

Reports needed for a veterinary practice with boarding

Overnight boarding changes a veterinary application. Which reports the mixed use needs, why barking defeats a standard noise calculation, and the conditions to expect.

Read article →