Which Reports Do I Need

Reports to replace a flat roof with a pitched roof

7 min readBy PlanScope Editorial Team

Pitching a flat roof on the main house normally needs permission; over a rear extension it often does not. What governs the difference and what to submit.

Replacing a flat roof with a pitched roof on the main part of a house almost always needs planning permission, because the new ridge would sit above the highest part of the existing roof and that takes the work outside the permitted development classes. Doing the same thing over a single storey rear extension often does not, provided the finished height stays within the limits that apply to the extension itself.

So the first question is which roof you are talking about. The answer changes the document set completely.

Whether the alteration is permitted development

Two classes in Schedule 2 Part 1 of the Town and Country Planning (General Permitted Development) (England) Order 2015 deal with roofs.

Class C covers other alterations to a roof. It is tightly drawn: the alteration must not protrude more than 150 mm beyond the plane of the existing roof slope, and no part of it may be higher than the highest part of the existing roof. A pitched roof replacing a flat roof fails the second limb immediately.

Class B covers an addition or alteration to a roof that enlarges the dwellinghouse, which is how dormers are permitted. It also requires that no part of the enlargement be higher than the highest part of the existing roof. A new pitch above a flat roof on the main house fails that too.

Where the flat roof is on a single storey rear extension, the work is normally assessed under Class A as an alteration to the dwellinghouse, and the height limits for a single storey rear extension apply: a maximum height of four metres overall, and a maximum eaves height of three metres where any part is within two metres of a boundary. A shallow pitch over a rear extension often fits. A steep one usually does not.

Three things remove the rights altogether:

  • the property is a flat or maisonette, which has no Part 1 rights
  • an Article 4 direction applies, which is common across conservation areas
  • a condition on an earlier permission removed the right, which is common on estates built since the 1990s

On article 2(3) land, which covers conservation areas, National Parks, National Landscapes and World Heritage Sites, several of the householder rights are restricted further. Read the relevant class rather than a summary before deciding.

Height, ridge line and the terrace context

Where permission is needed, the design question is how the new roof sits against its neighbours.

On a terrace or a pair of semis, officers look at whether the ridge line continues the established rhythm. A pitched roof that matches the pitch, ridge height and eaves line of the attached property usually reads well. One that introduces a ridge 600 mm above the neighbour, or a different pitch angle, reads as an interruption and attracts an objection on character grounds.

On a detached house the test is softer, but the relationship to the main roof still matters. A pitch that springs awkwardly from below a first floor window, or that produces a wide flat section behind a pitched front, tends to be refused on design.

Measure and draw the context. An elevation showing the proposal against both neighbours, with ridge and eaves heights annotated, settles the question faster than a design statement. A street scene elevation is worth the extra drawing fee on any terrace.

Where the increase is modest, say so with figures. A ridge 450 mm above the existing parapet is a different proposition from one 1.8 m above it, and an application that does not state the figure invites the officer to assume the worse case.

Daylight and overshadowing to neighbours

A new pitch adds height on the boundary side, and that is where amenity objections come from.

For a householder scheme the authority will usually apply a rule of thumb rather than full modelling. The 45 degree test, taken in plan and in section from the nearest edge of the neighbour's nearest habitable room window, is the most common. Many councils publish the method in a householder design guide, so check the local version rather than assuming.

Where the increase is significant or the relationship is tight, a measured assessment is better than an argument. A Daylight and Sunlight Assessment carried out to the BRE 209 methodology gives vertical sky component and annual probable sunlight hours figures that an officer can weigh, and an Overshadowing Study deals with gardens and amenity space rather than windows.

Those are proportionate on a two storey rear addition in a dense terrace. They are overkill for a shallow pitch over a single storey extension at the bottom of a long garden, and submitting them there suggests a problem that does not exist.

Structural implications and the evidence needed

A pitched roof weighs more than a flat one and loads the supporting structure differently. On a flat roof converted to pitched, the existing wall plate, lintels and in some cases the foundations were designed for a different load path.

The structural work goes to building control rather than to planning, so calculations are not normally part of the planning submission. What does matter at planning stage is whether the structural solution changes the appearance. A new steel beam that needs a deeper fascia, or a thickened wall to carry the load, should be shown on the drawings rather than appearing as a variation later.

Where the roof spans onto a party wall, the Party Wall etc. Act 1996 applies and notice has to be served on the adjoining owner. That is a civil process entirely separate from planning permission, and it does not affect the planning decision, but it does affect the programme.

Lateral restraint and the junction with the existing roof are the two details that cause problems on site. Both cost far less to resolve on paper.

Materials matching the host dwelling

Where the pitch is visible from the street, the covering is a planning matter and officers will condition it.

Match the existing roof where there is one: tile or slate type, profile, colour and verge detail. Where the existing roof is natural slate, a fibre cement substitute is usually resisted on a prominent elevation and often accepted at the rear. Where the house is rendered or has a distinctive eaves detail, carry it through.

Pitch angle is part of the material conversation. A tile with a minimum pitch of 30 degrees cannot be used on a 17.5 degree roof, so the choice of covering constrains the geometry and the geometry constrains the height. Resolve that before the drawings are finalised, because changing the covering after permission usually means a condition variation.

Submit a short materials schedule with the application. Manufacturer, product, colour and a note of where each is used. It costs nothing and removes a condition.

Conservation area and listed building positions

In a conservation area the right to carry out roof alterations is restricted, and in many areas an Article 4 direction removes it altogether. Permission is therefore the normal route, and the test is whether the proposal preserves or enhances the character and appearance of the area under section 72 of the Planning (Listed Buildings and Conservation Areas) Act 1990.

For a listed building, listed building consent is needed for the alteration in addition to any planning permission, and sections 16 and 66 of the same Act require special regard to be had to preserving the building and its setting. Changing a flat roof to a pitched roof on a listed building is a substantial intervention and the historic position of the roof matters: a flat roof that is itself part of the original design will not usually be allowed to go.

Both cases need a Heritage Statement setting out the significance of the building or the area, the effect of the proposal on that significance, and the justification. Historic England's guidance on assessing significance sets the structure, and a statement that describes the building without assessing the effect will come back.

The document set to submit

For a householder application for a pitched roof replacement, expect to need:

  1. The application form, fee and ownership certificate.
  2. A location plan at 1:1250 and a block plan.
  3. Existing and proposed elevations at 1:50 or 1:100, including a street scene elevation on a terrace.
  4. Existing and proposed roof plans and a section through the new roof.
  5. A short Planning Statement where height or character is contested, with the ridge and eaves figures stated.
  6. A materials schedule.
  7. A Heritage Statement where the property is listed or in a conservation area.
  8. A daylight or overshadowing assessment only where the relationship to a neighbouring window or garden warrants it.

Check the authority's own validation list first, since local requirements sit on top of the national list.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.

Enter your postcode on PlanScope to see which documents the proposal is likely to need, or browse the report index.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Can I replace a flat roof with a pitched roof under permitted development?

Not on the main part of the house. Both Class B and Class C of Schedule 2 Part 1 require that no part of the work be higher than the highest part of the existing roof, and a new pitch above a flat roof breaches that. Over a single storey rear extension it can be permitted if the height limits are met.

What height limits apply over a single storey rear extension?

A single storey rear extension must not exceed four metres in overall height, and the eaves must not exceed three metres where any part is within two metres of a boundary. A shallow pitch often fits within those figures. The pitch angle also has to suit the roof covering, which constrains the geometry.

Will the council assess the effect on my neighbour's daylight?

Usually by a rule of thumb rather than modelling. The 45 degree test taken in plan and section from the nearest habitable room window is the most common method, and many councils publish their version in a householder design guide. A measured BRE 209 assessment is proportionate only where the relationship is tight.

Do I need structural calculations with the planning application?

No. Structural design goes to building control, not to the planning authority. What matters at planning stage is whether the structural solution changes the appearance, such as a deeper fascia for a new beam or a thickened wall. Show that on the drawings rather than introducing it later as a variation.

What if my house is in a conservation area?

Roof alteration rights are restricted on article 2(3) land and many conservation areas also have an Article 4 direction removing them, so permission is normally needed. The test is whether the proposal preserves or improves the character and appearance of the area, and a Heritage Statement assessing that effect is expected.

Does the Party Wall Act apply?

Where the new roof bears on or is built up to a party wall, yes, and notice has to be served on the adjoining owner. It is a civil process separate from planning and it does not affect the planning decision. It does affect the programme, so serve notice early rather than after permission is granted.

Sources and further reading

roof alterationpermitted developmenthouseholderdaylightconservation areamaterials

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Which Reports Do I Need

View all →
Which Reports Do I Need7 min read

Reports needed for a riding arena with lighting

Keeping horses for riding is not agriculture, so a floodlit arena needs full permission. Here is the evidence base a rural council will look for, and the order to assemble it in.

Read article →
Which Reports Do I Need6 min read

Reports needed for a boatyard expansion on a tidal river

A tidal boatyard sits in two consenting regimes. Plot mean high and low water first, then build the evidence base around flood levels, hull work noise and dust, antifouling contamination and designated intertidal habitat.

Read article →
Which Reports Do I Need6 min read

Reports needed for allotments on grazing land

Cultivation on former grazing land is likely to count as agriculture. The structures, hardstanding, parking and new access are what need permission, and ecology plus access evidence decide the application.

Read article →
Which Reports Do I Need6 min read

Reports needed for a doctors' surgery in a converted house

A dwelling to surgery change of use is not permitted development. Parking demand, clinical waste storage, accessible entry and the loss of a residential unit drive the evidence base far more than any building work.

Read article →
Which Reports Do I Need6 min read

Reports needed to floodlight a school playing field

Floodlight columns are development, so permission is needed. The decisive evidence is an obtrusive light assessment against the lighting zone, bat sensitivity along boundary habitat, evening noise and parking demand.

Read article →
Which Reports Do I Need7 min read

Reports needed for a veterinary practice with boarding

Overnight boarding changes a veterinary application. Which reports the mixed use needs, why barking defeats a standard noise calculation, and the conditions to expect.

Read article →