Salons, barbers and nail bars: which part of Class E
Personal services sit within Class E, so a salon moving into a former shop is not development. What does need permission is the flue, the shopfront and a locked condition.
A salon use class question almost always has the same answer: hairdressers, barbers, beauty salons and nail bars are services provided to visiting members of the public, so they sit inside Class E of the Use Classes Order, under the limb covering other services appropriate to provide in a commercial, business or retail district. Aesthetic clinics offering treatments that are properly medical sit in the health and medical limb, which is also inside Class E.
Because they are all in the same class, moving from one to another is not development and needs no permission. The things that do need permission are the flue, the shopfront, the signage and anything involving a unit that was never in Class E to begin with.
Where personal services sit in the Order
Class E was created by the 2020 amendment to the Use Classes Order and gathers together the old shops, financial and professional services, restaurants and cafes, offices, light industry, gyms, clinics and nurseries. Its limbs run from retail sale of goods through to industrial processes that can be carried out in a residential area.
| Business | Class E limb | Note |
|---|---|---|
| Hairdresser or barber | Other services in a commercial or retail district | Service, not retail sale of goods |
| Beauty salon, nail bar, tanning | Other services in a commercial or retail district | Same limb as hairdressing |
| Aesthetic clinic with medical treatments | Medical or health services | Still within Class E |
| Retail with a small treatment room | Retail sale of goods, with the treatment ancillary | Depends which use dominates |
| Barber with a hot food counter | Outside Class E for the food element | Hot food takeaway is sui generis |
The limb matters less than people think, because movement within a class is the point. Where it does matter is at the edges, and the two edges to watch are hot food and anything sui generis.
Why moving into a shop unit usually needs no permission
Section 55(2)(f) of the Town and Country Planning Act 1990 says that the use of a building for a purpose within the same use class as its existing use is not development. No application, no prior approval, no fee.
So a vacant former clothes shop in Class E can become a barber shop. A former estate agency in Class E can become a nail bar. A unit used as a cafe can become a salon. The fit-out may need building control attention and a change of occupier for business rates, and none of that is planning.
Two situations break this. The unit's lawful use is sui generis, which covers hot food takeaways, launderettes, betting shops, drinking establishments, amusement arcades and taxi businesses among others. A sui generis use is in no class at all, so moving out of it into Class E is a material change of use needing permission. And the unit may never have had a Class E use lawfully established, which happens where an earlier change was itself unauthorised.
An Article 4 direction does not affect any of this. A direction withdraws permitted development rights, and movement within a use class is not permitted development. It is not development. Councils occasionally conflate the two, and it is worth saying so politely when they do.
The condition that locks a unit to one use
This is the trap that costs the most money. A planning permission can carry a condition restricting the premises to a named use, and where it does, the condition overrides the freedom to move within the class.
Conditions of this kind are common on units in parades granted permission in the 1990s and 2000s, often worded to restrict occupation to retail use within Class A1 and no other purpose. A condition in those terms survives the renaming of the classes. The unit is restricted to the use the condition describes, and a salon moving in needs an application under section 73 of the 1990 Act to vary or remove the condition.
So read the planning history of the unit before signing a lease. Pull every permission on the council's register, read the conditions on each, and identify which one the current use relies on. A short enquiry costs nothing next to a year's rent on premises you cannot lawfully occupy.
Extraction for nail and beauty treatments
Nail work with acrylics and gels uses solvents and generates dust from filing. Workplace exposure is controlled under the Control of Substances Hazardous to Health Regulations 2002, which is an occupational matter, but the planning consequence is the extraction equipment you install to comply.
Where the extraction discharges through an external wall or a new flue, that is an alteration affecting the external appearance of the building and needs permission. On a parade with flats above, expect the council to want the discharge point and the treatment of the air dealt with in detail. A Ventilation and Extraction Statement setting out the air change rate, the filtration, the discharge height and position relative to openable windows, and the maintenance regime is what answers the point.
Waxing, spray tanning and some beauty treatments carry odour rather than dust. The mitigation is the same in kind: capture at source, filter, and discharge well away from residential windows.
Local extract at each station is normally preferable to a single room extract, and it is easier to justify, because the volume of air moved is smaller and the noise from the fan is correspondingly lower.
Hours, plant noise and the flats above
A salon that trades until 8pm above or below flats will attract comment on hours, and a condition limiting opening times is a realistic outcome. Offer a schedule you can live with rather than resisting any condition at all.
Plant noise is the other recurring issue. Extract fans, air conditioning condensers and tanning equipment all run during trading hours, and where there are flats above the assessment is usually set against the nearest bedroom window. An acoustic assessment under BS 4142:2014 with a specified attenuator and anti-vibration mounts is the standard answer, and designing the plant position before you lease the unit is easier than retrofitting it afterwards.
Deliveries and waste collection also matter on a constrained frontage. Where parking is the issue a short Transport Statement covering servicing and staff travel is proportionate.
Licensing and waste that sit outside planning
Several requirements sit alongside planning and are often confused with it.
Skin piercing activities including tattooing, electrolysis, acupuncture and ear piercing require registration with the local authority under the Local Government (Miscellaneous Provisions) Act 1982, and in London a special treatment licence regime applies instead. Businesses generating sharps or clinical waste have duties under the Environmental Protection Act 1990 waste duty of care and need a registered carrier.
None of these grant or refuse planning permission. All of them come up at the same time, and an environmental health officer visiting about one will notice the others. Get the planning position settled first, because a licence for premises you cannot use is worth nothing.
What still needs an application
Even where the change of use itself is free, the following normally require consent:
- A new or altered shopfront, including changes to the fascia, stallriser, entrance position or security shutters.
- An external flue, duct, grille or condenser unit visible from outside.
- Illuminated signage, under the advertisement control regulations, unless it falls within a class of deemed consent.
- Any extension, including a rear infill for a treatment room.
- Removal or variation of a condition restricting the permitted use.
- Works to a listed building or, in a conservation area, works affecting its character.
Where an application is needed, a short Planning Statement that identifies the lawful use, the condition position and the amenity mitigation does more for you than a drawing on its own. The same discipline applies at the other end of a unit's life, when the question becomes whether a Class E unit can become housing, which is where the Class MA vacancy rule comes in.
Enter your postcode on PlanScope to see which reports a salon fit-out application is likely to need.
This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
What use class is a hairdresser or barber shop?
A hairdresser or barber provides a service to visiting members of the public, so it falls within Class E of the Use Classes Order under the limb covering other services appropriate in a commercial, business or retail district. Beauty salons, nail bars and tanning salons sit in the same limb, and aesthetic clinics with medical treatments sit in the health limb.
Do I need planning permission to open a salon in an empty shop?
Usually not, because section 55(2)(f) of the Town and Country Planning Act 1990 says use within the same class as the existing use is not development. The exceptions are where the unit's lawful use is sui generis, such as a former hot food takeaway or launderette, or where a condition restricts the unit to a named use.
Can a planning condition stop me moving into a Class E unit?
Yes, and this is the most expensive trap. A condition restricting premises to a named use overrides the freedom to move within the class, and conditions in those terms survive the renaming of the classes in 2020. Varying one needs an application under section 73, so read every permission on the unit before signing a lease.
Does a nail bar need an extraction scheme?
Workplace exposure to solvents and dust is controlled under the Control of Substances Hazardous to Health Regulations 2002, and the equipment installed to comply often needs planning permission where it discharges through an external wall or a new flue. Expect the council to want the discharge position, filtration and maintenance set out in detail.
Does an Article 4 direction stop a change within Class E?
No. An Article 4 direction withdraws permitted development rights, and movement within a use class is not permitted development at all, because it is not development. Councils occasionally treat the two as the same thing, and it is worth setting the distinction out in writing if that happens.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.