Use Classes and Change of Use

Private members clubs and the drinking establishment line

7 min readBy PlanScope Editorial Team

A members club whose main activity is alcohol is sui generis, with no permitted development route anywhere. What pushes a club into Class F2 and what evidence decides it.

A private members club use class question usually has no clean answer, because the 2020 amendments to the Use Classes Order took drinking establishments out of the classes altogether. A club whose main activity is the sale and consumption of alcohol on the premises is a sui generis use, in no class at all, which means every change into or out of it needs planning permission. A club that is in substance a meeting place for the local community may instead fall within Class F2, and the difference decides whether you have permitted development rights and what policy protects the building.

Working out which one you have is a question of fact and degree, and the evidence that settles it is usually sitting in the club's own records.

Why drinking establishments left the use classes in 2020

Before September 2020, pubs, wine bars and similar premises sat in Class A4 and hot food takeaways in Class A5. The amendment that created Class E removed both from the classes and made them sui generis, alongside a separate sui generis category for drinking establishments with expanded food provision.

The practical effect was to lock them down. A sui generis use has no class to move within, so section 55(2)(f) of the Town and Country Planning Act 1990 gives no help, and the permitted development rights in Part 3 of Schedule 2 to the General Permitted Development Order 2015 that start from Class E do not apply either. Every change requires an application, which was the policy intention.

So if the club is a drinking establishment in substance, that is where it sits and that is the regime it is in.

Where a members club actually sits

Three candidate positions come up, and the factors that point to each are reasonably settled.

Position When it applies What points to it
Sui generis drinking establishment Alcohol sales and consumption are the primary activity Bar dominates the floor area, turnover mostly wet sales, evening trade, no substantial non-bar function
Class F2 local community The premises are in substance a hall or meeting place used principally by the local community Diary of community lettings, open access in practice, hall rather than bar is the main space, bar is ancillary
Class E indoor sport or recreation Sport is the activity and the premises serve visiting members of the public Courts, pitches or fitness facilities dominate, public access or open membership

The members-only element cuts across all three. Class F2 requires use principally by the local community and the Class E sport limb refers to provision principally to visiting members of the public, so a closed membership argues against both and towards sui generis.

Look at the floor areas, the accounts and the diary rather than the name over the door. A working men's club with a 200 m² bar, a 40 m² snooker room and four community lettings a year is a drinking establishment. A village hall with a licensed bar open on Friday evenings and 200 community bookings a year is not.

The adjacent question for sports and social clubs is covered separately in our note on sports and social clubs in Class F2 or sui generis, where the sport element changes the analysis.

The club premises certificate as evidence

A qualifying club normally holds a club premises certificate under Part 4 of the Licensing Act 2003 rather than a premises licence. That distinction is useful evidence, because the certificate regime applies to clubs where members have joined for a purpose other than obtaining alcohol and where the club is established and conducted in good faith.

The licensing file is therefore worth pulling. It will tell you the permitted licensable activities, the hours, the capacity and whether the club has been treated as a qualifying club or has converted to a full premises licence. A club that holds a premises licence and admits the public on payment at the door is operating as a drinking establishment whatever its constitution says.

None of this is determinative for planning. It is the kind of contemporaneous evidence an inspector finds persuasive, which is more than can be said for an assertion about the character of the use.

Policy protection for a community facility

Whichever class applies, the loss of the facility engages policy. The National Planning Policy Framework (August 2026 edition) expects plans and decisions to guard against the unnecessary loss of valued facilities and services, particularly where that would reduce the community's ability to meet its day-to-day needs. Local plans then carry their own community facilities policies, and they are usually more demanding than the national position.

Two further layers often apply. A club building may be listed as an asset of community value under the Localism Act 2011, which triggers a moratorium on disposal and gives the community an opportunity to bid. An asset of community value listing is a material consideration in a planning decision, though it does not prevent development in itself.

And a club with a long history on the site may be identified in a neighbourhood plan, which forms part of the development plan and carries the same weight under section 38(6) of the Planning and Compulsory Purchase Act 2004.

Marketing evidence before a loss is accepted

Where the proposal involves losing the club, expect the council to ask for evidence that continued community use is not viable. Local plan policies commonly require a marketing period, often 12 months, and the detail of what counts varies by authority, so read the policy wording rather than assuming.

What a credible marketing file contains:

  1. Instruction of an agent experienced in the sector, with the instruction letter and the asking price or rent.
  2. Particulars as marketed, with evidence of where and for how long they were advertised.
  3. A log of enquiries, viewings and offers, with the reason any offer did not proceed.
  4. Evidence that the price was realistic for the use as a club rather than priced on residual development value.
  5. Accounts showing the trading position over several years, which is what establishes that continued use is not viable.

The fourth point is where most files fail. A club marketed at a figure that reflects its value as a housing site has not been marketed as a club, and a council will say so.

Converting a redundant club to homes

If the club is sui generis, there is no prior approval route to residential. Class MA permitted development applies to premises in Class E, so a drinking establishment is outside it, and the same is true of a Class F2 community use. The route is a full application for change of use, assessed against the community facilities policy, the housing policies and the amenity considerations of the conversion itself.

Clubs convert awkwardly. The main hall is usually a deep, single storey space with high level windows and no outlook, which produces poor units unless the roof is opened up or the plan is reconfigured. Cellar space, flat roofs and a layout designed around a central bar all work against a residential plan. Where the building is in a terrace, party wall acoustic separation to the adjoining houses often needs substantial work.

The surrounding position matters too. A club that closed because of noise complaints may sit among houses that will now object to a car-free conversion with no parking, which is a different objection from the one the club attracted. Where the conversion is in a town centre unit, the issues are closer to those in the Class MA vacancy rule, even though the route is not available.

What the application needs to contain

For either a change of use of the club or a scheme on its site, build the pack around the policy test rather than the drawings.

A Planning Statement should set out the lawful use with the evidence that establishes it, the marketing history, the trading accounts position, the asset of community value status if any, and the policy case on the loss of the facility. Where the club continues alongside new development, a Noise Impact Assessment dealing with entertainment noise and plant is essential, and the agent of change principle puts that mitigation on the applicant.

A Transport Statement covering parking and servicing is normally proportionate for a conversion of this scale, particularly where the club car park is being built on.

Enter your postcode on PlanScope to see which reports a club site is likely to need.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What use class is a private members club?

If alcohol sales and consumption are the primary activity, it is a sui generis drinking establishment, because the 2020 amendments removed drinking establishments from the Use Classes Order. A club that is in substance a hall or meeting place used principally by the local community may fall within Class F2 instead, which is a question of fact and degree.

Why does it matter whether a club is sui generis or Class F2?

A sui generis use has no class to move within, so section 55(2)(f) of the Town and Country Planning Act 1990 gives no help and the permitted development rights that start from Class E do not apply. Every change into or out of the use needs planning permission, which was the intention behind the 2020 change.

Does a club premises certificate affect the planning position?

Not determinatively, but it is useful evidence. A qualifying club holds a club premises certificate under Part 4 of the Licensing Act 2003 rather than a premises licence, and the licensing file records the activities, hours and capacity. A club holding a full premises licence and admitting the public at the door is operating as a drinking establishment.

What marketing evidence does a council expect before a club is lost?

Local plan policies commonly require a marketing period, often around 12 months, with the agent's instruction, the particulars as advertised, a log of enquiries and offers, and trading accounts. The most common failure is marketing at a price reflecting residual development value rather than value as a club.

Can a club be converted to flats under permitted development?

No. Class MA applies to premises in Class E, so a sui generis drinking establishment is outside it, and a Class F2 community use is too. The route is a full application for change of use, assessed against community facilities policy as well as the merits of the conversion itself.

Sources and further reading

members clubuse classessui generisclass f2community facilitychange of use

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use6 min read

Pharmacy, optician or dentist: Class E(a) or E(e)

Pharmacies, opticians and dentists all sit inside Class E, so movement between them is not development. Old conditions, parking standards and plant are what still decide the application.

Read article →
Use Classes and Change of Use7 min read

Escape rooms and immersive entertainment venues

Escape rooms have no clear home in the Use Classes Order. Whether your authority reads the use as Class E(d) or sui generis decides whether you need an application at all.

Read article →
Use Classes and Change of Use7 min read

Salons, barbers and nail bars: which part of Class E

Personal services sit within Class E, so a salon moving into a former shop is not development. What does need permission is the flue, the shopfront and a locked condition.

Read article →
Use Classes and Change of Use7 min read

Changing a condition that ties a unit to a revoked class

A condition restricting a unit to a revoked class still bites. Section 73 is the route to vary it, and the application has to answer the reason the condition was imposed for.

Read article →
Use Classes and Change of Use7 min read

Translating old use class references in a permission

Conditions citing revoked A, B1, D1 and D2 classes remain enforceable on their original meaning. The mapping table, the saving provision and the section 73 route.

Read article →
Use Classes and Change of Use7 min read

Community centres and village halls in Class F2

Village halls usually sit in Class F2 as halls for the principal use of the local community. Changes within the class are not development, while moving out of it engages community facility policy.

Read article →