Escape rooms and immersive entertainment venues
Escape rooms have no clear home in the Use Classes Order. Whether your authority reads the use as Class E(d) or sui generis decides whether you need an application at all.
An escape room has no settled home in the Use Classes Order, which is why the escape room planning use class question comes up on almost every deal. Most authorities treat it either as Class E(d), indoor sport, recreation or fitness, or as sui generis, meaning it belongs to no class at all. Which way your authority goes decides whether you can move into a former shop without an application.
Immersive entertainment venues sit further from the classes again, because the closer the format gets to a performance the closer it gets to a theatre, and theatres have been sui generis since 2020.
Where the classes leave entertainment
The Town and Country Planning (Use Classes) Order 1987 was substantially amended in September 2020. The old Class D2, assembly and leisure, disappeared. Indoor sport, recreation and fitness moved into Class E(d). Cinemas, concert halls, bingo halls, dance halls and live music venues were taken out of the classes altogether and became sui generis.
That left a gap. An escape room is not sport, not fitness and not obviously recreation in the gym sense, and it is not a theatre either. The wording of Class E(d) is "for indoor sport, recreation or fitness, not involving motorised vehicles or firearms, principally to visiting members of the public", and the argument for an escape room rests entirely on the word recreation.
The argument against is that the activity is a paid entertainment experience closer to the sui generis leisure uses the 2020 amendment deliberately removed from the classes.
Why classification matters even when you still apply
Three practical consequences follow from the class, and they persist after permission is granted.
| Consequence | If Class E(d) | If sui generis |
|---|---|---|
| Moving in from another Class E use | No planning application needed | Full application for change of use |
| Future flexibility | Can switch to any other Class E use | Any change of use needs permission |
| Conditions on the permission | Fewer, because the class allows movement | Hours, capacity and sound conditions normal |
| Class MA conversion of the unit to homes later | Available if conditions met | Not available |
| Authority's control over the operation | Limited | Substantial |
The Class MA point is the one investors miss. Class MA of Part 3 of Schedule 2 to the General Permitted Development Order 2015 allows a Class E unit to convert to residential by prior approval subject to its conditions. A sui generis use removes that route, which changes the asset's long term options. Our note on the Class MA vacancy rule sets out how that right has moved.
Even where the authority accepts Class E(d), a landlord's lease will often restrict the permitted use more tightly than planning does. Check both.
Settling the position before you commit
Do this before heads of terms are signed, not after.
- Search the authority's planning register for the unit and for any comparable venue in the district, and read how the use was described on the decision notice.
- Ask the authority in writing, through a pre-application enquiry, for its view on the use class, describing the operation honestly including hours, capacity and whether alcohol will be sold.
- Where the answer is Class E(d) and the unit is already in Class E, consider a certificate of lawful proposed use or development under section 192 of the Town and Country Planning Act 1990. That converts an opinion into a formal determination.
- Where the answer is sui generis, budget for a full change of use application and the reports it will need.
A pre-application response is advice rather than a decision, so it does not bind the authority. The section 192 certificate does, which is why it is worth the fee on a unit you are taking a long lease on.
Occupancy, escape routes and the building
Planning and building control ask different questions, and conflating them causes delay.
Planning is concerned with the effect of the use on its surroundings: traffic, parking, noise, hours, the character of the shopping frontage. Building regulations are concerned with the building itself, and for an escape room that means Approved Document B and means of escape from rooms where doors may be locked or disguised as part of the game.
The fire safety position deserves attention early. Locked doors, low lighting, confined spaces and visitors unfamiliar with the layout are exactly the combination that a fire risk assessment under the Regulatory Reform (Fire Safety) Order 2005 has to address, and the responsible person has duties whatever the planning position allows. Design the escape strategy with the game design rather than after it.
Occupancy figures also feed the planning case, because the trip generation and the parking demand follow from the number of people on site at once. Our note on capacity in indoor leisure uses covers how those figures are evidenced.
Hours, the evening economy and amplified sound
Most conditions on a venue of this kind cover three things: opening hours, maximum occupancy, and control of amplified sound.
Hours are usually the negotiation. An escape room running to 11pm in a town centre with an adopted evening economy policy is a different proposition to the same hours on a parade with flats above. Bring the local plan policy on town centre uses and any evening economy or cumulative impact policy to the pre-application meeting, and propose hours you can actually trade on rather than the hours you would like.
Amplified effects are the technical issue. Soundtracks, rumble effects and bass-heavy cues transmit through structure far better than speech, and flats above a unit are the usual receptor. Where the authority's environmental health officer is involved, expect a request for a Noise Impact Assessment using BS 4142:2014+A1:2019 for the plant and an assessment against internal levels in BS 8233:2014 for the neighbouring residential rooms. Low frequency content is often dealt with separately, because the standard rating methods under-represent it.
Mitigation is structural and expensive if left late. Isolated floating floors, resilient ceiling hangers and acoustic doors have to be in the fit-out budget, not added after a complaint.
Alcohol and the second consent
If you plan to sell alcohol, you need a premises licence under the Licensing Act 2003 from the same council acting as licensing authority, and that is a separate decision with separate representations. The four licensing objectives are not the same as planning's material considerations, and a planning permission does not secure a licence or the reverse.
Where alcohol is a material part of the offer, the planning use may shift again. A venue whose main business is drinking with games attached is closer to a drinking establishment, which is sui generis, than to Class E(d). Describe the business honestly in both applications, because the inconsistency between a licensing application and a planning statement is the first thing an objector will point out.
Making the application
For a sui generis change of use, expect to submit a location plan, existing and proposed floor plans showing the layout and the escape routes, a Planning Statement addressing town centre policy and amenity, the noise evidence, a servicing and waste position, and a travel or parking statement where the authority's threshold is met.
An illustrative example. A 220 m² first floor unit above a parade of shops, four game rooms, a maximum of 36 customers on site, sessions from 10am to 10pm, no alcohol, two flats above. The planning case is amenity rather than retail policy: sound transmission to the flats, the pattern of arrivals and departures at session changeovers, and whether the stair access is adequate. The report set is small, and the conditions will be hours, occupancy and a sound insulation scheme to be approved before occupation.
Settle the use class first. Everything in the budget depends on whether this is an application or a fit-out.
If you want to see which reports a change of use like this is likely to need, browse the 66 report types by category.
This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
What use class is an escape room?
There is no settled answer. Authorities treat escape rooms either as Class E(d), indoor sport, recreation or fitness, or as sui generis. The argument for Class E(d) rests on the word recreation; the argument against is that the use resembles the paid entertainment uses removed from the classes by the 2020 amendment. Ask the authority in writing before committing.
Why does sui generis matter if I am applying anyway?
Because it removes future flexibility. A Class E(d) use can move to any other Class E use without permission and keeps the Class MA prior approval route to residential open. A sui generis use needs permission for any change, and authorities normally attach conditions on hours, occupancy and amplified sound that travel with the permission.
How do I get a binding answer on the use class?
Apply for a certificate of lawful proposed use or development under section 192 of the Town and Country Planning Act 1990. Pre-application advice is an opinion and does not bind the authority, whereas the certificate is a formal determination. On a unit you are taking a long lease on, the fee is usually worth paying.
What noise evidence will the council want?
Where flats sit above or beside the unit, expect a request for an assessment of plant noise using BS 4142:2014+A1:2019 and of internal levels in neighbouring rooms against BS 8233:2014. Low frequency content from soundtracks and rumble effects is often treated separately, because standard rating methods under-represent it. Budget structural mitigation into the fit-out.
Does a premises licence cover the planning position?
No. A premises licence under the Licensing Act 2003 is a separate decision made against the four licensing objectives, not planning's material considerations. Neither consent secures the other. Describe the business the same way in both applications, because inconsistencies between them are the first thing an objector raises.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.