Wales, Scotland and Northern Ireland

Scotland: croft land and planning for a new house

6 min readBy PlanScope Editorial Team

Two consents, two bodies, neither binding the other. Decrofting removes the house site from crofting tenure but grants no right to build.

This article is about Scotland only. Building a new house on croft land needs two separate consents from two separate bodies: planning permission from the planning authority, and a crofting consent from the Crofting Commission, usually a decrofting direction that removes the house site from crofting tenure. Neither body waits for the other, neither one's decision binds the other, and getting them in the wrong order is how croft house projects lose a year. The planning authority will not ask whether the land has been decrofted. The Commission will not ask whether planning permission is likely.

PlanScope's drafting is grounded in English national policy, so a Scottish application needs National Planning Framework 4 and the local development plan checked by the professional reviewing the draft.

Two consents, two bodies

Crofting tenure is a statutory system of landholding governed by the Crofters (Scotland) Act 1993, amended by the Crofting Reform (Scotland) Act 2010 and later legislation. It regulates who holds croft land, what they must do with it and what consents are needed to change its use.

Planning permission is a separate matter entirely, determined by the planning authority against the development plan, which in Scotland comprises National Planning Framework 4 together with the local development plan.

The two systems ask different questions. The Commission asks whether removing land from crofting is justified and what it does to the croft and the crofting community. The planning authority asks whether a house in that location, of that design, with that access and drainage, is acceptable. A yes from one is no indication of a yes from the other.

Our explainer on the hierarchy of developments in Scotland sets out how the planning side categorises applications and what that means for procedure.

What decrofting achieves

A decrofting direction takes a defined area of land out of crofting tenure, so it is no longer subject to the crofting duties and restrictions. For a house site, that is usually what a lender will require before advancing funds, and what a purchaser's solicitor will look for on a future sale.

The Commission may give a direction where it is satisfied the land is to be used for a reasonable purpose, and building a dwelling for the crofter or a family member is a recognised purpose. The area applied for is normally kept to the house, garden ground and access rather than a generous curtilage, because the Commission looks at the effect on the remaining croft.

Note what decrofting does not do. It does not grant any right to build. It does not create a separate title by itself. And it does not remove the crofting duties attaching to the rest of the croft.

Crofting Commission process in outline

The application goes to the Commission on its form, with a plan of the area, the purpose, and information about the croft and the applicant's position. Owner-occupier crofters and tenant crofters apply under different provisions, so identify which you are before completing anything.

  1. Confirm the croft's entry in the Crofting Register or the Register of Crofts, and that the boundaries on record match reality
  2. Prepare a site plan showing the area to be decrofted, with dimensions and access
  3. State the purpose, and the reasons the area applied for is the area needed
  4. Comply with the notification requirements, which include advertising and notifying interested parties such as the landlord and any grazings committee
  5. Allow for a period in which representations can be made
  6. Expect the Commission to consider the interests of the croft, the estate, the crofting community and sustainable development

Compliance with the crofting duties is part of the picture. The duties include being ordinarily resident within 32 kilometres of the croft and not misusing or neglecting it, and an application from someone visibly in breach is a harder application.

Planning policy for rural housing

National Planning Framework 4, adopted in February 2023, carries the national policies on rural homes and rural development, and the local development plan adds area specific policy. Many authorities in crofting areas also publish siting and design guidance for new houses in the countryside, and reading it before sketching anything saves a cycle of revisions.

The recurring tests are familiar across rural Scotland. Whether there is a justification for a house in that location. Whether the siting respects landform, settlement pattern and existing building groups. Whether the access is safe and the visibility adequate. Whether water and drainage can be provided without harm.

Croft status is a material consideration in the planning decision but it is not a trump card. A site that is poorly related to the settlement pattern and prominent in the landscape will struggle whether or not it is croft land.

Siting and design expectations

Rural authorities are consistent about what they want, and the guidance tends to say the same things.

  • Site the house with the land, using existing contours, dykes and shelter belts rather than cutting a platform on open ground
  • Relate the house to an existing building group where one exists
  • Keep the footprint simple, with a modest ridge height and a traditional proportion of wall to roof
  • Use a restrained palette of materials, with roof colour and finish often specified in guidance
  • Avoid long, exposed access tracks and prominent engineered driveways
  • Deal with external lighting, because dark skies matter in many of these areas

Where the site is within or near a designation, the relevant body becomes a consultee. Landscape designations, protected species and habitats, and listed buildings or scheduled monuments all bring their own evidence requirements.

Water and drainage on a croft site

This is where croft house projects most often get expensive, and it is worth resolving before the planning application rather than during it.

Public water mains are often absent, so a private water supply may be needed, with its own quality testing and regulatory requirements. A private supply serving a single dwelling is treated differently from one serving several, and the testing obligations follow.

Foul drainage will usually be a septic tank or a package treatment plant with a soakaway or a discharge to a watercourse. The discharge needs authorisation from the environmental regulator, separately from planning permission, and the soakaway needs percolation testing to establish that the ground can take the effluent. Do the percolation test before you fix the house position, because a failed test moves the house.

Surface water needs a route too, and on sloping croft land the usual answer is infiltration where the ground allows and a controlled discharge where it does not.

Sequencing the applications

The order that protects you is usually planning first, decrofting second.

Apply for planning permission in principle for the house site, which establishes whether the authority accepts a house in that location before you spend money on a full design or on crofting procedure. Then apply to decroft the area the approved site plan shows, which gives the Commission a defined area with a demonstrated purpose.

The reverse order carries a specific risk. Decroft first and you may remove land from crofting tenure for a house the planning authority will not accept, leaving you with a changed tenure position and no development. The Commission's decision cannot be assumed to be reversible.

Where funding is involved, check what the lender or any grant scheme requires and when, because that can dictate the sequence regardless of what is otherwise sensible. Our notes on local place plans in Scotland and listed building consent in Scotland cover two of the other Scottish processes that can intersect with a rural house project.

This is general guidance, not legal advice. Check the position with your planning authority, the Crofting Commission or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do I need to decroft land before applying for planning permission?

No, and usually you should not. The planning authority does not ask whether land has been decrofted. Applying for planning permission in principle first establishes whether a house is acceptable in that location, so you avoid removing land from crofting tenure for a development that will not be permitted.

What does a decrofting direction actually do?

It takes a defined area out of crofting tenure so the crofting duties and restrictions no longer apply to it. Lenders and future purchasers generally require it for a house site. It does not grant any right to build, does not create title by itself, and does not affect the duties on the rest of the croft.

How large an area will the Commission decroft?

Normally the house, garden ground and access rather than a generous curtilage, because the Commission considers the effect on the remaining croft. State the purpose and explain why the area applied for is the area needed, with a site plan showing dimensions and the access.

Does croft status help a planning application?

It is a material consideration but not decisive. The authority applies National Planning Framework 4 and the local development plan, asking whether a house is justified in that location and whether the siting respects landform and settlement pattern. A prominent site poorly related to existing buildings will struggle either way.

What drainage evidence does a croft house application need?

Percolation testing for a soakaway, the position and design of the treatment plant or septic tank, and the proposed discharge point. The discharge needs authorisation from the environmental regulator separately from planning permission. Carry out the percolation test before fixing the house position, because a failed test moves the house.

Sources and further reading

scotlandcroftingdecroftingrural housingnpf4drainage

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Wales, Scotland and Northern Ireland

View all →
Wales, Scotland and Northern Ireland7 min read

Northern Ireland: development in areas of natural beauty

Development in a Northern Ireland area of outstanding natural beauty is judged on siting and integration as much as principle. The landscape test is where most schemes fail.

Read article →
Wales, Scotland and Northern Ireland6 min read

Scotland: the infrastructure levy power and its status

Scotland has an enabling power for an infrastructure levy and no regulations to bring it into effect. Section 75 obligations still carry developer contributions.

Read article →
Wales, Scotland and Northern Ireland7 min read

Wales: the sustainable transport hierarchy in applications

In Wales the sustainable transport hierarchy is national policy applying to site choice and layout, not just to the transport chapter. Active travel duties and maximum parking standards follow from it.

Read article →
Wales, Scotland and Northern Ireland7 min read

Scotland: open space and play provision policy

Scotland puts open space strategies and play sufficiency assessments on a statutory footing. What they mean for layout, standards and section 75 obligations.

Read article →
Wales, Scotland and Northern Ireland7 min read

Wales: minerals and aggregates policy in applications

Welsh minerals applications run on MTAN 1, the regional technical statements and the well-being duty. What to assess and what the submission has to contain.

Read article →
Wales, Scotland and Northern Ireland7 min read

Northern Ireland: the Department's call-in power explained

A call-in takes an application out of a council's hands and removes the appeal to the Planning Appeals Commission. The criteria, the process and the programme risk.

Read article →