Stables and a manege on a paddock: planning rules

8 min readBy PlanScope Editorial Team

Stabling horses and riding them on an all-weather surface is a change of use away from agriculture, and it removes the holding's agricultural permitted development rights. What to apply for and what the council will ask about.

Putting stables and a manege on a paddock needs planning permission almost every time, because keeping horses for riding is not agriculture. Grazing horses on a field can be agricultural use. Stabling them, exercising them on an all-weather surface and keeping tack and feed on site is a change of use, and that change removes the agricultural permitted development rights the holding had before. Owners who build the stables first and ask afterwards usually find that the manege, the lighting and the access are the parts the council cares about.

Expect to apply for a change of use of the land plus the buildings and engineering works together, in one application, with a drainage position for the manege and a lighting case if you want to ride after dark.

Why keeping horses is not agriculture

Section 336 of the Town and Country Planning Act 1990 defines livestock as creatures kept for the production of food, wool, skins or fur, or for use in the farming of land. A horse that pulls a plough is farming the land. A horse ridden at weekends is not.

The distinction has been settled for decades and the practical line is about what the land is used for rather than what the animal is. Land used only for grazing horses can remain in agricultural use. Once the land is used for keeping horses, which in practice means stables, a manege, jumps, a muck heap and feed storage, the use has changed and section 55 of the 1990 Act treats that as development.

Two consequences follow, and the second is the one that catches people out. The change of use needs permission. And once the land is in equestrian rather than agricultural use, Part 6 of Schedule 2 to the General Permitted Development Order 2015, which allows certain agricultural buildings on holdings of five hectares or more, no longer applies to it. You cannot put up a prior-notification agricultural barn on a paddock in equestrian use.

Moveable field shelters sit in a grey area. A portable shelter that is towed around a field, not fixed to the ground and not reliant on services may not amount to development at all, but authorities take different views and the question turns on the facts. A Lawful Development Certificate is the only formal way to confirm that works or a use are lawful. Anything built on a base, connected to water or left in one place for years will be treated as a building.

The application and where to draw the red line

Apply for full planning permission for a change of use of land to equestrian use, together with the erection of a stable block and the formation of a manege. Describe all three in the description of development. A permission for the stables alone leaves the manege unauthorised.

Draw the red line around the whole area that will be in equestrian use, including the access track, the manege, the muck storage area and any parking or horsebox turning space. A common mistake is a red line drawn tightly around the stable block, which leads an officer to conclude the rest of the field is unchanged and then to question the manege later.

Include a block plan at a standard scale with the manege dimensions, the stable footprint, levels, surfacing and drainage, plus a section through the manege showing the build-up. The Planning Statement should set out the number of horses, whether the use is private or commercial, who will visit and how often, and why this location rather than a position closer to existing buildings. A Design and Access Statement is not usually required by the procedure order for an application of this size, though several authorities ask for one and it is a sensible place to explain materials and siting.

Stable siting, scale and materials

Officers assess equestrian buildings as development in the countryside, where the starting point is that new buildings should be well related to existing built form. Grouping stables with an existing farmstead or barn group is the strongest position. An isolated block in the middle of an open field is the weakest.

Keep the eaves low, the roof pitch conventional and the materials dark: stained timber boarding, a slate or dark profiled sheet roof, and no white uPVC. Avoid a formal domestic look, because anything that reads as residential invites a condition restricting conversion and, in a Green Belt or National Landscape setting, strengthens an objection about creeping domestication of the countryside.

Scale follows need. Four boxes, a tack room and a feed store for four horses is straightforward to justify. Twelve boxes for a family with two horses is not, and the officer will read the surplus as a commercial livery in waiting.

Manege surfacing, drainage and run-off

A manege, often misspelled as a menage, is an engineering operation as well as a surface. A typical build-up runs excavation, a geotextile membrane, a sub-base, a permeable binder course and a sand or sand and fibre riding surface, with perimeter drainage.

Deal with run-off properly in the submission. The surface is permeable but the sub-base sits on whatever the subsoil happens to be, and on clay the water has to go somewhere. Set out the drainage design, the discharge point and the calculation basis, and show that run-off does not increase onto neighbouring land or into a watercourse. On larger sites, or where the authority asks, that becomes a Drainage Strategy with run-off rates and a maintenance regime. Where the paddock lies in Flood Zone 2 or 3, add a flood risk assessment and expect questions about displacement of flood water by the raised surface.

Levels matter more than people expect. A manege that needs a metre of cut and fill on a sloping paddock becomes a visible platform with retaining structures, and that is usually the single biggest landscape objection.

Floodlighting and the dark skies problem

Floodlighting is where most equestrian applications are won or lost, and it is assessed separately from the surface. Planning Practice Guidance on light pollution asks for the effect on amenity, on dark landscapes and on wildlife to be considered, and councils commonly apply the Institution of Lighting Professionals environmental zone system, where a dark rural area attracts far tighter limits on obtrusive light than a suburban one.

Submit a lighting design, not a product brochure. The design needs column heights, luminaire types with full cut-off optics, aiming angles, an isolux plot showing illuminance at the site boundary and at nearby dwellings, and a figure for upward light. In a National Landscape or National Park, assume you will be asked to reduce column heights and to accept a curfew. A Lighting Assessment prepared against the relevant guidance note is the document that answers this, and councils usually expect a suitably qualified author, with professional review strongly advised before submission.

The planning issues are close to those raised by a floodlit all-weather pitch, with one difference: equestrian schemes are more often in properly dark countryside, so the baseline is lower and the same lux figure causes more harm.

Muck storage, flies and environmental health

Four horses produce a surprising volume of muck, and the heap is a statutory nuisance risk under the Environmental Protection Act 1990 if it is badly sited. Show the storage location on the plan, keep it well away from neighbouring dwellings and from any watercourse, borehole or ditch, and say how it will be contained and how often it will be removed.

Environmental health officers consulted on these applications ask about flies, odour and leachate. A sealed base with no drainage to a watercourse, a stated removal frequency and a reasonable separation distance answers most of it. Guessing at the separation distance does not, so ask the authority what it expects.

Access, horsebox turning and visibility

The highway authority is the consultee most likely to object. A field gate used occasionally for a tractor is treated differently from an access used daily by cars, and daily by a horsebox if you compete.

Set out visibility splays in both directions measured from a stated set-back, show a vehicle can turn within the site so nothing reverses onto the highway, and provide a swept-path drawing where a horsebox or a trailer is involved. Gates should open inwards with hardstanding behind them. Where the access is onto a fast rural road with no footway, expect the splay requirement to be long and the conversation to be about whether the access can be moved rather than whether it can be improved.

Conditions that keep the use private

A permission for private equestrian use is normally conditioned to stop it becoming a business without a further application. Typical conditions restrict the use to private purposes only with no livery, riding school, competitions or events, limit the number of horses, control floodlighting hours, require the lighting to be installed as approved, and prevent conversion of the stables to living accommodation.

Read those conditions before you accept them. If you intend to take in two liveries to help with costs, say so in the application and justify it, because applying later to vary a condition restricting commercial use is harder than getting the right permission first. This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

Enter your postcode on PlanScope to see which reports a paddock scheme is likely to need. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do I need planning permission to keep horses in a field?

Grazing alone can remain agricultural use. Keeping horses, which in practice means stables, a manege, jumps, feed storage and a muck heap, is a change of use requiring permission. The line turns on how the land is used rather than on the number of horses. A Lawful Development Certificate is the only formal way to confirm that an existing use is lawful.

Does a manege need planning permission?

Almost always. Forming a manege involves excavation, a sub-base and a riding surface, which amount to engineering operations and development. Apply for it in the same application as the change of use and the stables, with a section showing the build-up, the levels and the drainage design, including where run-off will discharge.

Can I use agricultural permitted development for stables?

No. Part 6 of Schedule 2 to the GPDO 2015 applies to agricultural units, and keeping horses for riding is not agriculture. Once land is in equestrian use those rights no longer apply to it, so a prior-notification agricultural building cannot be used to deliver stables on a paddock in equestrian use.

Will the council allow floodlighting on a manege?

Sometimes, with limits. Submit a lighting design with column heights, full cut-off luminaires, aiming angles, an isolux plot at the boundary and nearby dwellings, and an upward light figure. In a National Landscape or National Park expect lower columns and a curfew condition. Planning Practice Guidance on light pollution sets out the considerations.

Can I run a livery from a private stable permission?

Not if the permission is conditioned to private use only, which is common. Conditions typically exclude livery, riding schools, competitions and events, and limit horse numbers. If you intend any commercial element, include it in the application with justification rather than applying later to vary the condition.

Sources and further reading

equestrianstablesmanegechange of userural planningfloodlightingpermitted development

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Project Type Guides

View all →
Project Type Guides7 min read

Funeral directors: use class and town centre frontage

The 2020 Use Classes amendment left funeral directors ambiguous. Here is how to settle the class and answer a protected shopping frontage objection.

Read article →
Project Type Guides7 min read

Waste transfer: which authority decides and the permit

In two tier areas the county decides waste applications, not the district. Here is the policy test, the odour and noise evidence, and how the permit fits.

Read article →
Project Type Guides7 min read

Micro-breweries with a taproom as a mixed use problem

A taproom beside a brewhouse creates a mixed use the Use Classes Order does not cover. Here is how to evidence odour, noise, effluent and parking.

Read article →
Project Type Guides7 min read

Self storage in Class B8 and the job density objection

Councils rarely dispute that self storage is Class B8. They dispute jobs per square metre. Here is the evidence base that answers an employment land objection.

Read article →
Project Type Guides7 min read

Padel courts: ball noise, floodlights and the planning case

Padel applications turn on impact noise and floodlighting. Here is the evidence base councils expect, and the conditions worth negotiating before approval.

Read article →