Temporary changes of use under Part 4 of the GPDO
Class B of Part 4 gives 28 days of any use on open land, but excludes buildings and their curtilage. Most lawful pop-ups rely on Class E flexibility instead.
The 28 day rule is the best known permitted development right in England and the most frequently misapplied. Class B of Part 4 of Schedule 2 to the Town and Country Planning (General Permitted Development) (England) Order 2015 permits the use of land for any purpose for not more than 28 days in total in any calendar year, together with the provision on that land of any moveable structure for the purposes of the permitted use. Of those 28 days, no more than 14 may be used for holding a market or for motor car and motorcycle racing.
Here is the limitation that defeats most pop-up plans: Class B does not apply where the land in question is a building, or is within the curtilage of a building. So a vacant shop unit, a warehouse, a car park attached to a pub, a yard inside a factory boundary: none of those get the 28 days. The right is for open land.
What the right actually covers
A field used for a county show, a car boot sale on open land, a temporary car park on a cleared site, a festival on a farm. Those are the shape of use Class B was written for, and the moveable structure provision is what allows marquees, stalls and portable buildings to come with it.
The use can be anything, which is unusual in permitted development. There is no restriction by use class, so a use that would be sui generis if it were permanent is still within the right, provided the day count and the other limitations are respected.
The structures must be moveable and must be removed at the end of the period. Anything requiring foundations, drainage connections or ground works is likely to be operational development in its own right, needing its own permission, and that is a common enforcement subject on sites that run events year after year.
Counting the days
The count runs by calendar year, so it resets on 1 January and does not roll over. Every day on which the land is used for the temporary purpose counts as a whole day, including part days.
Set-up and take-down are the contested part. Where the activity on those days is itself part of the temporary use, erecting the marquee for the event, the days count. Where the land is simply being tidied afterwards and the temporary use has ended, the position is arguable. Authorities generally count generously against the operator, and running close to 28 is a poor plan.
Keep a dated log. Where an authority alleges that the right has been exceeded, the burden of showing the use was lawful falls on the operator, and a diary with photographs is the evidence that settles it.
One point that catches multi-use sites: the 28 days attaches to the land, not to the operator or to each different use. Four events of seven days each by four different organisers on the same field use up the whole allowance.
The limitations that remove the right
| Limitation | Effect |
|---|---|
| Land is a building or within the curtilage of a building | Class B does not apply at all |
| Use as a caravan site | Excluded from the right |
| Certain uses on a site of special scientific interest | Excluded, including motor racing and clay pigeon shooting |
| A condition on an existing planning permission restricting use of the land | Permitted development cannot authorise a breach of that condition |
| An Article 4 direction removing the right | Application required instead |
| Display of advertisements | Separate consent under the advertisement regulations |
The condition point is the one professionals miss. Where a site has a permission with a condition limiting its use, article 3(4) of the Order means the Part 4 right cannot be used to do something the condition prohibits. Check the planning history before relying on the 28 days, not afterwards.
What happens at the end of the period
The land reverts to its previous lawful use. That is the defining feature of a temporary right, and it means the temporary use never becomes the lawful use of the land however many years it is repeated.
This matters for two reasons. An operator who has run a market on the same field every summer for a decade has no accrued rights, because each year's use was permitted development with a reversion built in. And a landowner cannot use repeated temporary use to establish a lawful commercial use through the passage of time, because the use was lawful each year under the right rather than unlawful and tolerated.
If you want the use to become permanent, apply for planning permission. A temporary planning permission for a fixed period, with a reversion condition, is also available and is a better fit for a two or three year meanwhile use than attempting to stretch the 28 days.
Buildings, pop-ups and what actually applies
For a vacant unit in a high street, the answer is usually not Part 4 at all.
Where the unit has a lawful Class E use, moving between the activities within Class E is not development, so a shop can become a cafe, an office, a gym or a nursery without permission, subject to any condition on the permission and to the physical works needing consent. That flexibility is what makes most pop-ups lawful, as our note on trampoline parks and indoor leisure capacity illustrates for one of the harder cases.
Where the proposed use falls outside Class E, for example a drinking establishment, a hot food takeaway or a venue for live music, that use is sui generis and a change to it needs permission regardless of how short the occupancy. A short-term temporary permission is the route, with the fit-out assessed on its merits. Extraction and odour are the usual sticking points for any food use, and a ventilation and extraction statement is often what decides whether environmental health objects.
Other classes in Part 4 give longer temporary rights for specified purposes, including film-making and temporary use as a state-funded school, each with its own conditions, area limits and notification requirements. Part 4 has been amended repeatedly since 2015, so read the current text of the Part rather than a summary, including this one.
Conditions that attach to the right
Permitted development is not unconditional. Class B carries the day limits and the removal of structures at the end of the use. The wider Order adds the general restrictions in article 3, including that permitted development does not authorise anything requiring other consents, does not apply where an Article 4 direction is in force, and does not authorise works to a listed building or development on article 2(3) land where the relevant class says so.
Separate regimes still apply in full: licensing for alcohol and regulated entertainment, environmental health for food and noise, highway licences for anything on the public highway, fire safety, and temporary event notices.
Recording the start and end dates
Make the record contemporaneous. A simple sheet per event with the date, the hours, the activity, the structures present and a photograph takes five minutes and is the difference between a straightforward answer to an enforcement enquiry and a protracted one.
Where you are near the limit or where the lawfulness is contested, a certificate of lawfulness for an existing or proposed use is the formal route to certainty, and the day log is the evidence that supports it.
An honest caveat: the treatment of set-up and take-down days has never been settled definitively, and authorities differ. Build in a margin rather than planning to the last day.
PlanScope can draft the planning statement for a temporary permission or a change of use application, structured to UK planning policy, flagging the site facts it needs you to confirm. Drafts should be reviewed before submission, and PlanScope does not guarantee planning approval. Where a unit has been vacant and a longer term residential conversion is in mind, our note on Class MA: the three month vacancy rule no longer applies covers that route.
This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.
Frequently asked questions
Does the 28 day rule apply to an empty shop?
No. Class B of Part 4 is excluded where the land in question is a building or is within the curtilage of a building, so a vacant unit, a warehouse or a yard inside a building's curtilage cannot use it. Most lawful pop-ups in buildings rely instead on movement within Class E, or on a temporary planning permission.
How are the 28 days counted?
By calendar year, resetting on 1 January with no roll-over, and each day of use counts as a whole day including part days. The allowance attaches to the land rather than to the operator, so several organisers using the same field share one allowance. Keep a dated log with photographs, because the burden of proving lawfulness falls on the operator.
Does repeated temporary use become lawful over time?
No. The land reverts to its previous lawful use at the end of each period, which is the defining feature of a temporary right. Running a market on the same field every summer for a decade accrues no rights, because each year's use was permitted development with reversion built in rather than an unlawful use being tolerated.
Can a planning condition cancel the 28 day right?
Yes, in effect. Article 3(4) of the Order means permitted development cannot authorise development that breaches a condition on an existing planning permission. Where a site carries a condition limiting its use, the Part 4 right cannot be used to do something that condition prohibits, so check the planning history before relying on it.
What about markets and motor racing?
Within the 28 day allowance, no more than 14 days may be used for holding a market or for motor car and motorcycle racing. Certain uses, including motor racing and clay pigeon shooting, are excluded altogether on a site of special scientific interest. Advertisement display and licensing are separate regimes that still apply in full.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.