Use Classes and Change of Use

Use Classes Order 2020: what changed and what it saved

7 min readBy PlanScope Editorial Team

The 2020 amendment created Class E and pushed pubs and takeaways into sui generis, but it preserved the revoked class definitions for interpreting earlier permissions, conditions and Article 4 directions.

The Use Classes Order 2020 amendment revoked the A classes, B1, D1 and D2, created Classes E, F1 and F2 and pushed pubs, takeaways and cinemas into sui generis. The part practitioners still get wrong is what it saved. References to revoked classes did not stop meaning anything on 1 September 2020. They survive in conditions, in Article 4 directions, in section 106 agreements and in adopted local plan policies, and each of those is read against the definitions that applied when it was written.

So on any site with a pre-2020 permission, start with what the document in front of you meant when it was drafted, before asking which class the use falls into today.

Which classes went and which arrived

The Town and Country Planning (Use Classes) (Amendment) (England) Regulations 2020 came into force on 1 September 2020. Out went A1 shops, A2 financial and professional services, A3 restaurants and cafes, A4 drinking establishments, A5 hot food takeaways, B1 business, D1 non-residential institutions and D2 assembly and leisure.

In came three classes. Class E, commercial, business and service, runs from E(a) retail through E(b) food and drink consumed on the premises, E(c) financial, professional and other services, E(d) indoor sport and fitness, E(e) medical and health services, E(f) creches and day nurseries, to E(g) offices, research and development and light industry compatible with a residential area. Class F1 holds learning and non-residential institutions, including schools, museums, libraries, public halls and places of worship. Class F2 holds local community uses, including small shops of no more than 280 m² selling mostly essential goods where there is no other such shop within 1,000 metres.

Pubs, hot food takeaways, cinemas, concert halls, bingo halls, dance halls and live music venues became sui generis, which means every change of use into or out of them needs permission. B2 general industrial and B8 storage and distribution were untouched.

The practical effect inside Class E is wide. A shop can become an office, a nursery or a gym with no planning application, because a change of use within a class is not development under section 55(2)(f) of the Town and Country Planning Act 1990.

The transitional period and what it preserved

The amendment created a gap it then had to patch. The General Permitted Development Order 2015 was drafted around the old classes, so revoking them would have switched off a long list of permitted changes overnight.

The 2020 Regulations therefore provided that, until 31 July 2021, references in the General Permitted Development Order and other instruments to the revoked classes continued to be read as references to those classes as they had effect before 1 September 2020. For eleven months the old permitted development rights kept working on the old vocabulary.

From 1 August 2021 the rewritten Part 3 took over, with Class MA introducing the commercial to residential route from Class E to C3. The three month vacancy rule under Class MA has itself since changed, which is a reminder that Part 3 is amended more often than any other part of the Order.

Saving provisions that keep the order working

Two savings do most of the work in practice.

The first preserves the meaning of the revoked classes for interpreting documents written before the amendment. A permission, condition, agreement or direction that refers to Class A1 is read by reference to A1 as it was defined when that document took effect. The 2020 Regulations did not rewrite earlier permissions, and the courts construe a condition as at the date of its grant in any event.

The second keeps the use classes machinery available for determining whether a change is development at all. Where a building's lawful use was A3 and nothing has changed on the ground, the lawful use today is read as falling within E(b), so movement within Class E is available. Where the lawful use was A5, it is sui generis and nothing is available without permission.

That asymmetry explains most of the disputes. Two neighbouring units that looked alike in 2019 now have completely different flexibility, and the difference turns on whether hot food was sold for consumption off the premises.

Why revoked class references still appear in conditions

Conditions outlive the orders they cite, and the stock of permissions granted between 1987 and 2020 is enormous.

A typical condition on a 1990s retail warehouse restricted the use to Class A1 only, excluding food retail, with a limit on the net sales area. Nothing in the 2020 amendment lifted that restriction. The unit cannot slide across Class E to become a gym, because the condition, properly construed, confines it to retail as A1 was then defined. The owner's route is a section 73 application to vary or remove the condition, with the usual planning assessment that brings.

The opposite error is just as common. Officers sometimes treat any old A1 condition as a prohibition on all movement within Class E, when the condition in fact says only that the premises shall be used as a shop and for no other purpose within the former Class A1. Read the words. The scope of the restriction is a question of construction, and a condition imposed simply to confirm the permitted use may not restrict later movement at all.

A Planning Statement on a change of use application should quote the condition in full, set out the construction relied on and explain what the applicant says the lawful use is. Officers rarely argue with a quoted condition.

Article 4 directions made before September 2020

Directions drafted around the former classes remain in force, and they are read against the definitions that applied when the direction was made. A direction removing the Class A1 to A2 permitted change still bites on the right of way it withdrew, but it does nothing about movement inside Class E, because that movement is not permitted development at all.

Many authorities have remade or replaced directions since 2021, particularly for office to residential under Class MA and for houses in multiple occupation. Check the authority's own Article 4 register and the direction's confirmation date rather than relying on a constraint layer, because mapped layers lag the legal position.

And a direction cannot withdraw something the General Permitted Development Order does not grant. Movement within a use class is outside the Order altogether, so only a condition, a section 106 obligation or a new class definition can control it.

Local plan policies using superseded names

Plans adopted before 2020 are full of A1 frontage policies, D1 community facility protections and B1 employment allocations. Section 38(6) of the Planning and Compulsory Purchase Act 2004 still requires determination in accordance with the development plan unless material considerations indicate otherwise, so those policies apply.

Read them purposively. A policy protecting A1 retail frontage in a primary shopping area is aimed at active retail use, so an application to use the unit as an office under E(g) engages the purpose of the policy even though the label has changed. Conversely, a policy protecting D1 community uses now spans both F1 and part of E(e) and E(f), and the split matters because movement within Class E can defeat the protection without any application at all.

That gap is why many authorities have brought forward Article 4 directions over community and health uses, and why a sports or social club falling in F2 or sui generis attracts a different level of protection from an identical building inside Class E.

Reading an old permission against the current order

Work in this order on any site with history.

  1. Establish the lawful use as a matter of fact on the ground, not from the label on the last permission.
  2. Collect every permission, condition, agreement and direction affecting the unit, with dates.
  3. Construe each condition as at its date, using the class definitions then in force.
  4. Map the lawful use onto the current classes to see what movement is available.
  5. Check Part 3 of the General Permitted Development Order for any permitted change, and check whether an Article 4 direction has withdrawn it.
  6. Decide whether a lawful development certificate, a section 73 application or a full application is the cleanest route.

Where the use is sui generis, step four produces nothing and the answer is a full application. That is when the supporting documents start to matter: a Transport Statement where trip generation changes, and a ventilation and extraction statement where cooking or plant is involved.

One honest uncertainty. The construction of pre-2020 conditions that refer to revoked classes is still being argued, and the outcome turns on the precise wording and on the reason the condition was imposed. Where real money depends on it, get the advice in writing before you exchange.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What did the 2020 Use Classes amendment actually revoke?

Classes A1, A2, A3, A4, A5, B1, D1 and D2 were revoked with effect from 1 September 2020. Class E, F1 and F2 replaced most of them, while drinking establishments, hot food takeaways, cinemas, concert halls, bingo halls, dance halls and live music venues became sui generis. B2 and B8 were left unchanged.

Does an old condition restricting use to Class A1 still work?

Yes. The condition is construed as at the date it was imposed, using the class definitions then in force, and the 2020 Regulations preserved those definitions for that purpose. A unit restricted to A1 retail cannot move freely around Class E, and removing the restriction requires a section 73 application.

Can I change from a shop to an office without permission?

Where the lawful use falls within Class E and no condition, obligation or other restriction prevents it, yes. A change of use within a single class is not development under section 55(2)(f) of the Town and Country Planning Act 1990. Check the permission history first, because conditions are the usual obstacle.

How long did the transitional period last?

Until 31 July 2021. During that period, references in the General Permitted Development Order and other instruments to the revoked classes were read as references to those classes as they stood before 1 September 2020. The rewritten Part 3, including Class MA, took effect from 1 August 2021.

Do Article 4 directions made before 2020 still have effect?

They remain in force and are read against the class definitions that applied when they were made. A direction can only withdraw rights the General Permitted Development Order grants, so it cannot control movement within a single use class. Many authorities have remade directions since 2021, so check the council's own register.

How do old local plan policies apply to the new classes?

They still apply under section 38(6) of the Planning and Compulsory Purchase Act 2004 and are read purposively. A policy protecting A1 retail frontage is aimed at active retail, so it engages an application for office use within Class E, even though the label has changed. Interpretation is argued case by case.

Sources and further reading

use classesclass echange of usearticle 4planning conditionsgpdo

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use7 min read

Pub to restaurant or shop: what consent a change needs

There is no permitted development route out of a pub. What the 2020 Use Classes amendments changed, and the marketing and viability evidence councils require.

Read article →
Use Classes and Change of Use7 min read

House to small HMO: the C3 to C4 change explained

The C3 to C4 change is permitted development until an Article 4 direction or a seventh occupant removes it. Here is what each situation requires.

Read article →
Use Classes and Change of Use7 min read

Changing part of a building and the subdivision trap

Why dividing one planning unit into two can need permission, what physical evidence points to two units, and the severance conditions hiding in old permissions.

Read article →
Use Classes and Change of Use6 min read

Mixed use: when one permission covers two activities

Why a mixed use sits outside the Use Classes Order, how to draft the description of development, and what it costs you in later flexibility.

Read article →
Use Classes and Change of Use6 min read

Retrospective change of use and the certificate route

How a certificate of lawful existing use differs from a retrospective planning application, what evidence proves a use on the balance of probability, and the sequencing that keeps both routes open.

Read article →
Use Classes and Change of Use7 min read

Converting a pub: the consents a sui generis use needs

A drinking establishment is sui generis, so any change of use or demolition needs planning permission. Marketing evidence is where most applications fail.

Read article →