TRICS trip rates or a site specific survey
Database trip rates are the default for housing, offices and most retail. Unusual or operator-specific uses often justify surveying comparable sites instead. The filters decide the answer either way.
Choosing trics or site specific trip survey evidence comes down to whether the national database holds enough comparable sites for your land use, and whether the highway authority will accept the filters you apply. For housing, offices and most retail the database is the default and a bespoke survey invites questions. For an unusual use, a drive-through, a crematorium, a place of worship, a logistics unit with a single operator, the database often has too few sites to be useful and a survey of comparable operations is the stronger evidence.
How database trip rates are derived
The database holds multi-modal surveys of individual sites, each recording vehicle and person arrivals and departures in time bands, together with a description of the site, its parking provision, floorspace or unit count, and its surroundings.
A trip rate is produced by selecting a set of surveyed sites, dividing the observed trips at each by the relevant unit of development, and averaging. The unit is dwellings for housing, usually 100 square metres of gross floor area for commercial uses.
That means the output is only as good as the selection. Two consultants can produce rates differing by a third from the same database by filtering differently, which is why the method section matters more than the result.
Keep the selection audit trail in an appendix. Every site included, every site excluded and why, the date range used, and the final sample size.
Site selection and filtering criteria
The filters that change the answer most are the ones the highway authority will interrogate.
- Land use category and subcategory, which decides the pool before anything else.
- Region and location type, separating town centre, edge of town centre, suburban and edge of town sites.
- Parking provision per unit, because a constrained site generates fewer vehicle trips.
- Population or household count within a defined radius, as a proxy for accessibility and local catchment.
- Survey date range, since older surveys reflect different travel patterns and online shopping behaviour.
- Day of week and whether school term time applies.
A sample of fewer than five sites is thin, and a sample of one is not a trip rate. Where the filters leave you with two sites, loosen one filter deliberately and explain the trade-off, rather than presenting a tiny sample with the same confidence as a large one.
Watch the geographic filter in particular. Selecting only sites in the same region is tempting and often leaves too small a sample, while selecting nationally and ignoring location type produces rates that overstate car use for an urban site.
Where a bespoke survey performs better
Four situations justify going out and counting.
The first is an unusual land use with few surveyed examples. The second is an operator-specific use where the same operator runs comparable sites you can survey, which gives evidence no database can match. The third is a site where the existing use has to be measured, because the assessment turns on the net change in trips rather than on the gross figure. The fourth is a case where the database rates have already been challenged by the highway authority and a local comparator will settle it.
Survey design matters as much as the counting. Pick neutral months, which in practice means avoiding August, December, and the weeks around school holidays. Use manual classified counts for turning movements and automatic counters for link flows over a longer period. Survey at least two comparable sites rather than one, and record the characteristics of each so the read-across can be justified.
For a change of use, surveying the existing operation before it closes is often the single most valuable piece of evidence, and it is routinely missed because the survey is commissioned after the premises are vacant.
Mode share and location adjustments
Vehicle trip rates are not the whole picture. Where the assessment concerns capacity at a junction, vehicle trips matter. Where it concerns sustainable travel policy, person trips and mode share matter.
Mode share is normally drawn from census travel-to-work data for the relevant output areas, adjusted for the characteristics of the proposal. In London, public transport accessibility levels published by Transport for London are used directly, and a high accessibility site supports a car-free or car-capped scheme with correspondingly low vehicle trip generation.
Two adjustments are legitimate and often disputed. Internalisation, where trips happen within a mixed-use site and never reach the network. And pass-by or diverted trips for retail and food uses, where a proportion of customers are already on the road rather than making a new journey. Both need evidence and a stated percentage, and both should be presented as a sensitivity test as well as a central case.
Agreeing the method with the highway authority
Do this in writing before the modelling starts. A short scoping note setting out the land use category, the filters, the date range, the assessment years, the peak periods, the mode share source and the adjustments proposed will either be agreed or returned with changes, and either outcome is better than finding out at consultation.
Ask three questions explicitly. Which junctions are to be assessed and to what horizon year. Whether committed development has to be included in the baseline and from what list. And whether the authority has a preferred source for trip rates in your land use, because some authorities do.
Where thresholds are marginal, the choice between a Transport Statement and a full Transport Assessment is also worth settling at that stage, since it changes the scope and the cost. National guidance expects the scale of the assessment to be proportionate to the scale of the likely transport impacts.
Peak hour definitions
The network peak and the site peak are different, and reporting only one is a common weakness.
Network peaks are typically the busiest hour of the morning and evening on the surrounding road network, often around 08:00 to 09:00 and 17:00 to 18:00. A site peak may fall elsewhere entirely. A school peaks before the network morning peak and in the mid-afternoon. A food store peaks on Saturday. A place of worship peaks on a single day of the week and at a time no weekday survey captures.
Report both, then assess capacity against the combination that produces the worst case at each junction. Where the site peak falls outside the network peak, say so plainly, because it is usually a point in your favour.
An illustrative example
A developer proposes 60 flats on a former office site with a parking ratio of 0.4 spaces per unit, 400 metres from a railway station. Database rates filtered to suburban flats with low parking give a morning peak vehicle trip rate well below the rate for houses with two spaces each, and the existing office's surveyed trips are deducted as the baseline. The highway authority accepts the filters but asks for a sensitivity test at the unfiltered regional rate, which still shows no capacity problem at the two junctions assessed. The scheme proceeds with a travel plan and a cycle parking condition. The figures here are illustrative.
Presenting the trip generation case
Put the method, the selection and the arithmetic where a reviewer can follow them. A trip generation chapter should let someone reproduce your numbers from the appendices without asking you a question.
- State the land use, the quantum and the unit of development used.
- State every filter applied, with the resulting sample size and the sites included.
- Give the trip rates in the time bands assessed, for arrivals, departures and two-way flows.
- Apply the quantum to produce development trips, and show the deduction for any existing use.
- Apply mode share, internalisation or pass-by adjustments as separate, labelled steps.
- Present a sensitivity case with the adjustments removed.
Councils usually expect a suitably qualified transport planner for this work, and professional review is strongly advised. Where the scheme also needs parking evidence, that is a separate exercise set out on the Parking Survey page, and ongoing commitments are captured in a Travel Plan.
This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval, and for specialist technical reports, qualified professional input may be required.
Frequently asked questions
How many surveyed sites make a credible trip rate?
There is no fixed minimum, but a sample of fewer than five sites is thin and a single site is not a trip rate. Where filters leave too small a pool, loosen one filter deliberately and explain the trade-off in the method section. Highway authorities object far more often to an unexplained small sample than to a slightly wider one.
Which filters matter most?
Land use category, region and location type, parking provision per unit, the population or household count within a defined radius, the survey date range and whether term time applies. Parking provision and location type usually move the vehicle trip rate most, because a constrained urban site generates far fewer vehicle trips than an out-of-town equivalent.
When is a bespoke survey worth the cost?
Where the land use has few surveyed examples, where the same operator runs comparable sites you can count, where the existing use on your site needs measuring for a net change calculation, or where the highway authority has already challenged database rates. Surveying an existing operation before it closes is often the most valuable evidence available.
What are pass-by and diverted trips?
They are the proportion of customers at a retail or food use who are already travelling on the adjacent road and divert into the site, rather than making a wholly new journey. The adjustment is legitimate but needs evidence and a stated percentage, and it should be presented as a sensitivity test alongside a central case without it.
Should I report the network peak or the site peak?
Both. Network peaks are typically the busiest hour on the surrounding roads in the morning and evening, while the site peak may fall elsewhere entirely, as it does for schools, food stores and places of worship. Assess capacity against the worst combination at each junction, and say where the site peak falls outside the network peak.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.