Upward extensions on a terrace or semi: Class AA and Class AB

7 min readBy PlanScope Editorial Team

Class AA of Part 1 enlarges a house upwards. Class AB of Part 20 creates new flats on a commercial terrace building. The height caps and prior approval tests are different.

Adding a storey to a terraced or semi-detached house without a full planning application is possible, but the right that people search for as a class AB upward extension on a terrace is usually not the one that applies. Two separate rights sit in the General Permitted Development Order 2015. Class AA of Part 1, Schedule 2 enlarges an existing house upwards and the house stays one dwelling. Class AB of Part 20 is a different animal: it creates new, separate flats on top of a terrace building in commercial or mixed use. Pick the wrong one and the prior approval application fails at the first test.

Which right applies to a house

If you own a two storey terrace or semi and want a third storey as part of the same house, you are in Part 1 Class AA. It permits up to two additional storeys where the existing house has two or more storeys, and one additional storey where the house has a single storey, built immediately above the topmost storey.

If you own a terrace building in use as a shop, office or other Class E use, or in mixed commercial and residential use, and you want to build flats on the roof, that is Part 20 Class AB. If the terrace building is already in use as houses and you want to add separate new flats above, that is Part 20 Class AC.

The practical difference is what comes out the other end. Class AA gives you a bigger house in use class C3. Part 20 gives you new dwellings, which brings a far longer list of prior approval matters, a nationally described space standard condition and, in London, a different conversation about protected views.

The height caps under Class AA

Several limits apply at once, and the one that catches terraces is the comparison with next door.

Limit Figure
Additional storeys 2 where the house has 2 or more storeys, 1 where it has 1
Total height of the enlarged house Must not exceed 18 m
Increase over the existing roof height 7 m where the house has more than one storey, 3.5 m where it has one
Non-detached houses, compared with the adjoining building Must not exceed the highest part of that roof by more than 3.5 m
Floor to ceiling of each new storey No more than 3 m, and no more than the lowest existing storey

Read the row about adjoining buildings carefully. On a terrace of two storey houses, the 3.5 m comparison against the adjoining roof is what makes a full extra storey tight, because a conventional storey plus a pitched roof will often exceed it. Where the house sits at the end of a stepped terrace, the comparison is taken against the adjoining building with the highest roof, which can help.

Also note the age exclusions. The right does not apply where the house was built before 1 July 1948 or after 28 October 2018, which rules out most Victorian and Edwardian terraces in inner London and most recent estate housing.

Conditions on materials, pitch and windows

Class AA carries conditions that limit design freedom more than householders expect.

  • Materials must be of a similar appearance to the existing exterior.
  • The roof pitch of the principal part of the enlarged house must match the existing pitch.
  • No window may be inserted in any wall or roof slope forming a side elevation.
  • The house must remain a single dwelling in use class C3 afterwards.
  • Engineering operations are limited to works within the curtilage to strengthen existing walls and foundations.

The side window condition is the one that undoes schemes. A new top floor on a semi usually wants light from the flank, and under this right it cannot have it. Roof lights in the rear slope and a rear dormer under the separate Class B right are the usual workaround, and the Class B limits then apply in their own terms. Where the works are internal only, a different set of questions arises, covered in loft conversions with no external change.

Prior approval and what the council can consider

Class AA is not a free pass. Before starting, you apply to the authority for prior approval of a defined list of matters:

  1. The impact of the development on the amenity of adjoining premises, including overlooking, privacy and loss of light.
  2. The external appearance of the house, including the design and architectural features of the principal elevation and any side elevation fronting a highway.
  3. Air traffic and defence asset impacts.
  4. Whether a protected view would be affected.

The application must include plans, a written description of the works, and a report setting out the construction management arrangements, including hours of operation and how disturbance to neighbours and the highway will be controlled. Neighbours are notified and can comment, and their comments on overlooking and loss of light are squarely within scope.

That last point is where most refusals come from. A third storey with rear windows looking into a short urban garden invites a loss of privacy objection, and the authority can refuse prior approval on that ground alone. On constrained sites a short daylight and sunlight assessment using the BRE 209 geometric tests is a sensible piece of evidence to submit with the application rather than to produce in response to an objection.

Expect scaffolding and a highway licence to be part of the construction management answer. The practicalities are covered in scaffolding, hoardings and the highway licence.

Where the right cannot be used at all

Class AA does not apply on article 2(3) land, which means conservation areas, National Parks, National Landscapes, the Broads and World Heritage Sites. It does not apply to a listed building or a building in the curtilage of one, a scheduled monument, a site of special scientific interest, or land in a safety hazard area or military explosives storage area.

An Article 4 direction can remove the right locally, and several authorities have made directions covering upward extension. Check the authority's list of directions for the specific street before designing anything, because a direction removes the right whether or not you knew about it.

Flats are outside Class AA entirely. The right applies to a dwellinghouse, and a building containing flats is not one.

Part 20 Class AB in its own terms

For a terrace building in commercial or mixed use, Part 20 Class AB permits up to two additional storeys of new flats, subject to its own gateway. The existing building has to have been constructed between 1 July 1948 and 5 March 2018. An 18 m overall cap applies, new storeys are limited in floor to ceiling height, and the same designated land exclusions bite.

The prior approval list is much longer than Class AA's. Alongside transport and highways, contamination and flooding, the authority considers external appearance, the provision of adequate natural light in all habitable rooms of the new dwellings, the amenity impact on the existing building and neighbouring premises, and the effect of noise from the commercial uses below on the new residents. The authority has eight weeks to determine it.

Two traps for investors. Adequate natural light in all habitable rooms is a refusal ground that bites on deep plan buildings with one external wall. And noise from the commercial use beneath is assessed as an impact on the new flats, so a unit above a late night use needs an acoustic answer at application stage rather than at building control.

Structural and party wall consequences

None of these rights touch the Party Wall etc. Act 1996. Raising a party wall, cutting into it for a new floor or underpinning it are all notifiable works, and the notice periods run independently of the planning timetable. Serve early, because an unresolved dispute and an award under the Act can take longer than the prior approval.

Structurally, adding a storey loads existing walls and foundations that were designed for two. Class AA allows strengthening works within the curtilage, which is the drafting that lets you do the necessary underpinning, but it does not allow you to extend the footprint to achieve it. Get a structural appraisal before the prior approval application, not after, because a scheme that needs a wider foundation is a scheme that needs full permission.

A planning statement is not required for a prior approval application, though a short covering note that works through each prior approval matter in turn tends to shorten the process.

This is general guidance, not legal advice. Check the current text of the Order and the position with your local planning authority or a qualified professional before relying on it, and remember that a lawful development certificate is the only formal way to confirm that works are lawful.

Enter your postcode on PlanScope to see which reports a roof extension on your street is likely to need.

Frequently asked questions

Is Class AB the right for adding a storey to my house?

No. Class AB sits in Part 20 of Schedule 2 and creates new separate flats on top of a terrace building in commercial or mixed use. Enlarging an existing house upwards is Class AA of Part 1. Using the wrong class is a common reason for a prior approval application being returned.

How much higher than my neighbour can the extension be?

For a house that is not detached, the highest part of the roof once enlarged must not exceed the highest part of the roof of the adjoining building by more than 3.5 metres. Where there is more than one adjoining building, the comparison is with the one that has the highest roof, which can help at the end of a stepped terrace.

Can I put a window in the side wall of the new storey?

Not under Class AA. A condition prohibits a window in any wall or roof slope forming a side elevation. Light usually has to come from the front and rear, or from roof lights in the rear slope, which is why flank-lit layouts on semi-detached houses often fail to work under this right.

Does Class AA apply in a conservation area?

No. The right is excluded on article 2(3) land, which includes conservation areas, National Parks, National Landscapes, the Broads and World Heritage Sites. It also does not apply to listed buildings or land within their curtilage, scheduled monuments or sites of special scientific interest.

What can the council refuse prior approval on?

For Class AA, the amenity of adjoining premises including overlooking, privacy and loss of light, the external appearance of the principal elevation and any side elevation fronting a highway, air traffic and defence asset impacts, and effects on a protected view. Neighbour comments on privacy and daylight are squarely within scope.

Sources and further reading

permitted developmentclass aaclass abupward extensionprior approvalterraced house

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Permitted Development

View all →
Permitted Development9 min read

Permitted development where an earlier permission conditions the site

A rear extension can sit well within Class A and still be unlawful, because a condition on the permission that created the house says otherwise. How Article 3(4) works in practice.

Read article →
Permitted Development8 min read

Agricultural prior approval refused on siting or design

Under Part 6 the council can only refuse the siting, design and external appearance you proposed. The permitted development right survives, so a revised set of details usually beats an appeal.

Read article →
Permitted Development7 min read

Hard standing, plant and storage at an industrial unit

Part 7 of Schedule 2 covers hard surfaces, plant and private ways at industrial premises. Article 3(4) removes those rights where the original permission carries a condition, which is where most disputes begin.

Read article →
Permitted Development8 min read

Shopfronts, signs and the consents a new occupier needs

Planning permission, advertisement consent and listed building consent are three separate regimes with different tests. Sequencing them correctly is what protects a shop fit out programme.

Read article →
Permitted Development6 min read

Water and sewerage undertaker works near your site

Schedule 2 to the GPDO grants undertakers wide rights for water and sewerage works, so planning objections go nowhere. What to do instead, and where an application is still needed.

Read article →
Permitted Development7 min read

Permitted development before the new house is finished

On a self-build plot the permitted development allowance only exists once the house does. What substantial completion means, which conditions remove the rights, and when to vary the permission instead.

Read article →