Who the applicant should be on a leasehold site

7 min readBy PlanScope Editorial Team

Planning permission does not override a lease. A leaseholder applicant signs certificate B and serves notice on the freeholder, then still needs a licence to alter.

A leaseholder can apply for planning permission on land they do not own. Anyone can. What the leaseholder cannot do is skip the ownership notice, because Article 13 of the Town and Country Planning (Development Management Procedure) (England) Order 2015 requires notice to be given to every owner of the application land, and the freeholder is an owner.

So the applicant on a leasehold site is usually the leaseholder, with certificate B signed and notice served on the freeholder. The harder question is whether that is enough to build, and the answer is normally no, because planning permission does not override the lease.

Applying as a leaseholder

Planning permission attaches to the land, not to the applicant. It does not confer any right to carry out the works, and it does not override a covenant, an easement or a lease term. Section 70 of the Town and Country Planning Act 1990 lets an authority grant permission on an application properly made, and nothing in the Act requires the applicant to have an interest in the land.

That is why a leaseholder can and often should be the applicant. The leaseholder is the one who wants the works, who will fund them and who will hold the permission. Putting the freeholder's name on the form when the freeholder is a passive landlord creates its own problems: the permission belongs to them, and any section 73 variation or discharge of conditions needs their involvement.

Where the lease is short, the position reverses. A permission is a planning asset with a three year implementation window, and a tenant with eighteen months left is spending money on something the landlord will inherit.

Serving notice on the freeholder

Article 13 requires notice to be given to any person who, 21 days before the application is made, was an owner of any part of the land to which the application relates, or a tenant of an agricultural holding on it.

"Owner" has a defined meaning for this purpose: the freehold owner, or a person entitled to a tenancy with at least seven years of the term unexpired. That definition cuts both ways on a leasehold site. A tenant with a 25 year lease is an owner, so if the freeholder applies, notice must be served on the tenant. A tenant with a five year lease is not an owner, so a freeholder applying need not serve notice on them, although doing so is usually sensible.

The notice is in the prescribed form, states that the application is being made and where it can be inspected, and is served before or at the time of the application.

Keep the evidence. Record the date each notice was served, the method, and the address used, and keep a copy of the notice itself with the file.

Which certificate applies

The certificates are set out in the Order and appear on the application form. Section 65(5) of the 1990 Act prevents an authority from entertaining an application unless the requisite certificate is provided.

Certificate When it applies
A The applicant is the sole owner of all the application land, and there is no agricultural tenant
B Other owners exist and are known, and notice has been served on all of them
C Some owners are known and served, and reasonable steps have failed to identify the others, who are notified by newspaper advertisement
D No owner has been identified, and notice is given by newspaper advertisement

On a leasehold site a leaseholder applicant signs certificate B in almost every case, because the freeholder is a known owner. Certificates C and D are for sites where title is genuinely untraceable, and they carry an obligation to take reasonable steps first.

Signing a certificate that is knowingly or recklessly false is an offence under section 65(6). It is also a practical risk, because a defective certificate can expose the resulting permission to challenge, and a buyer's solicitor will find it.

Permission against the right to build

Two consents, two different questions. The planning permission answers whether the development is acceptable in planning terms. The lease answers whether this tenant may carry out these works to this building.

Most commercial and long residential leases contain an alterations covenant, usually absolute for structural works and qualified for non-structural ones, with consent not to be unreasonably withheld. Where the covenant is qualified, the landlord must act reasonably, and the usual conditions are that the tenant pays the landlord's costs, uses approved contractors, insures the works and reinstates at the end of the term.

Where the covenant is absolute, the landlord can simply refuse, and a planning permission does not help. That is the position to establish before spending money on drawings.

Licence to alter, and when to apply for it

The sequence matters. Applying for the licence to alter before planning permission wastes the landlord's time and your fees if the scheme changes. Applying after permission risks a landlord who wants design changes the authority has already approved.

A workable order on a typical conversion:

  1. Read the alterations covenant and the user clause, and confirm whether the intended use is permitted by the lease at all.
  2. Tell the landlord informally what you intend, with sketch drawings, and ask whether anything is unacceptable in principle.
  3. Submit the planning application with certificate B and notice served.
  4. Negotiate the licence to alter in parallel with determination, using the submitted drawings.
  5. Complete the licence before the pre-commencement conditions are discharged.

Step one catches more schemes than any other. A user clause restricting the premises to a single use defeats a change of use application, however acceptable the planning case, and the planning history of the site is worth checking at the same time, as set out in our note on planning history searches before you buy a site.

Agreements that bind the freehold

Where a scheme needs a planning obligation, the leaseholder's signature is not sufficient. An obligation under section 106 of the 1990 Act binds the land and is enforceable against successors in title, which means it has to be entered into by everyone with an interest capable of being bound, including the freeholder and any mortgagee.

Authorities will not complete a deed signed only by a leaseholder, because the obligation would fall away at the end of the lease. On a major leasehold scheme this is the item that delays completion, so approach the freeholder about it at the same time as the licence to alter, not after the committee resolution.

The same applies to a highway agreement under section 278 of the Highways Act 1980 where the works affect land in the freeholder's ownership, and to a unilateral undertaking.

Documents to collect before you start

  • The lease, with every deed of variation, and the registered title for both the leasehold and the freehold.
  • A land registry official copy of the register and title plan for the freehold, to confirm the owner's name and address for service.
  • The alterations covenant, user clause and any side letters.
  • Details of any mortgagee with a charge over the freehold or the lease.
  • Service charge and reinstatement provisions, because they affect whether the works are worth doing on the remaining term.

An illustrative example. A landlord investor holds a 99 year lease on a ground floor retail unit with two flats above held on separate leases, and wants to convert the rear storeroom to a studio flat. The applicant is the leaseholder of the retail unit. Certificate B is signed with notice served on the freeholder, and on the upper flat leaseholders if their leases include any part of the application land. The alterations covenant is absolute for structural work, so the licence to alter has to be negotiated before drawings are finalised. A Planning Statement sets out the policy case, and the scheme stands or falls on the amenity of the studio rather than on the ownership position.

Varying a permission later raises the same ownership questions again, and our note on varying a permission for development already begun sets out how that interacts with the original consent.

Establish who owns what before you draw anything. The certificate takes five minutes once you know, and weeks if you do not.

If you want to see which supporting documents your scheme is likely to need, enter your postcode on PlanScope.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Can a leaseholder apply for planning permission?

Yes. Planning permission attaches to the land rather than the applicant, and nothing in the Town and Country Planning Act 1990 requires an applicant to hold an interest in the site. The leaseholder must serve notice on the freeholder under Article 13 of the Development Management Procedure Order 2015 and sign certificate B on the form.

Who counts as an owner for the ownership certificate?

For the purposes of the notice requirements, an owner is the freehold owner or a person entitled to a tenancy with at least seven years of the term unexpired. So a tenant on a 25 year lease is an owner and must be served if the freeholder applies, while a tenant on a five year lease is not.

Does planning permission override my lease?

No. The permission answers whether the development is acceptable in planning terms. The lease answers whether this tenant may carry out these works. Where the alterations covenant is absolute, the landlord can refuse outright, and where it is qualified the landlord must act reasonably but can impose costs, contractor and reinstatement conditions.

When should I negotiate the licence to alter?

Run it in parallel with determination, using the submitted drawings, and complete it before pre-commencement conditions are discharged. Before any of that, read the alterations covenant and the user clause, because a user clause restricting the premises to one use will defeat a change of use scheme whatever the planning merits.

Can a leaseholder sign a section 106 agreement alone?

Not effectively. A planning obligation binds the land and is enforceable against successors, so the freeholder and any mortgagee with a charge need to be parties. Authorities will not complete a deed signed only by a leaseholder, because the obligation would fall away at the end of the lease. Approach the freeholder early.

Sources and further reading

leaseholdownership certificatecertificate blicence to altersection 106planning process

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Planning Process

View all →
Planning Process7 min read

Resubmitting after an invalid application notice

An invalidation notice is an administrative check, not a refusal. Supply the listed items as one package, and know when a local list requirement can be challenged.

Read article →
Planning Process7 min read

Section 106 completion and the decision timetable

Most of the delay between a committee resolution and a decision notice is conveyancing, not planning. The drafting gap, the parties to join and the timetable imposed.

Read article →
Planning Process7 min read

Online planning submission and the validation receipt

Submitting is not the same as being validated. What the council checks, the defects that invalidate householder applications, and the record to keep from the day you submit.

Read article →
Planning Process6 min read

Habitats screening where no European site is nearby

Being ten miles from the nearest designated site does not end the habitats question. Pathways travel further than people expect, and the council has to record its conclusion either way.

Read article →
Planning Process6 min read

Varying the time limit on an unimplemented permission

Section 73 is expressly barred from extending a time limit. That leaves two real options, and the one most developers overlook is making a lawful start before the deadline.

Read article →
Planning Process7 min read

Environment Agency objections and how they are lifted

Most Environment Agency objections are holding objections about missing information. Work out which type you have before you spend money answering the wrong question.

Read article →