Appeal start dates and what each deadline means
Every appeal deadline runs from the start date set by the Planning Inspectorate, not from the day you lodged. Here is what each stage requires and which deadlines are fatal if missed.
Every deadline on a planning appeal runs from the start date, and the start date is not the day you submitted the appeal. It is the date the Planning Inspectorate confirms the appeal is valid and issues the start letter. That letter contains a table of appeal timetable deadlines, and it is the authoritative document for your case, because the periods are set by the procedure rules and the Inspectorate's current procedural guide, both of which change from time to time.
Read the start letter the day it arrives. Diarise every date in it. Then work backwards.
What the start date is and how it is set
You lodge the appeal through the Inspectorate's online service with the required documents: the application, the decision notice, the plans, the grounds of appeal and the supporting statements. The Inspectorate checks validity, which includes whether the appeal is in time and whether the documents are complete.
Deadlines for lodging are set by statute and by the rules, and they differ by appeal type. A householder or minor commercial appeal must be lodged within 12 weeks of the decision date. Most other appeals against refusal must be lodged within six months. An appeal against non-determination runs from the expiry of the determination period. Enforcement notice appeals must be made before the notice takes effect, and that deadline is absolute.
Once the appeal is valid, the start letter fixes the timetable and names the procedure: written representations, a hearing or an inquiry. Where the procedure is in dispute, the Inspectorate decides, and choosing between written representations, a hearing and an inquiry is a judgement worth making before you lodge rather than after.
The authority questionnaire and its timing
The local planning authority completes an appeal questionnaire shortly after the start date. It lists the relevant development plan policies, supplies the officer report and decision notice, identifies statutory consultees and third party representations, and states whether the council wishes to add anything.
Three things to do with it when it arrives:
- Check the policy list. If the council has cited a policy that was not in the refusal reasons, you may need to deal with it.
- Check the third party representations enclosed. Objections you never saw during the application sometimes appear here.
- Check the plans listed. A questionnaire listing a superseded drawing causes confusion later, and it is easier to correct now.
The questionnaire is not the council's case. On written representations the council's full position comes in its statement, and on a householder appeal the council usually relies on the officer report alone.
Statements of case and when they are due
For written representations and hearings, both parties submit statements by the date in the start letter. For inquiries, statements of case come first and proofs of evidence follow at a later date, with a timetable set by the Inspectorate and often refined at a case management conference.
What a statement should do is answer the refusal reasons in order, with the policy citations checked against the adopted plan rather than copied from the application. A statement that repeats the Planning Statement word for word wastes the opportunity. The decision notice has told you what the council objects to, so the statement is the chance to deal with exactly that.
Interested parties also have a period in which to make representations to the Inspectorate. Neighbours who objected to the application are notified and can comment again. Expect new points, and expect to address them at the final comments stage rather than in your statement.
Final comments and what may be said in them
Final comments are for responding to what the other side has said. They are not an opportunity to introduce new evidence, and the Inspectorate can disregard material that goes beyond comment.
So keep them short and specific. Identify the point, quote the passage you are responding to, and answer it. Where the council has raised a factual matter you can correct with a document already in the appeal, say where that document is. Where it has raised something wholly new, say that it is new and explain why it should carry limited weight.
A practical note. Final comments are often the last written word before the site visit, so they are worth drafting properly rather than treating as a formality.
Site visit scheduling
The inspector visits the site, either unaccompanied where everything can be seen from public land, or accompanied where internal access or access to a neighbour's property is needed.
An accompanied visit means the appellant, the council and sometimes an interested party attend. Nobody argues the case at the visit. The inspector looks, asks factual questions and leaves. Arrive with the approved plans, a tape measure and keys, and arrange access to any neighbouring property in advance with the owner's agreement.
Where the appeal turns on something only visible internally, such as daylight to a room or the condition of a historic interior, request an accompanied visit when you lodge the appeal and say why.
Decision timescales by procedure
| Procedure | Written stages | Relative timescale |
|---|---|---|
| Householder and minor commercial | Grounds of appeal and questionnaire only | Shortest, often decided on the officer report and the appeal form |
| Written representations | Statements and final comments | Several months from start date to decision |
| Hearing | Statements, then a round table session | Longer, with the session date set in advance |
| Inquiry | Statements of case, proofs of evidence, then evidence tested by advocates | Longest and most expensive |
The Inspectorate publishes performance statistics, and the figures move with caseload, so take current timescales from its published data rather than from a remembered figure. What does not change is the ordering: expedited procedures are fastest, inquiries are slowest.
Where timing matters commercially, there is a third option, which is to withdraw and resubmit rather than appeal. A fresh application with an engaged officer can produce a decision faster than an appeal, and that comparison should be made before the appeal is lodged.
Consequences of missing a deadline
Different deadlines carry different consequences, and conflating them causes needless anxiety.
Missing the deadline to lodge the appeal is fatal. The Inspectorate has limited discretion, and for enforcement appeals effectively none. There is no equivalent of an extension of time.
Missing a statement or final comments deadline is serious but not usually fatal. The Inspectorate's practice is that late documents may be disregarded, and the inspector will decide the appeal on what was submitted in time. In a case where your statement carries the substantive argument, that is close to losing by default.
Missing a site visit arrangement wastes everyone's time and can mean the inspector decides on an unaccompanied visit instead, with whatever that costs you in evidence.
The council missing its own deadlines is a different matter. Persistent failure by an authority to meet appeal deadlines, or a refusal reason it then fails to defend, can support an application for costs on grounds of unreasonable behaviour. Keep the correspondence, note the dates, and make the application at the right stage rather than afterwards.
One habit that prevents most of this. The day the start letter arrives, put every date in a shared calendar with a two week warning, and note who is responsible for each item. Appeals are lost on administration more often than on planning judgement.
Browse all 66 PlanScope report types and prepare the supporting documents your appeal statement will rely on.
This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
What is the appeal start date?
The date the Planning Inspectorate confirms the appeal is valid and issues its start letter. Every subsequent deadline in the case runs from that date rather than from the day the appeal was submitted. The start letter contains the full timetable, names the procedure and is the authoritative document for the case.
How long do I have to lodge a planning appeal?
Householder and minor commercial appeals must be lodged within 12 weeks of the decision date, and most other appeals against refusal within six months. Non-determination appeals run from the expiry of the determination period. Enforcement notice appeals must be made before the notice takes effect, and that deadline cannot be extended.
Can I introduce new evidence in final comments?
No. Final comments are for responding to what the other party has said, and the Inspectorate can disregard material that goes beyond comment. Keep them short, identify the passage being answered and respond to it. Where the other side has raised something wholly new, say so and explain why it should carry limited weight.
What happens if I miss the statement deadline?
Late documents may be disregarded and the inspector will decide the appeal on what arrived in time. That is rarely fatal in procedural terms but can be decisive in practice, because the statement usually carries the substantive argument. Missing the deadline to lodge the appeal itself is a different matter and cannot normally be remedied.
Should I ask for an accompanied site visit?
Request one where the appeal turns on something that cannot be seen from public land, such as daylight to an internal room or the condition of a historic interior, and say why when you lodge. Nobody argues the case at the visit. Bring the approved plans and a tape measure, and arrange access to any neighbouring property in advance.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.