Refusals and Appeals

Appeals against agricultural prior notification refusals

7 min readBy PlanScope Editorial Team

On a Part 6 agricultural notification the authority may only consider siting, design and external appearance. Refusals that reach beyond that test are the ones most often overturned.

An agricultural prior notification is not a planning application, and that shapes everything about an appeal. Under Schedule 2 Part 6 of the General Permitted Development Order 2015, certain agricultural buildings and works are permitted development provided they meet the stated limits, and the authority's role is confined to approving the siting, design and external appearance. So when an agricultural prior notification refused decision lands, the first thing to establish is whether the authority refused on a matter it was entitled to consider, or whether it has effectively refused the principle of development it had no power to refuse.

That distinction wins appeals. It also explains why these refusals are appealed more successfully than most.

What the notification route covers

Part 6 splits by holding size. Class A applies to agricultural units of five hectares or more and covers works or buildings reasonably necessary for the purposes of agriculture within that unit. Class B applies to units of between 0.4 and five hectares, with tighter limits and no new buildings. Separate provision deals with fish farming.

For Class A the stated limits include a ground area not exceeding 1,000m² for the proposed building, a height limit of 12 metres reducing to three metres within three kilometres of an aerodrome, and restrictions on works within 25 metres of a metalled part of a trunk or classified road. A building to be used for livestock accommodation or slurry storage cannot be within 400 metres of the curtilage of a protected building.

Where the development falls within the class, the developer applies to the authority for a determination as to whether its prior approval will be required for the siting, design and external appearance. The authority then has 28 days to respond. If it does not respond in time, the development may proceed as notified.

Read the class text itself rather than a summary of it, because the limits have been amended and the conditions attached to each class are as important as the limits.

Limits on size, siting and purpose

Three tests sit behind every Part 6 case, and a refusal usually attacks one of them.

Is the land an agricultural unit, meaning land occupied as a unit for the purposes of agriculture, and does it meet the area threshold? Is the building or work reasonably necessary for the purposes of agriculture within that unit? And does the proposal stay within the stated numerical limits?

The second is where the arguments happen. "Reasonably necessary for the purposes of agriculture" is an objective test, judged on the needs of the particular holding, and it is not satisfied by a building that would be convenient or that serves a business other than agriculture. Equestrian use is not agriculture. Neither is a farm shop selling mainly bought-in goods, nor storage let to third parties.

Note also the conditions that follow approval. Where the land ceases to be used for agriculture within ten years of the development being substantially completed, and no planning permission has been granted for another use, the building must be removed and the land restored. And a building erected under Part 6 after 20 March 2013 cannot be converted to residential use under Class Q for ten years, which matters to anyone planning a conversion later.

Matters the authority may determine

Siting, design and external appearance. Nothing else.

That means the authority cannot refuse prior approval because it dislikes the intensification of agricultural activity, because neighbours object to traffic, because it would prefer the building elsewhere on a different holding, or because it doubts the business case in a general way. It can require the building to be moved within the site, to be lower or differently proportioned, or to be clad in a different colour and material.

What it can also do, and frequently does, is conclude that the development is not permitted development at all, because a limit is exceeded or the agricultural purpose test is not met. That is not a refusal of prior approval. It is a determination that the route is unavailable, and the answer to it is different: either a lawful development certificate application to establish the position, or a full planning application.

Check which of the two you have received. A decision notice headed as a refusal of prior approval that gives reasons about the principle of the building is vulnerable on appeal, and the grounds for appealing a refusal in the Green Belt show the same pattern where a council reaches beyond the test it was applying.

Where the agricultural purpose is doubted

This is the substantive battleground, and it is won with documents rather than argument.

Assemble the evidence of the agricultural unit and its needs:

  1. A holding plan showing every parcel, with ownership or tenancy and total area, demonstrating the five hectare threshold for Class A.
  2. The holding number and registration with the relevant rural payments body.
  3. Stock numbers and movement records, or cropping records and yields, for at least the preceding three years.
  4. Accounts showing agricultural trading, separated from any diversified income.
  5. A statement of why the building is reasonably necessary: what is currently stored or housed where, why that is inadequate, and what the building replaces or adds.
  6. Evidence that existing buildings on the holding cannot be used instead, with their dimensions and current uses listed.

The sixth item is the one most applications omit, and officers ask for it almost every time. A holding with three underused general purpose buildings asking for a fourth needs to explain itself.

Appealing a refusal of prior approval

The appeal goes to the Planning Inspectorate under section 78 of the Town and Country Planning Act 1990. For most appeals the deadline is six months from the date of the decision, and the Inspectorate's current procedural guide is the place to confirm the period and the documents required, since the rules are revised from time to time.

The grounds to run, in order of strength:

The authority considered matters outside siting, design and external appearance. Set out the reasons given and identify which fall outside the test. This is a jurisdictional point, and inspectors deal with it directly.

The siting objection is unreasonable on the facts. Show the alternatives considered within the holding, with reasons tied to the farming operation: access for a telehandler, proximity to existing yard infrastructure, drainage, and separation from the protected building. An inspector will follow operational logic.

The design objection is disproportionate. Agricultural buildings are functional, and a portal frame clad in profiled sheeting in a dark colour is the normal answer. Where the authority wants timber boarding or a different roof pitch, ask what that achieves and at what cost.

Where the refusal was really about the principle, consider whether the appeal is the right route at all, or whether withdrawing and applying properly resolves it faster. An appeal that succeeds on a jurisdictional point still leaves you with a building the council dislikes.

Where a full application is required instead

Four situations where Part 6 is unavailable and a planning application is the only route: the building exceeds the stated limits, the use is not agriculture, the land is not an agricultural unit of the required size, or the holding has been divided in a way that breaks the unit.

A full application changes the test entirely. The authority then considers landscape impact, highways, drainage, ecology, neighbour amenity and policy compliance, and the supporting documents expand accordingly. A Planning Statement setting out the agricultural justification is the core document, with landscape and ecology evidence where the site warrants it.

One practical habit for anyone running a holding. Keep the agricultural records as a matter of routine, not as a response to a refusal. The evidence that wins a Part 6 appeal is three years old by the time you need it.

Browse all 66 PlanScope report types and draft the supporting statements for a farm building application.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What can a council consider on an agricultural prior notification?

Only the siting, design and external appearance of the proposed building or works. It cannot refuse prior approval because it dislikes the intensification of farming, because neighbours object to traffic, or because it would prefer the development on another holding. It can require the building to move within the site, to be lower, or to use different materials and colours.

What size holding qualifies under Part 6 Class A?

An agricultural unit of five hectares or more, where the works or building are reasonably necessary for the purposes of agriculture within that unit. Class B applies to units between 0.4 and five hectares with tighter limits and no new buildings. The proposed building under Class A must not exceed 1,000m² ground area, with height limits that reduce near an aerodrome.

What happens if the council does not respond within 28 days?

Where the authority fails to notify its determination within 28 days of receiving the application, the development may proceed as notified, subject to the conditions in the class. Keep proof of the date the application was received and a copy of exactly what was notified, because any divergence from the notified details takes the work outside the permission.

Is a refusal of prior approval the same as a decision that the works are not permitted development?

No, and the difference matters. A refusal of prior approval addresses siting, design and appearance. A determination that the development falls outside the class, because a limit is exceeded or the agricultural purpose test is not met, says the route is unavailable. The answer to the second is a lawful development certificate application or a full planning application.

Can a building put up under Part 6 be converted to a house later?

Not for ten years. A building erected under Part 6 after 20 March 2013 is excluded from residential conversion under Class Q for ten years from the date it was built. A separate condition requires removal and restoration if agricultural use of the land ceases within ten years and no other permission has been granted.

Sources and further reading

agricultural buildingsprior approvalpart 6gpdoplanning appeal

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Refusals and Appeals

View all →
Refusals and Appeals6 min read

Appealing where a consultee objection was later withdrawn

A withdrawn consultee objection leaves the refusal reason without evidence. How to pin the council's position, build the costs record and choose between appeal and resubmission.

Read article →
Refusals and Appeals7 min read

Rebutting an ecology refusal where surveys were missing

An evidence refusal on ecology can usually be answered. The survey windows, the reasonable likelihood threshold and the condition wording to offer the inspector.

Read article →
Refusals and Appeals6 min read

Appeal site visits where internal access is needed

Nobody can make a neighbour let an inspector inside. When internal access really matters, how to request it, and the measured evidence that works when it is refused.

Read article →
Refusals and Appeals6 min read

Dealing with a new refusal reason in the appeal statement

Councils widen their case on appeal more often than they admit. How to object, answer in the alternative and build the costs record when a new refusal reason appears.

Read article →
Refusals and Appeals6 min read

Appealing where the refusal cites a policy not in the plan

A policy outside the development plan is a material consideration, not a requirement. How to frame the appeal, weigh emerging policy and handle a notice with no policy reference.

Read article →
Refusals and Appeals7 min read

The inspector's power to vary conditions on appeal

Section 79 lets an inspector treat the application as if made to them, so conditions can be rewritten, deleted or added. Including the risk in appealing a single condition.

Read article →