Method statement and tree protection plan as two documents

7 min readBy PlanScope Editorial Team

The method statement is the written sequence of works. The tree protection plan is the drawing. Submitting one document instead of two is the usual reason a condition is not discharged.

An arboricultural method statement and tree protection plan are two separate deliverables, and most refusals to discharge a tree condition come from submitting one document that tries to be both. The method statement is written and sequential, describing how each operation near a tree will be carried out. The tree protection plan is a scale drawing showing what is retained, what is removed and where the barriers go.

BS 5837:2012 treats them as distinct for a practical reason. One goes in the site file for the contractor to work to, and the other goes on the hoarding and in the site induction.

Why these are two documents

The documents answer different questions and are used by different people at different moments.

The method statement answers how and when. It is read by the site manager before an operation starts, and it has to be specific enough to follow without an arboriculturist present. The protection plan answers where. It is read at a glance, by everyone from the groundworker to the tree officer standing at the fence line checking that the barrier matches the drawing.

In practice the plan is usually included as a figure within the method statement document, and that is fine. What is not fine is a method statement with a location plan instead of a protection plan, or a protection plan with a paragraph of notes instead of a method statement. Councils reject both.

What belongs in the method statement

The written document should cover the operations in the order they will happen on site, with the arboricultural control for each.

The content councils expect:

  • a tree works specification for any pruning or felling, written to the recommendations in BS 3998, with each tree identified by its survey number
  • the sequence of site operations from first arrival to completion, with the point at which protective barriers are installed and removed
  • the construction exclusion zone for each retained tree and how it relates to the root protection area
  • the specification for protective barriers and ground protection, including the materials and the fixing method
  • the method for any excavation inside a root protection area, including hand digging, air spade use and the supervision required
  • the service route strategy, with the position of trenches and the reasoning where a route crosses a root protection area
  • the method and build-up for any no-dig surfacing
  • the position of the site compound, material storage, cement mixing and wash-out areas, all outside protected zones
  • the arboricultural monitoring schedule, with named hold points
  • the arrangement for changes, because something always changes

That last item is worth adding deliberately. A clause explaining that any departure from the statement requires written agreement from the project arboriculturist, with a record sent to the council, prevents a contractor's improvisation becoming a breach of condition.

What belongs on the protection plan drawing

The plan is a drawing on the finalised layout, not on the survey base, and that distinction matters because officers check whether the fence line works against the building as approved.

Element How it should appear
Retained trees Numbered, with crown spread and category shown
Trees to be removed Clearly distinguished, with the number retained for cross-reference
Root protection areas Plotted to scale, with any modified shape justified in the statement
Construction exclusion zones Hatched, with the barrier line drawn on it
Protective barriers Line type and a reference to the specification detail
Ground protection Extent shaded, with the build-up referenced
No-dig areas Extent shown with a section reference
Site access and compound Shown in the position assumed by the statement
Scale bar and north point Present, with a stated drawing scale

The default protective barrier in BS 5837 is a 2.3 metre high welded mesh panel system on a scaffold framework, with signage identifying the construction exclusion zone. Where something lighter is proposed, the plan has to show it and the statement has to justify it, usually by reference to the duration of the works and the proximity of plant.

And put the fence where the contractor can build it. A barrier line that crosses the only vehicle route into the site will come down in week one.

Specifying no-dig construction and ground protection

This is the technical content most often missing, and a note saying no-dig construction will be used is not a specification.

For a drive, path or parking area crossing a root protection area, the submission needs a section drawing with the existing ground level, the geotextile separation layer, the cellular confinement or geogrid product and its depth, the granular fill specification, the surfacing and its permeability, and the finished level relative to the existing. The build-up should sit above existing grade with no excavation into rooting soil beyond removal of soft landscaping.

For ground protection during construction, distinguish between pedestrian traffic, which scaffold boards on a scaffold frame will handle, and tracked or wheeled plant, which needs a proprietary system or a geotextile and granular layer designed for the load. State which areas take which, and for how long.

For services, follow the industry guidance on utility apparatus near trees and show the trench positions on the plan. Where a route cannot avoid a root protection area, the statement should specify hand excavation, root pruning limits, and supervision, together with the alternative routes considered and why they were rejected.

Supervision, hold points and the monitoring record

A condition requiring arboricultural supervision needs a schedule rather than a promise. Set out the hold points, the person responsible, and what is recorded at each.

The usual hold points are barrier installation sign-off before any other operation, attendance at any excavation inside a root protection area, attendance during no-dig construction, inspection following any accidental damage, and a completion inspection when barriers are removed. Each produces a short written record, and some conditions require those records to be sent to the council within a stated period.

Budget the visits as a construction cost rather than a design fee, and ask for them to be quoted per visit. On a six month build, four to six attendances is a normal pattern, and a scheme with services crossing a root protection area will need more.

The conditions that require both

Tree conditions usually come in a pair. One requires the method statement and tree protection plan to be submitted to and approved by the authority before development starts, often with the word development defined to include demolition and site clearance. The second requires the development to be carried out in accordance with the approved documents, with the barriers retained for the duration.

Read the trigger wording carefully. Where the condition catches site clearance, mobilising the contractor before discharge is a breach, and tree officers do visit. A Construction Management Plan is often conditioned alongside, and the two documents must agree about the compound, the access route and the storage areas, because an officer comparing them will notice if they do not.

Discharging the condition first time

The reasons councils refuse to discharge are predictable, which makes them easy to avoid.

  1. The plan is drawn on the survey base rather than the approved layout, so the fence line does not relate to the building.
  2. Root protection areas are shown as circles where the statement describes a modified shape, or the other way round.
  3. No-dig construction is named with no section detail and no product specification.
  4. The compound, storage and wash-out areas are not shown anywhere.
  5. There is no tree works specification, so the pruning is undefined.
  6. The monitoring schedule is missing, or lists visits without hold points.
  7. The documents contradict the approved drawings on levels or on the position of the access.

Submit both documents together with a short covering note that maps each requirement in the condition to the page or drawing that answers it. Officers discharge conditions faster when they can tick the wording off rather than hunt for it.

The survey work behind all of this is set out on the tree survey page, and councils expect a suitably qualified arboriculturist as the author with professional review strongly advised. You can see the related documents on the report index.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Can the method statement and protection plan be one document?

The plan is normally included as a figure inside the method statement document, which is acceptable. What is not acceptable is replacing one with the other: a method statement with only a location plan, or a protection plan with a few notes instead of a written sequence of works. Councils refuse to discharge conditions on that basis.

What height should protective fencing be?

The default specification in BS 5837:2012 is a 2.3 metre high welded mesh panel system on a scaffold framework, with signage identifying the construction exclusion zone. A lighter barrier can be proposed where the works are short and plant is kept away, and the protection plan has to show it with the method statement justifying the choice.

Is a note saying no-dig construction enough?

No. The submission needs a section drawing showing existing ground level, geotextile separation, the cellular confinement or geogrid product and its depth, the granular fill, the surfacing and the finished level. The build-up should sit above existing grade so that no rooting soil is excavated, and the drawing should be cross-referenced from the plan.

When does the condition have to be discharged?

Before development begins, and many conditions define development to include demolition and site clearance. Starting work before approval is a breach of condition, and tree officers do inspect. Allow time for the authority's determination period on the discharge application when programming mobilisation.

How many supervision visits should I expect?

Four to six attendances is a common pattern on a six month build, more where services cross a root protection area. The method statement should list hold points rather than a frequency: barrier sign-off, any excavation within a root protection area, no-dig construction, damage inspections and a completion check when barriers come down.

Sources and further reading

arboricultural method statementtree protection planbs 5837conditionsno-dig

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Report Deep Dives

View all →
Report Deep Dives7 min read

Climate-based daylight modelling in a planning submission

BS EN 17037 target illuminance and vertical sky component answer different questions. An assessment that explains which is doing what fares better than one with more numbers.

Read article →
Report Deep Dives7 min read

Section by section evidence in a Gateway One fire statement

The Gateway One form is the document, not a narrative report. Answer each section in its own order, cross-reference a drawing against every answer, and evidence access and water supply properly.

Read article →
Report Deep Dives7 min read

Defect schedules and registers in a structural survey

The defect schedule is the part of a structural survey an officer reads. Element order, a published damage classification, a numbered photographic register and honest limitations decide whether it holds up.

Read article →
Report Deep Dives7 min read

Capacity tables in a retail impact assessment

The capacity and diversion tables decide whether a retail impact assessment is taken seriously. Here is what each input needs, where the figures come from, and the assumptions officers challenge.

Read article →
Report Deep Dives7 min read

Tabulating comfort criteria in a wind microclimate study

A wind study answers two questions: is each location comfortable for its intended activity, and is it ever dangerous. Here is how to tabulate both.

Read article →
Report Deep Dives7 min read

Credit trackers and evidence owners in a pre-assessment

The pre-assessment report is the summary. The credit tracker is where the rating is won or lost, and most trackers fail because nobody is named against the evidence.

Read article →