Planning Law Updates

Class E: what the 2020 Use Classes revision merged

6 min readBy PlanScope Editorial Team

The 2020 amendment folded the old A1, A2, A3, B1, D1 and D2 classes into Class E, created F1 and F2, and pushed pubs, takeaways, cinemas and music venues into sui generis.

Class E swallowed most of the high street on 1 September 2020. The Town and Country Planning (Use Classes) (Amendment) (England) Regulations 2020 revoked the old shop, financial and professional services, restaurant and cafe, business, non-residential institution and assembly and leisure classes, and folded the bulk of them into a single commercial, business and service class. Inside Class E you can move between uses without planning permission at all. Outside it, a shorter list of uses was pushed into sui generis, where every change needs an application.

Knowing which side of that line your premises sits on is the first thing to establish before signing anything.

The classes that were swept into Class E

Class E is drafted as a list of lettered sub-paragraphs rather than a single description, and the letters matter when you read an old condition or a lease.

  1. Retail sale of goods other than hot food.
  2. Sale of food and drink principally to visiting members of the public where consumption is mostly on the premises.
  3. Financial services, professional services other than health or medical services, and other services appropriate to a commercial, business or service locality.
  4. Indoor sport, recreation or fitness provided principally to visiting members of the public, excluding uses involving motorised vehicles or firearms.
  5. Medical or health services provided principally to visiting members of the public, except premises attached to the residence of the practitioner.
  6. A creche, day nursery or day centre, excluding residential use.
  7. Uses that can be carried out in a residential area without detriment to its amenity: offices, research and development, and light industrial processes.

The general industrial and storage and distribution classes survived the reform untouched, and the residential classes were not affected. What disappeared was the separation between a shop, a bank, a restaurant, an office and a gym.

Movements now possible without permission

Changing from one use to another within the same class is not development at all, so no permission is needed and no prior approval applies. A unit in Class E can become any other Class E use, with no notification to the council.

That has a consequence most occupiers miss: because movement within a class is not development, an Article 4 direction cannot stop it. Article 4 directions withdraw rights granted by the General Permitted Development Order, and no such right is being used here. Where authorities have made Article 4 directions in town centres since 2021, they bite on the separate right to convert Class E premises to dwellings, not on movement inside Class E.

Two real limits remain. The sub-paragraph describing offices, research and light industry is qualified by the words about being carried out in a residential area without detriment to amenity, which means a process generating noise, fumes or heavy vehicle movements may not qualify. And a change within the class can still involve building operations, such as a new extract flue or a shopfront alteration, which need permission in their own right.

Uses that were taken out and made sui generis

The 2020 reform also moved a group of uses out of the classes entirely:

Use Position after 1 September 2020
Public house or drinking establishment Sui generis
Drinking establishment with expanded food provision Sui generis
Hot food takeaway Sui generis
Cinema Sui generis
Concert hall Sui generis
Bingo hall Sui generis
Dance hall Sui generis
Live music venue Sui generis

Every change into one of these needs a full application. A cafe in Class E that starts selling mostly hot food for consumption off the premises has moved into sui generis without realising it, and that is an enforcement risk rather than a technicality. Extraction is usually the point at which the council notices, and a Ventilation and Extraction Statement is what the application then needs.

Betting offices and pay day loan shops were already outside the classes, having been made sui generis in 2015, so they were not part of this change.

F1 and F2 and what they protect

Two new classes were created alongside Class E to shelter uses the reform did not want exposed to commercial flexibility.

Class F1 covers learning and non-residential institutions: education, the display of works of art, museums, public libraries and reading rooms, public halls and exhibition halls, public worship and religious instruction, and law courts.

Class F2 covers local community uses: a shop of no more than 280 square metres selling mostly essential goods including food where there is no other such facility within 1,000 metres, halls or meeting places for the principal use of the local community, outdoor sport or recreation areas not involving motorised vehicles or firearms, and indoor or outdoor swimming pools and skating rinks.

Movement out of F1 or F2 into Class E is not freely available. Some limited rights exist in Part 3 of Schedule 2 to the General Permitted Development Order, and the current text should be checked rather than assumed, because this part of the Order has been amended repeatedly.

Article 4 directions over conversions to housing

The right to convert Class E premises to dwellings arrived on 1 August 2021 and carries its own conditions, including a vacancy period, a minimum period in Class E use before the change, a floorspace cap and a prior approval stage. Many authorities responded with Article 4 directions over town centres and designated employment areas.

Check for a direction before relying on that route, and check its boundary rather than its name, since directions are often drawn to cover a defined centre rather than a whole district. The planning law timeline is a place to follow changes in this area.

Conditions restricting use in older permissions

A planning condition restricting premises to a use within a now-revoked class continues to bite. A 2003 permission conditioned to "use as A1 retail only and for no other purpose" prevents the occupier moving to a gym or a nursery, because the condition, not the class, is the constraint.

Those conditions are interpreted by reference to the classes as they stood when the permission was granted. To escape one you apply under section 73 of the Town and Country Planning Act 1990 to vary or remove it, which reopens the merits of that condition alone. Authorities resist where the condition was imposed for a reason that still holds, such as protecting a retail frontage or controlling parking demand.

Read the full planning history of the unit, not just the most recent consent. A restrictive condition imposed 20 years ago on an extension can control the use of the whole building.

Evidence of lawful use when you move

Because movement within Class E generates no paperwork, nobody records it, and three years later an enforcement officer asks what the lawful use is.

Keep a file: a dated photograph of the unit in use, the lease and its permitted user clause, business rates correspondence, the first and last trading dates, and any fit-out invoices. Where the position is contested or valuable, apply for a certificate of lawfulness under section 191 or section 192 of the 1990 Act. The cost is modest against the cost of an argument, and the Planning Statement accompanying any later application is far easier to write with that certificate in hand.

Outdoor seating raises its own questions, which the note on pavement licences and the planning boundary sets out.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Which classes were merged into Class E?

The old shop, financial and professional services, restaurant and cafe and business classes, along with much of the former non-residential institution and assembly and leisure classes. Class E now covers retail, food and drink consumed on the premises, financial and professional services, indoor fitness, medical services, creches and day nurseries, offices, research and light industry.

Can an Article 4 direction stop movement within Class E?

No. Movement between uses inside a single class is not development at all, so no permitted development right is being exercised and there is nothing for an Article 4 direction to withdraw. Directions made since 2021 bite on the separate right to convert Class E premises to dwellings, which is a different thing.

Is a hot food takeaway in Class E?

No. Hot food takeaways were moved to sui generis on 1 September 2020, alongside pubs and drinking establishments, cinemas, concert halls, bingo halls, dance halls and live music venues. A cafe that starts selling mostly hot food for consumption off the premises has made a change of use needing a full application.

Do old conditions limiting use to A1 still apply?

Yes. A condition restricting premises to a use within a revoked class continues to bite and is read by reference to the classes as they stood when the permission was granted. To escape it you apply under section 73 of the Town and Country Planning Act 1990 to vary or remove that condition.

What are classes F1 and F2 for?

They shelter uses the reform did not want exposed to commercial flexibility. F1 covers education, museums, libraries, public and exhibition halls, places of worship and law courts. F2 covers small essential shops where there is no alternative within 1,000 metres, community meeting places, outdoor sport areas, swimming pools and skating rinks.

Sources and further reading

class euse classeschange of usesui generisarticle 4

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Planning Law Updates

View all →
Planning Law Updates7 min read

CIL indexation, exemptions and the liability notice

The self build exemption is generous and unforgiving. Claim it, get it granted, and serve the commencement notice before a spade goes in the ground, or you pay the full charge.

Read article →
Planning Law Updates7 min read

The nationally described space standard and its status

Minimum dwelling sizes are not building regulations. The standard only applies through a local plan policy that has been tested for need and viability, or where the Order imposes it.

Read article →
Planning Law Updates6 min read

The ten year enforcement immunity period in England

The Levelling-up and Regeneration Act 2023 replaced the four year immunity for operational development and single dwelling conversions with ten years, from 25 April 2024. Earlier breaches keep the old period.

Read article →
Planning Law Updates6 min read

Gateway Two and Three and how they affect programme

For a higher-risk building, construction cannot start before Gateway Two approval and occupation cannot start before the Gateway Three certificate. Both belong in the programme from day one.

Read article →
Planning Law Updates6 min read

Short-term lets: the C5 use class and registration

The announced C5 use class and the register for short-term lets are not in force in England. What controls a let today is the material change of use test, and in London a night limit.

Read article →
Planning Law Updates6 min read

The Housing Delivery Test and what follows a low result

The Housing Delivery Test measures what an authority built against what it needed, and three thresholds decide what follows. This is how each consequence works in practice.

Read article →