Planning Law Updates

Short-term lets: the C5 use class and registration

6 min readBy PlanScope Editorial Team

The announced C5 use class and the register for short-term lets are not in force in England. What controls a let today is the material change of use test, and in London a night limit.

The short term let use class c5 does not exist yet. A new C5 class for short-term lets in England was announced, along with permitted development rights to move between C3 and C5 and a registration scheme for let properties, and at the time of writing none of it has been brought into force. No amendment to the Use Classes Order, no new rights, no live register.

That matters because the announcement has been quoted at landlords as though it were law for over a year. What actually governs a short-term let in England today is the material change of use test, plus a night limit in Greater London and whatever conditions and covenants attach to the particular property.

What was proposed, and why

The stated purpose was to give authorities a lever in places where whole-property letting had taken homes out of residential use, while leaving ordinary occasional letting alone. Two instruments were announced together: a use class to make the distinction visible in planning terms, and a register to tell authorities where the lets are.

The pairing is the point. A use class without a register leaves authorities guessing at where to enforce, and a register without a class gives them information and no control. Follow the position on what is in force on the planning law timeline rather than relying on a note from a previous application, and check the legislation itself before advising anyone.

How a C5 class would work

As announced, C5 would cover the use of a dwelling as a short-term let where it is not the operator's sole or main home. A dwelling occupied as a main home and let occasionally would stay in C3.

Permitted development rights were to allow movement in both directions, so a C3 dwelling could become a C5 let and back again without an application, and authorities could remove those rights by Article 4 direction where the local position justified it. Expect any such direction to follow the pattern already familiar from houses in multiple occupation: tourist areas, coastal towns and city centre wards first, with the authority's evidence base published alongside.

Hotels would remain in C1 and the sui generis cases would remain where they are. None of this applies until an order is made.

The registration scheme and what it records

Powers for a register of short-term rental properties in England sit in the Levelling-up and Regeneration Act 2023, to be implemented by regulations. As announced, registration would capture the property, the operator and the nights let, with the data available to authorities.

A register is an enforcement tool before it is anything else. Where it exists, the night count stops being a matter of inference from listing data and becomes a recorded figure. Landlords operating at the margin of a night limit should plan on that basis rather than on the current difficulty of proving occupancy.

The controls councils already use

Five of them, all live now.

Control What it does
Material change of use Needs permission where letting changes the character of the use as a matter of fact and degree
The London night limit More than 90 nights a year as temporary sleeping accommodation requires permission in Greater London
Conditions on existing permissions Occupancy or holiday use conditions on conversions and new build
Enforcement powers Notices where an unauthorised change of use has occurred
Licensing and environmental protection Houses in multiple occupation licensing, noise and waste powers

The London limit comes from the Greater London Council (General Powers) Act 1973 as amended by the Deregulation Act 2015, and it is specific to Greater London. Outside London the question returns to fact and degree, which means intensity, frequency, the pattern of arrivals and departures, the presence or absence of a resident, and the effect on neighbours.

Fact and degree is doing a lot of work in that first row, and it is worth being concrete about what tips it. A whole dwelling marketed year-round, with keys handled by a managing agent, weekly or more frequent turnovers, luggage and taxis at antisocial hours, and no resident on site, is a pattern that authorities have treated as a material change. A spare room let for a fortnight in summer is not. And the middle ground is uncertain, which is why the certificate route matters.

Leasehold covenants are the control landlords most often overlook. A flat let in breach of a covenant against business use or short-term letting is a problem between leaseholder and freeholder, and it does not depend on planning at all.

What is in force, and the honest uncertainty

At the time of writing the position in England is that the use class and the register are announced policy awaiting implementing legislation. None of it describes a live regime, and the timetable has moved before.

There is a second uncertainty worth naming. Where a property has been let short-term for a long period without complaint, the lawful use may already have changed, and a lawful development certificate application supported by occupancy evidence can settle it. That route exists now and does not depend on the reform.

Wales, Scotland and Northern Ireland are separate. Wales has its own use class changes and licensing proposals under Planning Policy Wales, Scotland operates a short-term let licensing scheme and control area powers under its own legislation, and Northern Ireland works to the Strategic Planning Policy Statement with tourism accommodation certification. Do not read the England position across to any of them.

One more practical point. Council tax and business rates treatment follows the property's availability for letting and is assessed separately from planning, so a property moved onto the rating list as self-catering accommodation has created a record that an authority can read. Landlords sometimes discover that the rating position has evidenced the planning position for them.

What landlords can do now

  1. Establish the lawful use of each property, from the planning history and the occupancy record, rather than from what the previous owner said.
  2. Check the lease and the title for covenants and restrictions.
  3. In Greater London, keep an auditable night count by property for each calendar year.
  4. Where the use looks like a material change, consider an application now rather than after a complaint, and support it with a planning statement that addresses amenity, waste, parking and management.
  5. Where the use is long-established, consider a certificate of lawfulness with dated evidence.
  6. Watch for an Article 4 direction consultation in your area, and respond to it.

Doing nothing is a position, and the risk it carries is enforcement and the penalties that follow, with the enforcement time limits under the Levelling-up and Regeneration Act 2023 in the background. Verify what is in force before you act on any of this.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

If you are preparing an application for a let that has outgrown C3, start with the postcode and work out the document bundle before drafting anything.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do I need planning permission to let my house on a short-term basis?

It depends on whether the use amounts to a material change of use, which is a question of fact and degree under section 55 of the Town and Country Planning Act 1990. Occasional letting of a home you live in rarely crosses the line. Year-round commercial letting of a whole property, with the comings and goings that brings, often does. A lawful development certificate is the only formal way to confirm it.

What is the London 90-night rule?

In Greater London, letting residential premises as temporary sleeping accommodation for more than 90 nights in a calendar year is a material change of use requiring permission, under the Greater London Council (General Powers) Act 1973 as amended by the Deregulation Act 2015. Boroughs enforce it, and evidence from listing platforms is used. The rule applies to Greater London only.

Has the C5 use class come into force?

No. At the time of writing a C5 class for short-term lets in England had been announced but not brought into force, and nothing had been brought into force. Until a statutory instrument amends the Use Classes Order, short-term letting is assessed against the existing classes and the material change of use test. Verify the current position before advising a client.

Would permitted development rights allow switching between C3 and C5?

That was the stated intention: rights allowing movement in both directions, with authorities able to remove them by Article 4 direction in areas under pressure. None of that exists until the order is made. Treat announcements as announcements, and expect Article 4 directions in tourist and city centre areas if the rights do arrive.

What else can a council use against a short-term let now?

Enforcement for an unauthorised change of use, conditions on existing permissions restricting occupancy, leasehold covenants pursued by freeholders, licensing where the property is also a house in multiple occupation, and council tax and business rates treatment. Noise and waste complaints are handled under environmental protection powers rather than planning.

Sources and further reading

short-term letsuse classesc5registration schemelandlordsenforcement

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Planning Law Updates

View all →
Planning Law Updates7 min read

CIL indexation, exemptions and the liability notice

The self build exemption is generous and unforgiving. Claim it, get it granted, and serve the commencement notice before a spade goes in the ground, or you pay the full charge.

Read article →
Planning Law Updates7 min read

The nationally described space standard and its status

Minimum dwelling sizes are not building regulations. The standard only applies through a local plan policy that has been tested for need and viability, or where the Order imposes it.

Read article →
Planning Law Updates6 min read

Class E: what the 2020 Use Classes revision merged

The 2020 amendment folded the old A1, A2, A3, B1, D1 and D2 classes into Class E, created F1 and F2, and pushed pubs, takeaways, cinemas and music venues into sui generis.

Read article →
Planning Law Updates6 min read

The ten year enforcement immunity period in England

The Levelling-up and Regeneration Act 2023 replaced the four year immunity for operational development and single dwelling conversions with ten years, from 25 April 2024. Earlier breaches keep the old period.

Read article →
Planning Law Updates6 min read

Gateway Two and Three and how they affect programme

For a higher-risk building, construction cannot start before Gateway Two approval and occupation cannot start before the Gateway Three certificate. Both belong in the programme from day one.

Read article →
Planning Law Updates6 min read

The Housing Delivery Test and what follows a low result

The Housing Delivery Test measures what an authority built against what it needed, and three thresholds decide what follows. This is how each consequence works in practice.

Read article →