Local plan reform and the new plan-making route
The Levelling-up and Regeneration Act 2023 replaces the local plan provisions of the 2004 Act, repeals the duty to cooperate and gives national policies statutory precedence. Here is what is in the Act and what depends on regulations.
The Levelling-up and Regeneration Act 2023 rewrites plan-making rather than tinkering with it. It replaces the local plan provisions in the Planning and Compulsory Purchase Act 2004, repeals the duty to cooperate, creates national development management policies that take precedence over the development plan where the two conflict, and introduces supplementary plans that form part of the development plan in their own right.
Most of it depends on secondary legislation. The Act sets the architecture, and regulations set the procedure, the timetable and the transitional arrangements. As at 27 October 2026, anyone advising on a plan should check the current position on legislation.gov.uk and the plan-making guidance on gov.uk rather than working from a summary, because the dates have moved more than once.
The plan-making changes in the 2023 Act
Part 3 of the Act inserts a new set of plan-making provisions into the 2004 Act. The headline duty is that each local planning authority must prepare a local plan, and that the plan sets out policies for the development and use of land in its area.
Two structural changes follow. The plan is not to repeat national policy, because national development management policies will cover the matters that currently fill half of every development management chapter. And the local development scheme is replaced by a plan timetable, with the expectation that authorities publish and keep to it.
The duty to cooperate under section 33A of the 2004 Act is repealed. In its place the Act provides for an alignment policy, to be set out nationally, dealing with how authorities are expected to work together on cross-boundary matters. For anyone who has argued an unmet housing need case at examination, that is the change with the longest consequences, because the duty to cooperate has been the hook for those arguments since 2011.
National development management policies and the precedence rule
This is the provision that changes daily practice most.
The Act inserts a power for the Secretary of State to designate national development management policies, and it amends the determination duty so that where a national development management policy conflicts with the development plan, the national policy prevails. That is a different legal position from the current one, where national policy is a material consideration weighed against a plan-led presumption under section 38(6) of the 2004 Act.
In practice it means two things for a planning consultant. Conflict arguments change shape: instead of weighing national policy against the plan, you identify whether a national policy applies and whether the plan says something inconsistent. And the drafting of the national policies themselves becomes the single most important thing to read, because a short national policy will displace a long local one.
The policies have to be designated, and designation involves consultation. Until that happens, the existing framework continues to operate as policy rather than as a provision with statutory precedence.
Gateway assessments and the proposed timetable
The procedural reform consulted on alongside the Act proposed a shorter plan-making process with fixed checkpoints, rather than the open-ended cycle authorities currently run.
The shape proposed was a programme of around 30 months from the start of plan preparation to adoption, with gateway assessments at defined points: an early check on scope and evidence, a check before the plan is published for consultation, and a check before submission for examination. The gateways are intended to catch soundness problems while they are still fixable rather than at examination, when the only options are main modifications or withdrawal.
Whether the gateways arrive in that form, and what they cost authorities to run, depends on the regulations. Treat the 30-month figure as an ambition stated in consultation rather than a statutory period, and say so when advising a client on programme.
Plans already in examination
Transitional arrangements are the practical question for most consultants, and they are set by regulations rather than by the Act.
The pattern the government has indicated is that plans already submitted for examination continue to be examined under the existing provisions, with a cut-off date after which new plans must follow the new route. That creates a predictable rush towards the cut-off and a cohort of plans examined under the old tests while neighbouring authorities prepare under the new ones.
For a site promoter, the consequence is tactical rather than legal. A plan being examined under the old provisions is still subject to the duty to cooperate and the current soundness tests, so an unmet need argument remains available in that examination and may not be available in the next one. Check which regime the specific plan sits under before building a case on it.
Supplementary plans in place of some documents
Supplementary planning documents currently sit outside the development plan. They carry weight as material considerations, but they cannot be inconsistent with the plan and they are not subject to independent examination.
The Act creates supplementary plans, which are different in two respects. They form part of the development plan, so section 38(6) applies to them. And they are subject to independent examination, which gives them a procedural cost the old documents did not have.
| Supplementary planning document | Supplementary plan | |
|---|---|---|
| Status | Material consideration | Part of the development plan |
| Independent examination | No | Yes |
| Typical use | Design guidance, parking standards, obligations | Site-specific or small-area policy, design codes |
| Challenge route | Judicial review of adoption | Examination, then judicial review |
The intended use is narrower than people assume: supplementary plans are aimed at site-specific policy and small areas, including design codes, rather than at the general guidance that currently fills supplementary documents. Expect authorities to keep producing guidance outside the development plan as well.
Soundness and what may change
The current soundness tests ask whether a plan is positively prepared, justified, effective and consistent with national policy. The reform proposals floated changes to that set, including a narrower version of the justified test, on the basis that the examination of alternatives has become disproportionately heavy.
If that change lands, examination strategy changes with it. Arguments that currently turn on whether an authority properly considered a reasonable alternative would have less purchase, and more weight would fall on effectiveness and deliverability. For promoters of omission sites, that is a meaningful shift and not a favourable one.
None of it is settled until the regulations and the revised national policy wording are published. The Planning Inspectorate's own guidance will follow them rather than lead them.
Making representations under the new route
The mechanics of participation are set out in regulations, and the Act contemplates digital standards for plan data and for consultation. The practical advice for a consultant changes less than the legislation does.
- Engage at the earliest gateway, because a problem identified before publication is far more likely to be fixed than one raised at examination.
- Respond to the evidence base rather than only to the policy wording, since the evidence is what the gateway checks look at.
- Keep representations keyed to the soundness tests that apply to that plan under its own regime, and say which regime you are addressing.
- Track the national development management policies separately, because a local policy you are arguing about may be displaced by one of them before the plan is adopted.
- Record consultation responses and the authority's answers, since the audit trail matters in any later challenge.
The policy case in an application made under a plan in transition needs to be explicit about which plan and which regime it relies on, and that belongs in the planning statement rather than being left implicit. Other transparency duties introduced by the same Act are covered in build out and the transparency duties on developers, and the wider reform timetable is tracked on the planning law updates timeline.
This is general guidance, not legal advice, and the position depends on regulations that continue to change. Check the current coming-into-force dates and transitional provisions before relying on anything here. The document types involved in a plan representation or an application are set out across the 66 report types.
Frequently asked questions
What are national development management policies?
Policies designated nationally by the Secretary of State under a power inserted by the Levelling-up and Regeneration Act 2023. The Act amends the determination duty so that where such a policy conflicts with the development plan, the national policy prevails. That is a stronger legal position than national policy currently holds as a material consideration.
Has the duty to cooperate been abolished?
The Act repeals section 33A of the Planning and Compulsory Purchase Act 2004, subject to the coming-into-force provisions. In its place the Act provides for a national alignment policy on cross-boundary working. For anyone running unmet housing need arguments at examination, the repeal removes the hook those arguments have relied on since 2011.
What are gateway assessments?
Checkpoints proposed in the plan-making reform consultation, intended to test scope, evidence and soundness at defined points during plan preparation rather than only at examination. The number, timing and content depend on regulations, so treat both the gateways and the proposed 30-month programme as proposals rather than statutory requirements.
How do supplementary plans differ from supplementary planning documents?
A supplementary planning document is a material consideration outside the development plan and is not independently examined. A supplementary plan forms part of the development plan, so the plan-led duty applies to it, and it is subject to independent examination. Its intended use is site-specific and small-area policy, including design codes.
Which regime does a plan currently at examination follow?
Transitional arrangements are set by regulations, and the pattern indicated is that plans already submitted for examination continue under the existing provisions, with a cut-off after which new plans use the new route. Check which regime the specific plan sits under before building a representation or an application case on it.
Sources and further reading