Rear hardstanding and why it differs from the front
Class F permits hard surfaces within a house's curtilage, but the porous surfacing condition only catches the front. Here is what still applies at the rear.
Rear hardstanding permitted development is more generous than the front garden equivalent for one reason: the porous surfacing condition in Class F of Part 1, Schedule 2 to the Town and Country Planning (General Permitted Development) (England) Order 2015 only applies to land between the principal elevation of the house and a highway. Lay a patio or a parking area behind the house and that condition does not bite.
Which is why a sealed concrete yard at the back is usually fine and a sealed concrete driveway at the front may not be.
How Class F treats the front garden differently
Class F permits a hard surface within the curtilage of a house for any purpose incidental to its enjoyment, and the replacement of an existing one. The condition attached to it says that where the surface sits on land between a wall forming the principal elevation and a highway, it is permitted only if the surface is made of porous materials, or if provision is made to direct run-off to a permeable or porous area within the curtilage.
So you have two compliant routes at the front: porous paving, or conventional paving that drains to a lawn, border or soakaway on your own land. Draining to the street is the thing the condition exists to prevent, and it was introduced after years of front gardens being sealed and pushing water onto the highway.
Guidance on the Planning Portal treats small areas, of around five square metres or less, as outside the requirement. That is a guidance threshold rather than a figure in the Order itself, so confirm the position with your council before relying on it for anything marginal.
There is a definitional wrinkle worth knowing. The test is land between the principal elevation and a highway, so a side garden that fronts a road can be caught, while a front garden on a corner plot may have parts that are not between the principal elevation and any highway at all. Look at the geometry rather than assuming front means front.
Patios, paths and parking behind the house
Behind the house, Class F still applies but without the porosity condition, so the surface material is your choice. A concrete parking area, a block paved patio, a resin path or a gravel standing all fall within the right, provided the use is incidental to the enjoyment of the house.
That phrase does some work. A rear hard surface used to park the household's cars, store bins, hold a shed or sit out on is incidental. A rear hard surface let out to a neighbouring business for van parking is not, and it needs planning permission as a material change of use.
Two further checks before you assume the right exists:
- Flats have no Part 1 rights at all, so a hard surface in a communal or demised garden needs permission.
- Permitted development rights are frequently removed by condition on the original permission for newer estates, and by Article 4 directions in some conservation areas. Read the planning history for the house before you order the materials.
The raised platform trap
This catches a lot of people. Part 1 treats a raised platform as something distinct from a hard surface, and the definition turns on a height of more than 300 millimetres.
A patio laid level with the ground is a hard surface. A deck or terrace standing more than 300 millimetres above the adjoining ground is a raised platform, and raised platforms are excluded from the outbuilding right in Class E and restricted under Class A. On a sloping garden, a terrace cut into the slope with a retaining wall on the downhill side can easily cross that threshold at one end even if it is flush at the other.
Measure the finished level against the existing ground at the lowest point, not the highest. If the answer is over 300 millimetres, you are probably looking at an application, and a Planning Statement explaining the levels and the overlooking position is what the officer will want.
The same thinking applies to any garden structure that changes ground levels, including the plinths and frames discussed for ground mounted solar arrays in a domestic garden.
Getting a car to a rear parking area
The surface itself may be permitted while the way of reaching it is not.
Forming a new vehicular access onto a highway is dealt with by Part 2 of Schedule 2, which permits the construction of an access to a highway that is not a trunk road or a classified road, where the access is needed in connection with other permitted development. Onto a classified road, which includes most A and B roads and some C roads, you need planning permission.
Separately, and regardless of the planning position, the vehicle crossover itself needs the highway authority's consent, because altering a footway or verge to cross it requires the authority's approval under the Highways Act 1980 and the work is usually carried out by or on behalf of the authority at your cost. The two approvals are not interchangeable, and the highway team will often ask for the planning position to be settled first.
Access over a rear service lane or an unadopted track raises a third question, which is private rights rather than planning. A right of way for pedestrian access does not necessarily include vehicles, and the deeds decide that, not the council. Where the work involves standing plant or a skip on the public highway, you will also need the licence covered in scaffolding, hoardings and the highway licence.
Where the water goes
Even without the porosity condition, a large sealed rear surface has a drainage consequence, and the person it usually affects first is you.
Water running off a new rear patio towards the house is the single most common complaint after the work is done. Fall the surface away from the building, keep the finished level below the damp proof course, and put a channel drain across any threshold where the fall cannot be achieved.
Where the water goes next matters too. Connecting a new surface water drain into the foul sewer is not acceptable and the water company can require it to be disconnected. A soakaway sized for the area, sited away from foundations and from the neighbour's boundary, is the straightforward answer on most permeable ground. On clay, infiltration may not work at all, and a permeable surface with a sub-base reservoir is often the better design.
| Surface position | Porosity condition applies | Other things to check |
|---|---|---|
| Between principal elevation and a highway | Yes, unless run-off is directed to a permeable area in the curtilage | Guidance threshold for small areas, corner plot geometry |
| Side garden fronting a highway | Often yes, depending on the geometry | Whether the elevation concerned is the principal elevation |
| Rear garden | No | Incidental use, raised platform height, drainage, trees |
| Any position, flat or maisonette | Right unavailable | Full application needed |
Trees and root protection areas
A hard surface is one of the easiest ways to kill a mature tree, because compaction and sealing cut off water and air to the roots. If the tree is protected by a Tree Preservation Order or stands in a conservation area, works likely to damage it need the council's consent, and carrying them out without consent is an offence.
Where a surface has to go inside a root protection area calculated under BS 5837:2012, the solution is a no-dig construction: a cellular confinement system laid on a geotextile over the existing ground, with no excavation and no change to levels beyond the build-up. A tree survey will give you the root protection area and the specification, and it is worth having even where no order applies, because a neighbour's tree has the same roots as a protected one.
When a rear parking area needs permission
Pull the threads together. You need an application if the house is a flat, if Part 1 rights have been removed by condition or by an Article 4 direction, if the use is not incidental to the dwelling, if the surface is a raised platform over 300 millimetres, if a new access is needed onto a classified road, or if the works would damage a protected tree.
And if you want certainty rather than an opinion, a lawful development certificate under section 192 of the Town and Country Planning Act 1990 is the only formal way to confirm that works are lawful before you start.
Enter your postcode on PlanScope to see which documents a householder application would need if your project falls outside permitted development.
This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
Does a rear patio need to be permeable?
No. The porous surfacing condition in Class F applies only to land between a wall forming the principal elevation of the house and a highway, so a rear surface can be any material. Drainage still matters practically: fall the surface away from the building and keep the finished level below the damp proof course.
How big can a front driveway be before permission is needed?
Any size, if it is porous or if run-off is directed to a permeable area within your own curtilage. For impermeable surfaces draining to the street, guidance on the Planning Portal treats areas of around five square metres or less as outside the requirement. That is guidance rather than wording in the Order, so check with your council.
When is a patio treated as a raised platform?
When it stands more than 300 millimetres above the adjoining ground. Part 1 treats a raised platform differently from a hard surface, excluding it from the outbuilding right in Class E and restricting it under Class A. On sloping gardens, measure against the existing ground at the lowest point rather than the highest.
Do I need permission for a dropped kerb to a rear parking area?
If the access is onto a classified road, yes, because Part 2 only permits an access to a highway that is not a trunk or classified road. The crossover itself also needs the highway authority's consent under the Highways Act 1980, and that is a separate approval which usually follows the planning position.
Can I pave under a protected tree?
Not without consent. Works likely to damage a tree covered by a Tree Preservation Order, or a tree in a conservation area, require the council's consent and carrying them out without it is an offence. Where a surface must sit inside the root protection area, a no-dig cellular confinement build-up over a geotextile is the usual solution.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.