Which Reports Do I Need

Reports for a Green Belt brownfield redevelopment

9 min readBy PlanScope Editorial Team

A Green Belt brownfield scheme turns on whether the land is previously developed and which exception applies. The openness assessment and the comparison schedule do the rest of the work.

A Green Belt brownfield redevelopment needs a planning statement that nails down two things before anything else: that the land is previously developed within the national definition, and which Green Belt exception the scheme relies on. Get those right and the evidence base follows logically. Get them wrong and you will spend the application arguing very special circumstances you did not need to argue, or relying on an exception that does not apply.

On top of that, the technical core is an openness assessment supported by a schedule of existing and proposed volume, footprint, height and site coverage, and landscape and visual work proportionate to how sensitive the site is.

Establishing that the land is previously developed

The definition sits in the National Planning Policy Framework glossary and it is narrower than people assume. Previously developed land is land which is or was occupied by a permanent structure, including the curtilage of the developed land and any associated fixed surface infrastructure. Verify the current wording on gov.uk, because the Framework was reorganised around policy codes in August 2026.

Four exclusions do most of the damage:

  • Land last occupied by agricultural or forestry buildings. A redundant farmyard with four steel-framed barns is not previously developed land, however industrial it looks.
  • Land developed for minerals extraction or waste disposal by landfill where restoration provision has been made.
  • Land in built-up areas such as residential gardens, parks, recreation grounds and allotments.
  • Land previously developed where the remains of the structures have blended into the landscape.

So the first piece of evidence is a history of the site's lawful use and built form: historic mapping at successive dates, aerial photography, the planning history, rating records where available, and photographs of what stands there now. Where the buildings were agricultural, say so and move to a different argument, because an application built on a mistaken previously developed land claim fails on its own terms.

Curtilage needs its own paragraph. The definition includes the curtilage of the developed land, with the explicit caution that it should not be assumed the whole curtilage can be developed. Mark the curtilage on a plan and justify its extent, and expect the authority to take a tighter view than you do.

The December 2024 Framework also introduced a further category of Green Belt land described as grey belt, defined by reference to previously developed land and to land that does not strongly contribute to certain Green Belt purposes. The definition and its policy code have moved since, so check the current Framework and any local evidence on how your authority applies it rather than relying on a description written when it was new.

Which exception the scheme relies on

Green Belt policy works by exception. Inappropriate development is by definition harmful and should be refused unless very special circumstances exist, so the whole case turns on whether your scheme sits inside an exception and therefore is not inappropriate at all.

For a brownfield redevelopment, the relevant exception covers limited infilling, or the partial or complete redevelopment of previously developed land, where the development either would not have a greater impact on the openness of the Green Belt than the existing development, or would not cause substantial harm to openness where it re-uses previously developed land and contributes to meeting an identified affordable housing need.

Read that carefully, because it contains two different tests with two different evidence requirements. The first is comparative: your scheme against what is there now. The second is absolute, with an affordable housing condition attached, and it is the route that requires housing need evidence rather than only a volume schedule.

Other exceptions sometimes fit better. Replacement of a building in the same use and not materially larger than the one it replaces is a cleaner argument than redevelopment where the scheme really is a like-for-like replacement. Where a lawful existing use could be resumed or intensified without permission, that is a fallback position with real weight, and it has to be evidenced rather than asserted, as set out in the evidence base for a scheme relying on a fallback position.

State the exception you rely on in the first page of the Planning Statement, with the relevant policy wording quoted and the edition named. Officers reading a Green Belt application look for that paragraph first.

Assessing effect on openness

Openness is one of the two essential characteristics of the Green Belt, alongside permanence, and the case law on it is settled enough to work with.

The Court of Appeal in Turner v Secretary of State for Communities and Local Government confirmed that openness is not purely a visual concept and has a spatial dimension: the absence of built form matters in itself. The Supreme Court in Samuel Smith Old Brewery (Tadcaster) v North Yorkshire County Council then held that openness is a broad policy concept, that visual impact may be relevant but is not necessarily so in every case, and that how to approach it is a matter of planning judgement for the decision maker.

What that means in practice is that your assessment needs both strands. A spatial account of built form, measured. And a visual account of how the site reads from public viewpoints, evidenced with photography and, on sensitive sites, with modelled views.

Deal with the things that are not buildings. Hardstanding, external storage, parked vehicles, lighting columns, boundary treatment and domestic paraphernalia all affect openness, and a scheme that reduces building volume while spreading activity across a wider area can be worse rather than better. That is the single most common weakness in these applications.

The comparisons that actually help

Produce a schedule, as a drawing-referenced table, comparing existing and proposed. The categories that carry weight:

Measure Why it matters
Built volume in m³ The spatial test, and the clearest single figure
Footprint in m² Land take, and the usual focus of an objection
Maximum and ridge heights Visual prominence from public viewpoints
Site coverage as a percentage Openness across the whole site rather than building by building
Area of hardstanding Spread of development beyond the buildings
Developed area within the curtilage Whether the scheme stays within the existing extent

Give every figure a drawing reference and a method note explaining how volume was calculated, measured externally and to what datum. An unexplained volume figure invites a recalculation by the authority, and recalculations rarely go the applicant's way.

Three presentational points that help. Overlay the existing and proposed footprints on one plan. Show the existing and proposed building envelopes on a section through the site taken from the nearest public vantage point. And where the proposal is taller but smaller in footprint, say so plainly and address the trade-off, because an officer will spot it.

Where the existing use is a redundant employment site, much of this evidence doubles up with what is needed for a scheme replacing an employment building.

When very special circumstances still have to be argued

If the scheme falls within an exception, it is not inappropriate development and very special circumstances are not required. Arguing them anyway signals that you do not believe the exception applies.

Very special circumstances come back into play in three situations. Where the comparative openness test is not met, so the scheme is inappropriate. Where the scheme is inappropriate for another reason, such as including development beyond the previously developed extent. And where the authority disagrees with your previously developed land analysis and determines the application on the alternative basis, which is why a well-advised submission often runs a short secondary case.

A very special circumstances case needs benefits that are specific, evidenced and capable of being secured: housing delivery against a stated shortfall, affordable provision beyond policy requirement, removal of a demonstrably harmful existing use, remediation of contamination, biodiversity gain above the statutory minimum, public access. Each has to be weighed against the harm to the Green Belt, which attracts substantial weight by definition, plus any other harm.

Be realistic about what does not work: generic regeneration claims, construction employment without figures, and the argument that the site is already untidy. Untidiness is not a benefit, though removing a harmful use can be.

Landscape and visual evidence, proportionate to the case

Scale the landscape work to the sensitivity of the setting, not to the size of the scheme.

On an enclosed site surrounded by mature vegetation with no public views, a landscape appraisal with a photographic record from agreed viewpoints and a section or two may be enough. On an open site visible from a ridge, a public right of way or a National Landscape boundary, you need a Landscape and Visual Impact Assessment prepared to the recognised guidelines, with viewpoints agreed with the authority before the photography is taken.

Agree the viewpoints in writing. The most avoidable failure in Green Belt applications is an assessment from viewpoints the officer did not accept, which has to be redone from the ones they wanted, in the season they wanted, which may mean waiting for leaf-off conditions.

Where modelled or verified views are needed, specify the method and the camera data, and keep the existing and proposed views matched. Councils usually expect a suitably qualified landscape author for this work, and professional review before submission is strongly advised. The wider document set will also normally include a design and access statement, an ecological appraisal with a biodiversity net gain assessment, contaminated land work on a former industrial site, a transport statement or assessment depending on scale, and a drainage strategy.

Conditions controlling what happens next

Openness erodes after permission, and authorities know it.

Expect, and consider offering, conditions that remove permitted development rights for extensions, outbuildings, hardstanding, means of enclosure and external lighting, and that restrict external storage and the extent of domestic curtilage. On a residential scheme, a condition limiting the curtilage to an area shown on a plan is common and sensible, because it prevents the gradual spread that undermines the comparison you relied on.

Offering those conditions is usually in the applicant's interest. They are the direct answer to the objection that the scheme is a foot in the door, and they cost nothing at the point of grant.

Keep the openness schedule, the approved drawings and the condition wording together in one file. A future application on the same site will be judged against the position this permission established, and that file is what sets the baseline.

Enter your postcode on PlanScope to see which reports a Green Belt site is likely to need, or browse all 66 report types. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

This is general guidance, not legal advice. Green Belt policy has been amended more than once in recent years, so check the current Framework wording and your authority's local evidence before relying on any of it.

Frequently asked questions

Is a redundant farmyard previously developed land?

No. The national definition expressly excludes land last occupied by agricultural or forestry buildings, however industrial the buildings look. It also excludes residential gardens, parks and recreation grounds in built-up areas, restored minerals and landfill sites, and land where the remains of structures have blended into the landscape.

Do I need to argue very special circumstances?

Only if the scheme is inappropriate development. Where it falls within a Green Belt exception it is not inappropriate, and arguing very special circumstances anyway suggests you do not believe the exception applies. Many well-advised submissions run a short secondary case in case the authority rejects the previously developed land analysis.

Is openness about views or about built form?

Both. The Court of Appeal in Turner confirmed openness has a spatial dimension and is not purely visual. The Supreme Court in Samuel Smith Old Brewery held it is a broad policy concept where visual impact may be relevant but is not necessarily so, and the approach is a matter of planning judgement.

Which comparisons should the openness assessment include?

Built volume in cubic metres, footprint in square metres, maximum and ridge heights, site coverage as a percentage, area of hardstanding, and the developed area within the curtilage. Give each figure a drawing reference and a method note explaining how volume was measured and to what datum.

What conditions should I expect on a Green Belt permission?

Conditions removing permitted development rights for extensions, outbuildings, hardstanding, means of enclosure and external lighting, restrictions on external storage, and often a plan defining the permitted curtilage. Offering these is usually in the applicant's interest, because they answer the objection that the scheme is a foot in the door.

Sources and further reading

green beltpreviously developed landopennesswhich reportsvery special circumstanceslandscape

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Which Reports Do I Need

View all →
Which Reports Do I Need7 min read

Foul drainage for a dwelling with no mains connection

Off-mains applications turn on a percolation test and a layout that meets every separation distance. A new septic tank to a watercourse is not permitted.

Read article →
Which Reports Do I Need7 min read

A borehole water supply for a new dwelling: what to submit

A borehole for a single household needs no abstraction licence below 20 cubic metres a day. The planning case still needs a yield test and a quality analysis.

Read article →
Which Reports Do I Need8 min read

Temporary dwelling for a new rural enterprise: the evidence

A temporary rural worker dwelling is granted on evidence about the enterprise rather than the house: functional need, labour units and a costed business plan.

Read article →
Which Reports Do I Need8 min read

Site compound, haul road and wheel wash: what to submit

A compound and haul road are development. Either they sit inside the red line and on the approved plans, or a Construction Management Plan condition controls them.

Read article →
Which Reports Do I Need7 min read

A temporary marketing suite on a development site

A sales suite open to the public falls outside the temporary building right for construction accommodation. Temporary permission, advertisement consent and a removal condition are the normal package.

Read article →