Section 70C: when a council can refuse to entertain your application
Section 70C of the Town and Country Planning Act 1990 lets an authority decline to determine an application that overlaps a pre-existing enforcement notice. The order in which notice and application land decides what you can argue.
If you own a flat conversion or an HMO that has been built or changed without permission, the council does not have to consider a retrospective application at all. Section 70C of the Town and Country Planning Act 1990 lets a local planning authority decline to determine an application where granting it would permit any part of what a pre-existing enforcement notice already describes as a breach. There is no appeal against that decision. For landlords caught between an enforcement notice and a half-finished scheme, the order in which the paperwork lands matters more than the merits of the development.
What the power actually allows
Section 70C was inserted by section 123 of the Localism Act 2011. It applies where an enforcement notice already exists, issued before the application was made, and where granting permission would involve granting consent for the whole or any part of the matters stated in that notice as constituting the breach.
The authority may decline. It is not obliged to. That discretion is the whole battleground: officers can and do accept applications after a notice where the revised scheme answers the harm the notice identified, and they can refuse to engage where the application simply re-presents the same thing in a new wrapper.
Two details trip people up. The notice has to be pre-existing, so a notice served the week after your application went in does not engage the power. And the overlap only needs to be partial. An application covering a rear extension plus the unauthorised loft conversion that the notice targets can be declined in its entirety, because granting it would grant permission for part of the matters specified.
When an authority can use it
In practice the power bites in three situations. The first is the straight retrospective application for exactly what the notice requires to be removed. The second is a cosmetically altered version: same subdivision, one fewer bedroom. The third is the sequential application, where an owner tries a second and third attempt after a refusal, each time inviting the authority to spend eight weeks on the same ground.
What it is not is a general screening tool. The authority has to identify the matters specified in the notice and compare them with what the application would authorise. Where the application is for something materially different, declining to determine becomes harder to defend, and a decision taken without that comparison is the kind that gets quashed.
Officers normally write to say they are minded to decline and give a short window to respond. Use it. That letter is the only practical chance to persuade them that your scheme is a different proposal rather than the same one.
The ground (a) appeal and the timing trap
The companion provision is section 174(2A), inserted by the same section of the Localism Act. Where land is in England, an enforcement notice appeal cannot be brought on ground (a), that planning permission ought to be granted, if the notice was issued after a related planning application was made but before the eight week determination period for that application expired.
Read those two provisions together and the trap becomes clear. Apply first and the council can issue a notice inside the eight weeks, which removes your ground (a) appeal. Do nothing and wait for the notice, and section 70C lets the council refuse to entertain the application you then make. Either sequence can leave you without a forum in which the planning merits of the development are ever considered.
Grounds (b) to (g) survive in both cases. So does ground (c), that there has been no breach of planning control, and ground (d), that the time for enforcement has passed. Those are factual and legal arguments rather than merits arguments, and for conversion work they are often the stronger ones anyway.
| Route | Merits considered | Where it is heard |
|---|---|---|
| Section 78 appeal against refusal | Yes | Planning Inspectorate |
| Enforcement appeal, ground (a) | Yes, unless barred by s174(2A) | Planning Inspectorate |
| Enforcement appeal, grounds (c) and (d) | No, legal and factual only | Planning Inspectorate |
| Certificate of lawfulness, s191 | No, lawfulness only | Authority, then appeal |
| Challenge to a s70C decision | No | High Court, judicial review |
Order of events, and what to do with it
The practical sequence for a landlord who knows a breach exists runs roughly like this.
- Establish the date the breach began and gather the evidence that fixes it: tenancy agreements, council tax records, utility accounts, dated photographs, bank statements for the works.
- Test immunity. Under the Levelling-up and Regeneration Act 2023 the enforcement time limit in England became ten years for both operational development and changes of use, with the change applying to breaches from its commencement in April 2024. Older breaches may still fall under the previous four year rule. Check the commencement position before relying on either.
- If the works are immune, apply for a certificate of lawfulness under section 191 rather than for planning permission. Section 70C does not touch that route.
- If they are not immune, decide whether you want the merits tested, and accept that applying puts the ground (a) appeal at risk for eight weeks.
- Open a conversation with the enforcement officer before anything is served. A notice not yet issued is the easiest notice to influence.
An illustrative example. A terraced house in a university town is converted to a six bed HMO without permission in an area covered by an Article 4 direction removing the C3 to C4 right. The council issues a notice requiring reversion to a single dwelling. The owner then applies for a five bed HMO with a rear bin store and cycle parking. The council can decline under section 70C, because granting the application would grant permission for part of the matter specified, the use as a house in multiple occupation. A better route is to ask whether the use began more than ten years ago, and if not, to negotiate the scope of the notice before it is served.
Challenging a decision to decline
A decision under section 70C is not a refusal, so there is no section 78 appeal. The only challenge is judicial review in the Planning Court, and planning claims must be filed promptly and in any event within six weeks of the decision.
The arguments that succeed are process arguments. Did the authority compare the matters in the notice with what the application would authorise? Did it consider the differences the applicant raised? Did it take account of a change in policy or in the development plan since the notice was issued, which is a textbook material consideration and can make a fresh application different in substance? Six weeks is short, and a judicial review will cost more than the application did.
Most landlords do better by removing the reason for the notice. Where part of the scheme can be made acceptable, a narrower application that plainly does not overlap with the specified matters is harder to decline.
Evidence to assemble before you apply
Before any application goes in, put together the file you would need at an inquiry. Dated evidence of when the use or the works began. Internal floor layouts as built, with room sizes against the nationally described space standard. Amenity evidence covering refuse storage, cycle parking and overlooking. A parking stress survey where the authority's standards point that way. If the matter reaches an inquiry or a hearing, that material becomes the raw stock for the statement of common ground you will be asked to agree with the council.
Then decide which document set the application itself needs. A retrospective HMO application in an Article 4 area usually wants a planning statement dealing with the policy tests, an amenity assessment, and parking evidence. The full list of supporting report types is a reasonable place to scope that out before you commit to a route.
This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it, and remember that a lawful development certificate is the only formal way to confirm that works or a use are lawful.
Enter your postcode on PlanScope to see which reports your site is likely to need. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
Can I appeal a decision to decline under section 70C?
No. A decision to decline to determine is not a refusal, so there is no appeal to the Planning Inspectorate under section 78. The only route is judicial review in the Planning Court, and planning claims must be filed promptly and within six weeks of the decision. Most owners get further by negotiating the scope of the enforcement notice instead.
Does section 70C apply if the enforcement notice came after my application?
No. The power only applies to a pre-existing enforcement notice, meaning one issued before the application was made. But a notice issued during the eight week determination period triggers a different restriction under section 174(2A), which removes the ground (a) appeal on the enforcement notice for land in England.
Is a retrospective application the same as a lawful development certificate?
No. A retrospective application asks for permission for development already carried out and is judged on planning merits. A certificate under section 191 asks the authority to confirm that works or a use are already lawful, usually through the passage of time. Section 70C does not apply to certificate applications.
What if my new application is different from what the notice describes?
Then declining becomes harder to justify. The authority has to compare the matters specified in the notice with what granting the application would authorise. Where the overlap is partial, it can still decline the whole application, so a narrower proposal that avoids the specified matters is usually the safer approach.
How long is the enforcement time limit now?
The Levelling-up and Regeneration Act 2023 moved England to a single ten year limit for both operational development and changes of use, applying to breaches from its commencement in April 2024. Earlier breaches may still be caught by the previous four year rule for building works and single dwellings. Check the commencement position before relying on immunity.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.