Trade draw and turnover in a retail impact test
A retail impact assessment rests on three numbers: proposal turnover, centre turnover and trade diversion. How each is derived, and the assumptions that get challenged.
Retail impact assessment methodology comes down to three numbers and the assumptions behind each: the turnover of the proposal, the turnover of each centre that might lose trade, and the proportion of the proposal's trade drawn from each of those centres. Everything else in the report supports those figures. An assessment that presents a percentage impact without showing how each of the three was derived gives the authority nothing to test, and officers treat it accordingly.
The impact test is triggered where a retail or leisure proposal outside a town centre is not in accordance with an up-to-date development plan and exceeds the floorspace threshold. National policy sets a default of 2,500 m² where the local plan has not set its own figure, and plenty of plans set a lower one, so check the adopted policy first. The test is separate from the sequential test, which asks about site availability rather than about trade.
What the impact test asks
Two questions. Whether the proposal would have an adverse impact on existing, committed and planned public and private investment in a centre in the catchment. And whether it would adversely affect the vitality and viability of a town centre, including local consumer choice and trade in the centre and the wider retail catchment.
Note what the policy does not say. There is no numerical threshold at which impact becomes unacceptable. The judgement is about significance in the context of each centre's health, which is why an impact figure of the same size can be fatal for a fragile market town and immaterial for a large centre. So the report needs a health assessment of each centre alongside the arithmetic, covering vacancy, the multiple and independent mix, footfall, rents where available and any investment in the pipeline.
A Retail Impact Assessment that reports impact percentages without centre health commentary has answered half the question.
Defining the study area and the centres assessed
The study area should follow shopping patterns rather than administrative boundaries, and it is usually drawn as zones based on postcode sectors, with the zones informed by a household survey or by an existing study the authority commissioned.
Which centres to assess is a matter to agree at scoping. The list should take in every centre that could plausibly lose trade, including centres in neighbouring authorities, because a scheme on an authority boundary often has more effect on the centre next door. Leaving out a centre that an objector then raises is a weak position to be in at committee.
Where the authority holds a recent retail study, use its zones and its survey data. Two competing catchment definitions in the same evidence base is an argument nobody wins.
Turnover estimates and where the figures come from
Build the figures in a stated order so a reviewer can follow them.
- Population by zone in the base year and the design year, from published projections, with the source and vintage given.
- Expenditure per head by goods category, convenience and comparison separately, from a published expenditure dataset with the price base stated.
- A deduction for special forms of trading, which is mostly online shopping, applied at a rate that is justified rather than assumed, and growing through the forecast period.
- Total available expenditure by zone and category for both years.
- Existing centre turnovers, derived either from a household survey market share analysis or from floorspace multiplied by benchmark sales densities.
- The proposal's turnover, from net sales area multiplied by a sales density appropriate to the operator type and the goods mix.
The design year matters and should be the first full year of trading, not an arbitrary horizon. Pushing the design year out increases available expenditure growth and flatters the impact figure, which is the first thing an authority's retail consultant will check.
Sales density is the single most contested input. A density taken from a high performing national operator applied to a scheme with no identified occupier is an assumption the assessment should test rather than rely on.
Trade draw and diversion assumptions
Trade draw is where the proposal's turnover comes from, expressed as a percentage from each zone. Diversion is where that trade is taken from, expressed as a percentage from each centre and from other out-of-centre facilities.
These are judgements, and the report has to explain them rather than simply tabulate them. The defensible basis is a combination of drive time, the comparable offer in each centre, the pattern revealed by the household survey for similar existing facilities, and the physical relationship between the site and each centre.
Three common failings. Diverting a large share of trade from other out-of-centre stores rather than from centres, which conveniently reduces town centre impact and needs real justification. Assuming a share of turnover is new expenditure retained in the area that would otherwise have leaked elsewhere, without survey evidence of the leakage. And applying uniform diversion across centres of very different character, when a discount food store does not compete with a market town's independent comparison offer in the same way at all.
Then convert to impact: diversion from each centre divided by that centre's design year turnover, reported as a percentage, with the absolute figures shown alongside so the reader can see the scale.
Cumulative impact with committed schemes
Impact has to be assessed cumulatively with other commitments, which means unimplemented permissions and resolutions to grant within the study area, rather than your scheme in isolation.
Build a commitments schedule with the application reference, floorspace, status and assumed opening year for each, and state which ones you have included and why any were excluded. A permission three years old with no sign of implementation is arguably not a commitment, but say that rather than quietly dropping it.
Cumulative impact is also where an authority's own evidence base matters most, because the retail study may already model commitments in the design year. Where it does, follow it or explain the departure.
Testing the sensitivity of the conclusion
A conclusion that survives only on the central case is not a conclusion. Run and report sensitivity tests on the inputs that move the answer: a lower and a higher sales density for the proposal, a higher special forms of trading deduction, an alternative diversion pattern weighted more heavily towards the nearest centre, and a design year brought forward.
Present the results as a short table showing the impact percentage on each centre under each scenario. Where the conclusion changes under a plausible scenario, say so and explain why the central case is the better judgement. That is far stronger than presenting a single figure and waiting to be challenged.
Presenting the figures transparently
Give the tables, the questionnaire and the raw survey results as appendices, state every assumption in one place rather than scattered through the text, and use consistent price bases throughout with the base year stated.
Then write a conclusion that answers the policy test in its own words, centre by centre, rather than reciting the arithmetic. The decision maker needs to know whether the effect on each centre's vitality and viability is adverse and, if so, how adverse against that centre's current health.
The sequential test runs alongside, and the two documents should share the same catchment definition. We have covered the flexibility and disaggregation arguments that arise there in flexibility and disaggregation in the sequential test, and the Sequential Test (Retail) page sets out what that report contains. Where the scheme's economic case is also in play, an Economic Impact Assessment should use the same turnover assumptions, because inconsistency between the two is an easy point for an objector to make.
Enter your postcode to see which of the 66 reports your scheme is likely to need. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required, and this is general guidance rather than legal advice.
Frequently asked questions
When is a retail impact assessment required?
Where a retail or leisure proposal outside a town centre is not in accordance with an up-to-date development plan and exceeds the floorspace threshold. National policy applies a default of 2,500 square metres where the local plan sets no figure of its own, and many plans set a lower local threshold, so read the adopted policy before relying on the national default.
Is there an impact percentage that means refusal?
No. National policy sets no numerical threshold, so the judgement is about whether the effect on a centre's vitality and viability is adverse in the context of that centre's health. The same impact figure can be serious for a fragile market town and immaterial for a large centre, which is why a health assessment of each centre is needed alongside the arithmetic.
How is the proposal's turnover estimated?
Net sales area multiplied by a sales density appropriate to the operator type and goods mix, in a stated price base. Sales density is the most contested input in the whole assessment, particularly where no occupier is identified, so test it with sensitivity runs at a lower and a higher figure rather than presenting a single central case.
What is the difference between trade draw and diversion?
Trade draw is where the proposal's turnover comes from, expressed by catchment zone. Diversion is where that trade is taken from, expressed by centre and by other out-of-centre facilities. Impact is then diversion from a centre divided by that centre's design year turnover. Both are judgements and both need explaining rather than simply tabulating.
Which commitments go into the cumulative assessment?
Unimplemented permissions and resolutions to grant within the study area, set out in a schedule with the application reference, floorspace, status and assumed opening year. State which you included and why any were excluded. Where the authority's own retail study already models commitments in the design year, align with it or explain the departure.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.