Viability, Obligations and Commercial

Marketing evidence that supports a change of use

6 min readBy PlanScope Editorial Team

Policies protecting shops, pubs and employment land put the burden on you. The campaign's length, price, lease terms and enquiry records are what decide the application.

If a local plan policy protects the existing use of a building, the marketing evidence change of use case is usually what decides your application. The authority is being asked to accept that there is no realistic prospect of the protected use continuing, and the only way to show that is a marketing campaign that was long enough, priced realistically and advertised where the relevant occupiers look.

Most refusals on this ground are not about the merits of the new use. They are about a campaign that ran for six months at an asking rent nobody would pay, on one website, with no record of who enquired.

Why authorities ask for it

Policies protecting employment land, shops in designated frontages, public houses and community facilities all work the same way. The use is protected unless the applicant demonstrates that it is no longer viable or that there is no demand for it. The burden sits with you.

Most adopted plans set out what evidence they expect, often in a supporting paragraph or a supplementary planning document rather than in the policy itself. Read both. A policy that says "evidence of a sustained marketing campaign" with a supporting paragraph specifying 12 months and two agency channels means 12 months and two channels.

Where the plan is silent, the authority will apply its own practice, and that practice is usually discoverable from recent committee reports on similar applications in the borough.

Duration, terms and asking price

Three variables decide whether the campaign is accepted, and applicants control all three.

Duration is the easiest to get right and the most common failure. Where the plan specifies a period, run the full period and a little more. Where it is silent, 12 months of continuous marketing is the working norm for a commercial or community building, and anything under six months will be dismissed. Continuous matters: a campaign paused for four months in the middle is not a 12-month campaign.

Price has to be defensible against comparable evidence. An asking rent or price set above the market produces no interest, and the authority will say so. The honest approach is to instruct an agent to advise on the asking terms at the outset, record that advice, and reduce the asking terms during the campaign if there is no interest. A campaign that started high and was reduced twice, with the dates recorded, is far stronger evidence than one that held an unrealistic figure for a year.

Lease terms are the overlooked one. A building offered only on a 15-year full repairing and insuring lease with no break, in a market where occupiers take five-year terms, has not been realistically available. Flexibility on term length, break clauses, rent-free periods and whether the landlord will split the floorplate all go to whether the unit was realistically on the market.

Channels the authority will accept

Advertising has to reach the people who would take the use. Expect to show a combination.

  • A commercial agent instructed on the property, with the particulars as issued
  • A listing on the agent's own site and on the main commercial property portals
  • A board or notice on the building itself, photographed and dated
  • Direct approaches to identified potential occupiers in the sector, with dates
  • Trade press or sector-specific channels where the use has them, such as the licensed trade or the care sector
  • Local advertising where the use serves a local catchment

A single portal listing is not a campaign. Nor is a board alone. The test officers apply is whether somebody looking for premises of that type in that area would have found it, and that usually means at least an instructed agent plus a visible board plus one sector channel.

Keep the artefacts. Dated screenshots of each listing, the particulars as issued at each asking price, photographs of the board with a visible date, and the agent's instruction letter. Reconstructing this a year later is miserable and the gaps show.

Recording enquiries and viewings

This is the part that separates accepted evidence from rejected evidence, and it costs nothing if you set it up at the start.

Keep a schedule with one row per enquiry: date, source of enquiry, the party's name or sector, what they were told, whether they viewed, and why it did not proceed. That last column is the one the officer reads. An enquiry that failed because the enquirer wanted a shorter lease than the landlord would offer tells against you. One that failed because the unit was too small for their operation, or because they could not make the location work, supports you.

Where an offer was made and rejected, say so and say why. An offer at 80 per cent of the asking rent that the landlord declined will be treated as evidence of demand, and concealing it is worse, because officers often know the market and sometimes know the parties.

Viewings without enquiries recorded look like no viewings at all. If nothing happened for 12 months, say that plainly and have the agent confirm it in writing.

Independent agent commentary

A letter from the instructed agent carries more weight than the applicant's own narrative, and a report from an independent agent who was not instructed on the sale carries more still.

What the commentary should cover is the state of the local market for that use, the comparable evidence for the asking terms, the reasons they believe the campaign did not produce a letting, and whether a different approach would have produced a different outcome. That last question is the one an objector will ask, so answer it.

Where the policy asks for viability as well as demand, you are into separate territory. A viability assessment prepared on RICS guidance is a different document from a marketing report, and councils expect a suitably qualified author for it. Do not let an agent's letter stand in for a viability appraisal when the policy asks for both.

Presenting the evidence

Officers assess what they can find. A marketing report that buries the schedule of enquiries in an appendix behind 40 pages of particulars invites the conclusion that the evidence is thin.

  1. A one-page summary: period marketed, asking terms and any changes with dates, channels used, enquiries received, viewings held, offers received.
  2. The enquiry schedule in full, as a table.
  3. The agent's letter or report.
  4. The artefacts as dated appendices, indexed.
  5. The policy requirement quoted, with a short paragraph against each limb saying how the evidence meets it.

That last step is the one most reports omit, and it is the one that makes the officer's job easy. If the policy asks for 12 months, two channels and evidence of asking price reduction, write three short paragraphs saying what you did on each.

Where the protected use is retail floorspace in a designated centre, the demand question sits alongside a quantitative test, and the trade draw and turnover methodology in a retail impact test explains how that one is argued. Community facilities are different again, because the policy usually asks about alternative provision as well as demand.

A short, well-ordered planning statement that pulls the marketing evidence into the policy framework, rather than appending it, is what gets these applications through delegated determination instead of committee.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. Browse all 66 PlanScope report types to see which supporting documents a change of use application needs.

Frequently asked questions

How long should a marketing campaign run before a change of use application?

Where the local plan or a supplementary document specifies a period, run the full period. Where it is silent, 12 months of continuous marketing is the working norm for a commercial or community building, and campaigns under six months are routinely dismissed. Continuity matters, so a campaign paused for several months in the middle does not count as continuous.

Does the asking price matter to the marketing evidence?

A great deal. Terms set above the market produce no interest and the authority will say so. Instruct an agent to advise on asking terms at the outset, record that advice, and reduce the terms during the campaign if nothing comes in. A campaign that started high and was reduced twice, with dates recorded, is much stronger evidence.

What records should I keep during the campaign?

Dated screenshots of every listing, the particulars as issued at each asking price, photographs of the board on the building with a visible date, the agent's instruction letter, and a schedule with one row per enquiry giving the date, the party, whether they viewed and why it did not proceed. Reconstructing this later rarely works.

Is one listing on a property portal enough?

No. The test officers apply is whether somebody looking for premises of that type in that area would have found it. In practice that means an instructed commercial agent, a visible board on the building, and at least one sector-specific channel such as the trade press for licensed premises or care use.

Do I have to disclose an offer the landlord rejected?

Yes. An offer below the asking terms that was declined will be treated as evidence of demand, which weakens the case, but concealing it is worse. Officers often know the local market and sometimes know the parties, and a campaign record that omits a known offer undermines the credibility of the whole submission.

Sources and further reading

change of usemarketing evidenceemployment landviabilitylocal plan policycommercial property

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Viability, Obligations and Commercial

View all →
Viability, Obligations and Commercial7 min read

Build cost indices and the date of the cost plan

Cost indices and tender price indices measure different things. How the base date, the index and the valuation date interact, and how to state the basis so it holds up.

Read article →
Viability, Obligations and Commercial6 min read

Professional fees and contingency in a development appraisal

Fees and contingency look like small lines in an appraisal and move the residual land value a long way. Both are tested, and both are defended with scope documents rather than convention.

Read article →
Viability, Obligations and Commercial7 min read

Transport contributions and the trip based calculation

Highway authorities build sustainable transport contributions from trip rates and mode share. Understanding how the figure is assembled is the only way to test whether it meets the statutory tests.

Read article →
Viability, Obligations and Commercial6 min read

Affordable housing on a site with a demolition credit

Twelve houses replacing four is twelve gross and eight net. Whether the threshold and percentage are read gross or net can be the whole margin, and the levy applies a separate floorspace test with its own timing trap.

Read article →
Viability, Obligations and Commercial6 min read

Nutrient neutrality mitigation cost in a viability appraisal

In an affected catchment, nutrient mitigation is a condition of consent rather than an enhancement. Price it per dwelling with a dated quotation, and model the securing obligation and the programme delay alongside it.

Read article →
Viability, Obligations and Commercial6 min read

Finance costs and the interest assumption in an appraisal

Finance moves more when you change the model than when you change the rate. Evidencing the debit rate, splitting the fees and showing finance is counted once.

Read article →