Professional fees and contingency in a development appraisal

6 min readBy PlanScope Editorial Team

Fees and contingency look like small lines in an appraisal and move the residual land value a long way. Both are tested, and both are defended with scope documents rather than convention.

Professional fees and contingency are two of the most contested lines in a development appraisal, because they are expressed as percentages of build cost and a percentage point either way moves the residual land value more than most people expect. Neither figure is set by policy. National guidance on viability deals with gross development value, build cost, land value and return, and leaves the on-costs to conventional practice tested by the parties. So the argument is always about whether your percentage reflects the scope of work this scheme actually needs.

What the conventional percentages cover

Professional fees in a residential appraisal are usually entered at somewhere between 8 and 12 per cent of build cost, with 10 per cent as the common starting point. What that figure is meant to cover varies, which is where most of the disagreement starts.

A typical fee allowance runs to architectural design, structural and civil engineering, mechanical and electrical design, quantity surveying and employer's agent, principal designer duties, planning consultancy, and the technical reports supporting the application. It generally does not cover legal fees, agency and marketing, finance arrangement fees, or the client's own staff costs, which appear as separate lines.

Contingency is conventionally 5 per cent of normal build cost on a new build scheme, with higher figures on refurbishment and on works with significant unknowns. A refurbishment of an occupied or listed building at 5 per cent is optimistic, and reviewers know it.

These are conventions rather than rules. They are the starting point for a negotiation, not evidence, and presenting them as though they were standards invites the reviewer to substitute conventions of their own.

Fees on abnormals and on infrastructure

Applying the headline fee percentage to the whole cost line, including abnormals and external works, is where appraisals most often overstate. Demolition, piling, remediation, retaining structures and service diversions carry design input, but the fee intensity is not the same as for the superstructure.

Two approaches survive scrutiny. Apply a lower percentage to abnormals, commonly in the region of 5 per cent, and the full percentage to the building works. Or price the fees directly from the consultant appointments and enter a cash sum rather than a percentage, which is harder work and much harder to argue with.

Section 278 highway works are a case of their own, because the highway authority's own technical approval and supervision fees are charged separately and have to appear somewhere. They belong in the infrastructure line rather than in professional fees, and the division between the mechanisms is set out in section 278 agreements and where a section 106 starts.

Watch for the same cost appearing twice. Planning consultancy fees inside the professional fee percentage and again as a separate planning line is a common and avoidable error.

Contingency on normal cost and on abnormal cost

Here the logic runs the other way. Contingency exists to cover uncertainty, and abnormal costs carry more uncertainty than the superstructure, so a contingency applied only to normal build cost understates the risk on a brownfield site.

The defensible position on a site with significant ground risk is a differentiated contingency: a modest allowance on the building works and a larger one on remediation, piling and anything below ground. The figure follows the investigation. Where a Phase 2 intrusive investigation has been completed and the remediation strategy is designed, the contingency on that element can be low. Where only a desk study exists, it cannot.

That gives you an argument the reviewer will accept: the contingency reflects the stage of design and investigation reached, and it will reduce as the evidence improves. It also gives the council something to work with on a review mechanism, because a contingency drawn down and unspent is exactly what a late stage review is designed to capture.

Do not run a contingency on the fees line as well as on the build cost without saying so.

Where reviewers cut the allowances

Independent reviewers appointed by councils tend to attack five things.

  • A fee percentage above 10 per cent with no schedule of appointments behind it.
  • The full fee percentage applied to abnormals and external works.
  • Contingency above 5 per cent on a straightforward new build with a completed ground investigation.
  • Contingency applied to the land cost or to finance, which it should not be.
  • Site specific allowances described in the text but absent from the inputs, or the reverse.

The pattern is consistent: unevidenced percentages get moved towards the convention, and evidenced cash sums usually survive. If a line matters to the outcome, spend the time to evidence it rather than arguing about the convention.

Double counting against profit for risk

The developer's return is compensation for risk. National guidance recognises that a return in the region of 15 to 20 per cent of gross development value may be a suitable return for a market housing scheme, with a lower return on the affordable element reflecting its lower risk.

That creates an obvious tension. A generous contingency and a return at the top of the range both price the same uncertainty, and a reviewer who sees 10 per cent contingency alongside a 20 per cent return will reduce one of them.

The answer is to be explicit about what each covers. Contingency covers cost uncertainty within the construction phase. The return covers market risk, sales risk, programme risk and the cost of equity. Where a particular risk sits in both, say which line carries it and remove it from the other.

Where the scheme is stalled and the appraisal is being revisited, the same discipline applies to the obligations package, and the approach in renegotiating obligations on a stalled scheme depends on being able to show which costs have actually changed since the original consent.

Evidencing the figures

A fee schedule, consultant by consultant, with the stage of appointment and either a fee proposal or a signed appointment attached. That single appendix does more for an appraisal than any amount of commentary.

For contingency, the evidence is the risk register. List the identified risks, the stage of investigation that bears on each, the potential cost and the probability band, and show how the total reconciles to the percentage entered. Quantity surveyors produce these routinely for construction purposes and they rarely make it into the planning appraisal, which is a missed opportunity.

Reconcile the appraisal to the cost plan. Where the elemental cost plan says one thing and the appraisal input says another, the reviewer will find it, and the credibility of every other input falls with it.

Set all of this out in the viability assessment itself rather than in a separate note, and cross-refer it to the affordable housing statement so the two documents tell the same story about what the scheme can carry. Viability work is normally expected to be prepared by a suitably qualified valuer, and professional review of any draft is strongly advised.

You can draft the viability and affordable housing documents for a scheme on PlanScope by entering the postcode and answering the guided questions, then have the appraisal inputs prepared and checked by a qualified valuer before submission.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What professional fee percentage is normal in a planning appraisal?

Between 8 and 12 per cent of build cost is the conventional range, with 10 per cent as the usual starting point for residential development. It is a convention rather than a standard, and a figure above 10 per cent needs a schedule of consultant appointments behind it to survive an independent review.

Should contingency apply to abnormal costs?

Yes, and arguably at a higher rate than on the superstructure, because abnormals carry more uncertainty. The defensible approach is a differentiated contingency keyed to the stage of investigation reached: low where a Phase 2 investigation and remediation design exist, higher where only a desk study has been done.

Do fees apply to abnormal and external works at the same rate?

Usually not. Design input on demolition, piling, remediation and external works is real but less intensive than on the building itself, so a reduced percentage, often around 5 per cent, is common. The alternative is to price fees directly from consultant appointments and enter a cash sum.

Is a 20 per cent profit margin plus a 10 per cent contingency double counting?

A reviewer will treat it that way unless you explain the split. National guidance recognises returns in the region of 15 to 20 per cent of gross development value for market housing. Contingency should cover construction cost uncertainty, while the return covers market, sales and programme risk. State which line carries each risk.

What evidence supports a contingency figure?

A risk register listing identified risks, the stage of investigation bearing on each, the potential cost and a probability band, reconciled to the percentage entered in the appraisal. Quantity surveyors prepare these for construction purposes and they are rarely submitted with planning appraisals, which is why unevidenced percentages get reduced.

Sources and further reading

viabilitydevelopment appraisalprofessional feescontingencysection 106affordable housing

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Viability, Obligations and Commercial

View all →
Viability, Obligations and Commercial7 min read

Marketing evidence before a commuted sum is accepted

A commuted sum argument usually fails on the terms offered rather than on a lack of interest. Offer the units at the transfer value in your own appraisal, and record everything.

Read article →
Viability, Obligations and Commercial7 min read

Modifying a section 106 agreement that has become unviable

Section 106A is not a viability test. It asks whether the obligation still serves a useful purpose, and whether a modified version would serve it equally well.

Read article →
Viability, Obligations and Commercial7 min read

Agent of change obligations for a music or sports venue

Building homes beside an established venue means funding the mitigation. The split between conditions and obligations, noise deeds and their limits, and the drafting.

Read article →
Viability, Obligations and Commercial7 min read

Build cost indices and the date of the cost plan

Cost indices and tender price indices measure different things. How the base date, the index and the valuation date interact, and how to state the basis so it holds up.

Read article →
Viability, Obligations and Commercial7 min read

Transport contributions and the trip based calculation

Highway authorities build sustainable transport contributions from trip rates and mode share. Understanding how the figure is assembled is the only way to test whether it meets the statutory tests.

Read article →
Viability, Obligations and Commercial6 min read

Affordable housing on a site with a demolition credit

Twelve houses replacing four is twelve gross and eight net. Whether the threshold and percentage are read gross or net can be the whole margin, and the levy applies a separate floorspace test with its own timing trap.

Read article →