Viability, Obligations and Commercial

Affordable housing on a site with a demolition credit

6 min readBy PlanScope Editorial Team

Twelve houses replacing four is twelve gross and eight net. Whether the threshold and percentage are read gross or net can be the whole margin, and the levy applies a separate floorspace test with its own timing trap.

On a site where existing dwellings are demolished and replaced, the affordable housing requirement turns on a single question of policy drafting: does the threshold and the percentage apply to gross units or to net additional dwellings. Twelve new houses replacing four bungalows is twelve units gross and eight net. Under a policy expressed in gross terms the scheme is major development and contributes on twelve. Under a net additional policy it contributes on eight, and on some wordings it falls below the threshold entirely.

Read the policy before you bid on the land. The difference is often the whole margin.

Gross against net unit counting

Two separate counts are in play and they are routinely conflated.

Major development is defined in the Development Management Procedure Order 2015 by reference to the provision of 10 or more dwellings, or a site area of 0.5 hectares or more where the number is not known. That definition drives the application fee, the determination period, the publicity requirements and whether the national affordable housing threshold is engaged at all. It is counted on the dwellings provided, which is a gross count.

The affordable housing requirement itself comes from the local plan. The plan sets the percentage and states what it applies to, and the wording varies: some policies say "net additional dwellings", some say "dwellings", some say "units provided" and a few define the term in a glossary at the back.

So you can have a scheme that is major development on the gross count and attracts an affordable housing requirement calculated on the net count. That is not an inconsistency, it is two different instruments doing two different things.

How policy usually treats replaced dwellings

Most adopted plans calculate the requirement on net additional dwellings, on the reasoning that affordable housing policy exists to secure a proportion of new housing supply and replacing a house delivers none.

National policy supports a related idea through the vacant building credit, which offers a credit equivalent to the existing gross floorspace of a vacant building being brought back into use or demolished and replaced, offset against the affordable housing contribution. That credit is floorspace-based rather than unit-based, so it behaves differently from a net unit calculation and the two should not be double counted.

The credit has conditions attached, including that the building must be truly vacant and not have been emptied for the purpose of claiming the credit, and authorities test that. Check the current guidance on how the credit is applied before relying on it in an appraisal.

Where the plan is silent on gross or net, look for the authority's supplementary planning document on affordable housing and for recent committee reports on comparable sites. A consistent local practice is evidence even where the policy text is ambiguous.

Where the threshold is crossed only on gross numbers

This is the scenario worth modelling carefully, because the answers diverge.

An illustrative example. A site has four lawful dwellings. The scheme demolishes all four and builds 12 houses. Policy requires 35 per cent affordable housing on qualifying schemes, and the national threshold is 10 dwellings.

On a gross reading, 12 dwellings are provided, the threshold is crossed and the requirement is 4.2 units, usually taken as four units plus a commuted sum for the fraction. On a net additional reading, eight dwellings are added, and whether the threshold is crossed depends on whether the threshold itself is also read net. If both the threshold and the percentage are read net, the scheme falls below 10 and contributes nothing. If the threshold is gross and the percentage net, the requirement is 2.8 units.

Three readings, three different numbers, one policy. This example is illustrative, and the percentage used is for arithmetic rather than a statement of any authority's requirement.

The lesson is to model all three and to raise the point at pre-application rather than discovering it in the officer report.

Evidence of the lawful existing units

A credit for existing dwellings is only available for dwellings that lawfully exist. The burden of showing that sits with the applicant.

What councils accept, roughly in order:

  1. Planning permissions and, where relevant, a certificate of lawfulness for the existing units.
  2. Council tax banding records showing separate assessments for each unit over time.
  3. Electoral roll entries, tenancy agreements and utility accounts.
  4. Historic plans, sale particulars and sworn statements from occupiers.

Two situations defeat a claim. A house unlawfully subdivided into flats where the subdivision has not become immune from enforcement is one lawful dwelling, not three. And a dwelling whose residential use has been abandoned through long non-use and dereliction may not count at all, which is the same abandonment question that arises for commercial uses.

Do this work before exchange. Discovering at the officer report stage that two of your four credited units were never lawful changes the scheme's viability.

Interaction with the levy calculation

Community Infrastructure Levy uses a different test again, and it is floorspace-based rather than unit-based. The levy regulations allow the floorspace of existing buildings to be deducted from the chargeable amount, but only where the building qualifies as an in-use building, which requires a continuous period of lawful use of at least six months within the three years ending on the day planning permission first permits the chargeable development.

The practical trap is sequencing. Demolishing early, or allowing a building to stand empty while the application runs, can take the building outside the in-use test and lose the deduction entirely. On a site with four houses that have been empty for two years, the deduction may already be gone.

Keep the buildings occupied or lawfully in use for as long as the programme allows, record the occupation with dated evidence, and get advice on the in-use test before any demolition. The note on phasing a permission to spread the levy liability deals with the related timing questions.

What to state in the application

Make the counting explicit rather than leaving the officer to work it out, because an officer who works it out will usually work it out against you.

Include a schedule of existing units with addresses, evidence of lawfulness and dates of occupation. Include a schedule of proposed units by size and tenure. Set out the gross and net counts side by side with the policy wording quoted, and state the requirement you accept on your reading. Add a floorspace schedule in gross internal area for the levy, distinguishing in-use buildings from the rest.

Where the figures are contested and the scheme cannot carry the policy requirement, that is a viability question rather than a counting question, and it belongs in a Viability Assessment prepared to a recognised methodology with professional input. The counting position itself belongs in the Affordable Housing Statement, stated plainly and early.

Where a reduced provision is agreed, the mechanism for revisiting it is usually a cascade, and the note on the affordable housing cascade mechanism in a section 106 sets out how those are drafted. Browse the 66 report types to see where each document sits in the pack.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required, and this is general guidance rather than legal advice.

Frequently asked questions

Is the affordable housing threshold counted gross or net?

Major development is defined by the Development Management Procedure Order 2015 on the dwellings provided, a gross count. The affordable housing requirement itself comes from the local plan, and plans vary between net additional dwellings, dwellings and units provided. Read the policy wording and any glossary definition before modelling the scheme.

What is the vacant building credit?

National policy offers a credit equivalent to the existing gross floorspace of a vacant building being brought back into use or demolished and replaced, offset against the affordable housing contribution. It is floorspace-based rather than unit-based, carries conditions including real vacancy, and should not be double counted with a net unit calculation.

What evidence proves the existing dwellings were lawful?

Planning permissions or a certificate of lawfulness, council tax banding records showing separate assessments over time, electoral roll entries, tenancy agreements and utility accounts, and historic plans or sworn statements. An unlawful subdivision that has not become immune counts as one dwelling, not several.

Can I still deduct demolished floorspace from the levy?

Only where the building meets the in-use test: a continuous period of lawful use of at least six months within the three years ending on the day permission first permits the chargeable development. Buildings left empty during a long application, or demolished early, can fall outside it and lose the deduction.

What should the application actually say about counting?

State it explicitly. A schedule of existing units with addresses, evidence of lawfulness and occupation dates, a schedule of proposed units by size and tenure, the gross and net counts side by side with the policy wording quoted, and a gross internal area floorspace schedule distinguishing in-use buildings for levy purposes.

Sources and further reading

affordable housingsection 106cilviabilitydemolition

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Viability, Obligations and Commercial

View all →
Viability, Obligations and Commercial7 min read

Marketing evidence before a commuted sum is accepted

A commuted sum argument usually fails on the terms offered rather than on a lack of interest. Offer the units at the transfer value in your own appraisal, and record everything.

Read article →
Viability, Obligations and Commercial7 min read

Modifying a section 106 agreement that has become unviable

Section 106A is not a viability test. It asks whether the obligation still serves a useful purpose, and whether a modified version would serve it equally well.

Read article →
Viability, Obligations and Commercial7 min read

Agent of change obligations for a music or sports venue

Building homes beside an established venue means funding the mitigation. The split between conditions and obligations, noise deeds and their limits, and the drafting.

Read article →
Viability, Obligations and Commercial7 min read

Build cost indices and the date of the cost plan

Cost indices and tender price indices measure different things. How the base date, the index and the valuation date interact, and how to state the basis so it holds up.

Read article →
Viability, Obligations and Commercial6 min read

Professional fees and contingency in a development appraisal

Fees and contingency look like small lines in an appraisal and move the residual land value a long way. Both are tested, and both are defended with scope documents rather than convention.

Read article →
Viability, Obligations and Commercial7 min read

Transport contributions and the trip based calculation

Highway authorities build sustainable transport contributions from trip rates and mode share. Understanding how the figure is assembled is the only way to test whether it meets the statutory tests.

Read article →