Finance costs and the interest assumption in an appraisal
Finance moves more when you change the model than when you change the rate. Evidencing the debit rate, splitting the fees and showing finance is counted once.
Finance is the line in a viability appraisal that moves most when you change how you model it rather than what you assume. A crude calculation charging interest on every cost for the whole development period will produce a finance figure well above a properly phased cash flow on the same inputs and the same rate. Reviewers know that, so finance costs in a viability appraisal attract two questions: what rate, and over what profile.
Both answers have to be evidenced. Neither is a matter of convention.
How finance is modelled in a residual appraisal
There are two methods in common use, and the appraisal should say which it has adopted.
The simple method applies an interest rate to the total development cost over a stated period, often with a factor to reflect that not all costs are incurred at the start. It is quick, it is transparent, and it overstates finance on anything other than a very short programme.
The cash flow method models expenditure and receipts by period: land and acquisition costs at the outset, construction drawn against an S-curve, professional fees front-loaded, contributions at their trigger points, and sales receipts as units complete. Interest is calculated on the outstanding balance each period and rolled up.
On schemes of any size the cash flow is the method to use, and most reviewers expect it. If you use the simple method on a scheme running more than a couple of years, expect to be asked to produce a cash flow anyway.
Choosing the debit rate and evidencing it
The rate is the input applicants most often assert and least often support.
Development finance is normally priced as a margin over a published reference rate, and sterling facilities now reference SONIA following the withdrawal of LIBOR for new sterling lending. So the appraisal should state the reference rate assumed, the margin, and the resulting all-in rate, rather than a single blended number with no components.
Three forms of evidence carry weight:
- A term sheet or indicative offer from a lender for this scheme, redacted if necessary.
- Terms achieved on comparable recent schemes by the same borrower, with dates.
- Published market commentary on development finance pricing for schemes of this size and type, cited with its date.
Where the scheme is to be funded from equity, say so and explain the basis for the rate used, because an appraisal that charges a debt rate on money nobody is borrowing invites a reduction. The usual answer is an opportunity cost argument, and it is a reasonable one provided it is made openly.
Keep the rate consistent with the programme. A short bridge priced for twelve months is not evidence for a thirty-month facility.
Arrangement, exit and monitoring fees
The facility costs more than its interest, and these items are legitimate when itemised.
| Item | Typical basis |
|---|---|
| Arrangement fee | Percentage of the facility, paid on drawdown |
| Exit fee | Percentage of the facility or of gross development value |
| Commitment fee | Percentage on the undrawn balance |
| Monitoring surveyor | Fixed sum per drawdown or a monthly fee |
| Lender's legal and valuation costs | Fixed sums, paid at the outset |
State each as a rate with a basis, and apply it at the right point in the cash flow. An arrangement fee charged at the start accrues interest for the whole period, which is the correct treatment and one that reviewers rarely dispute when it is shown explicitly.
What they do dispute is a single composite finance percentage covering interest and fees together. Split them.
Cash flow timing and the drawdown profile
The profile matters as much as the rate, and it is where an appraisal is most easily tested.
Four assumptions drive the answer. The point at which land is acquired, because land interest accrues for longest. The construction drawdown curve, which for most residential schemes is slower at the start and end than a straight line. The sales rate, which determines when receipts begin to reduce the outstanding balance. And the period between practical completion and the final sale, which is often understated.
Illustrative example: a 36-unit scheme with a 24 month build and sales at four units a month from month 18. Modelled as a straight line drawdown with all receipts at the end, finance comes out materially higher than a profile with an S-curve and phased receipts. Nothing about the scheme has changed. If the appraisal supports a lower affordable housing offer on the back of the first profile, the reviewer will say the difference is modelling rather than viability.
Be careful about a related point: interest on land held before the planning application. A reviewer will usually resist carrying finance cost for a holding period that reflects the applicant's acquisition decision rather than the development programme.
Where finance is double counted in profit
This is the argument worth understanding, because it cuts both ways.
The developer return in an appraisal compensates for risk. Where that return has been calibrated from schemes funded with debt, and the appraisal then charges finance separately, part of the same risk is being paid for twice. Where the return has been derived on an ungeared basis, charging finance separately is correct.
National viability guidance refers to a return in the region of 15 to 20 per cent of gross development value as a starting point for plan making, while accepting that a different figure may be appropriate in particular circumstances. It does not resolve the gearing question for you.
The defensible position is to state the basis of the return explicitly: whether it is a return on gross development value or on cost, and whether it is geared or ungeared. Then show that finance is counted once. An appraisal that says this in two sentences removes an argument that otherwise runs for two rounds of correspondence.
Sensitivity on the rate
Run the appraisal at the base rate assumption and at a range above and below it, and present the effect on the residual.
Sensitivity does two things for you. It shows the reviewer what the disagreement is actually worth, which often turns out to be less than the argument costs. And it supports a review mechanism: where a plausible range of finance rates moves the affordable housing offer by a unit or two, a late-stage review clause is a more sensible answer than fixing a number now.
Present it as a short table with the rate on one axis and the policy outcome on the other, not as a paragraph of prose. Officers writing committee reports use tables.
Where the sensitivity shows the obligation cannot be met under any reasonable assumption, the mechanisms in renegotiating obligations on a stalled scheme and in phasing a permission to spread the levy liability are the next places to look, since both change the cash flow rather than the appraisal inputs.
A Viability Assessment is a report councils expect from a suitably qualified author, and professional review is strongly advised before submission. Keep the finance figures identical across the appraisal, the assessment narrative and the Affordable Housing Statement, because a mismatch between those three documents is the quickest way to lose a reviewer's confidence.
PlanScope drafts the narrative and policy sections around your surveyor's numbers, and flags where a site-specific figure is still missing rather than inventing one. You can see which reports your scheme is likely to need before you commission anything.
This is general guidance, not legal, valuation or financial advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
Should I use a simple interest calculation or a cash flow?
A cash flow on anything beyond a very short programme. Applying one rate to all costs for the whole period overstates finance, sometimes substantially. Model land at the outset, construction against an S-curve, fees front-loaded and receipts as units complete, with interest calculated on the outstanding balance each period.
How do I evidence the debit rate?
State the reference rate, the margin and the resulting all-in rate separately. Support it with an indicative lender term sheet for this scheme, terms achieved on comparable recent schemes with dates, or dated published commentary on development finance pricing for schemes of this size. A single asserted percentage will be reduced.
What if the scheme is equity funded?
Say so, and explain the basis for any rate you charge. An opportunity cost argument is reasonable when made openly, but charging a debt rate on money nobody is borrowing without explanation invites the reviewer to strip the line out. Keep the assumed period consistent with the development programme.
Which finance fees are accepted?
Arrangement fee, exit fee, a commitment fee on the undrawn balance, monitoring surveyor fees and the lender's legal and valuation costs, each stated as a rate with a basis and applied at the right point in the cash flow. What reviewers dispute is a single composite finance percentage that rolls interest and fees together.
Is finance double counted in the profit margin?
It can be. A developer return calibrated from geared schemes already compensates for finance risk, so charging finance separately pays for part of it twice. State whether the return is on gross development value or on cost, and whether it is geared or ungeared, then show finance is counted once.
How much sensitivity testing is enough?
Enough to show what the disagreement is worth. Run the appraisal at your base rate and at a range above and below it, and present the effect on the policy outcome in a short table. Where the range moves the affordable offer by a unit or two, propose a late-stage review clause instead.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.