Viability, Obligations and Commercial

Levy charged on a mezzanine insertion

6 min readBy PlanScope Editorial Team

Most mezzanines are internal works outside the definition of development. Where section 55(2A) catches a retail insertion, how gross internal area is measured, and why the existing buildings deduction usually does not apply.

A mezzanine inserted into an existing building attracts community infrastructure levy only where it needs planning permission in the first place, and most mezzanines do not. Internal works that affect only the interior of a building are generally outside the definition of development. The exception matters to retailers: section 55(2A) of the Town and Country Planning Act 1990 makes the insertion of a mezzanine into a building used for retail purposes development where the floorspace created exceeds 200 m². Cross that line and you need permission, and once you have permission the levy follows the new floorspace.

When a mezzanine needs permission at all

Start with section 55. Works for the alteration of a building that affect only its interior, and do not materially affect its external appearance, are not development. A mezzanine in a warehouse, a workshop or an office therefore usually needs no application.

Three situations take you outside that position:

  • Retail premises, where section 55(2A) catches a mezzanine creating more than 200 m² of floorspace.
  • Any insertion involving external change, such as new windows, a new door, a rooflight or a plant enclosure.
  • A mezzanine that in substance changes the use of the building or intensifies it to a materially different degree, which is a question of fact and degree rather than of floor area.

A condition on the existing permission can also require permission for internal alterations, and some older industrial consents do exactly that. Read the conditions on the permission that authorised the building before concluding that nothing is needed.

Building regulations are a separate matter. A mezzanine is building work whether or not planning permission is required, with structural, means of escape and fire protection implications, and approval under the building regulations is not evidence that planning permission was unnecessary.

How gross internal area is measured for a mezzanine

The levy is calculated on gross internal area, and a mezzanine counts as floorspace. Measurement follows the convention the charging authority applies, which is normally the gross internal area definition used by the surveying profession: measured to the internal face of the enclosing walls, including internal structure, columns and stairs.

For a mezzanine the measurement points that cause argument are the open edge, the stair, and any void. Measure to the edge of the structural deck, include the stair on the level it serves, and exclude the void that the mezzanine does not cover. Then show the calculation on a drawing rather than stating a figure.

That drawing is worth more than it costs. A measured plan with the mezzanine area hatched and the figure annotated resolves most liability disputes in one exchange.

Whether the levy follows the permission

Liability attaches to a chargeable development, which arises from a planning permission or from development permitted by a general consent where a notice of chargeable development has been served. No permission and no notice means no chargeable development.

Where permission is granted, the levy is charged on the new floorspace at the rate in the authority's charging schedule for that use, indexed as the regulations require. The rate for retail differs from the rate for other uses in most schedules, so check which rate the authority has applied.

The exemption for minor development sits in the regulations and removes liability where the chargeable development is less than 100 m² of new build floorspace, unless it comprises one or more dwellings. For retail mezzanines that exemption rarely helps, because the 200 m² threshold that triggers the need for permission is already above it. For a non retail mezzanine granted permission for some other reason, the exemption may well apply.

Existing floorspace deductions on an insertion

The deduction for existing buildings is the part occupiers expect to save them and often does not.

The regulations reduce the chargeable amount by the floorspace of retained parts of in use buildings, where the building has been in lawful use for a continuous period of at least six months within the three years before the day permission first permits the development. On a conversion or a redevelopment that deduction is substantial.

On a mezzanine insertion it usually is not, because the chargeable development is the mezzanine, and the existing floorspace below it is not part of that chargeable development. The result is a charge on the full mezzanine area even though the building itself is unchanged. Check how the authority has described the chargeable development on the liability notice, because the answer turns on the terms of the permission and the way the application was described.

Keep the occupation evidence anyway. Leases, business rates records and utility accounts establish lawful use, and they are needed for any later application affecting the same building.

Evidence of the measured area

Document What it establishes
Measured plan of the existing building The baseline floorspace and its measurement convention
Mezzanine plan with the area annotated The new floorspace claimed, open edges and stair included
Section through the mezzanine Head heights above and below, which affect usable area
Evidence of lawful use Occupation for at least six months in the previous three years
Schedule reconciling planning and rating areas Why two figures differ, where they do

Produce that set once and keep it. Occupiers who cannot evidence their existing floorspace end up accepting the authority's figure, and the authority's figure is usually taken from the application drawings rather than from a measured survey.

Building control against planning measurement

Floor areas recorded for building regulations, for rating and for the levy are measured on different conventions, and the figures legitimately differ. Rating assessments use their own basis, building control is concerned with the works rather than with an area figure, and the levy uses gross internal area.

So do not reconcile them by picking the lowest. Explain the difference in a short schedule, state the convention used for each figure, and give the authority the gross internal area calculation it needs. An unexplained discrepancy between the rating record and the application drawing is the kind of thing that turns a routine liability notice into a review.

Checking the liability notice calculation

Four checks, in the week the notice arrives:

  1. The measured floorspace, against your own annotated drawing.
  2. The rate applied, against the published charging schedule for that use category.
  3. The indexation figure, against the index published for the relevant year.
  4. Any deduction claimed or refused, with the reasoning stated.

Where something is wrong, the first step is a request for a review of the chargeable amount by the collecting authority, within the short period the regulations allow after the notice is issued. An appeal to the Valuation Office Agency follows if the review does not resolve it. The deadlines are measured in days, so diarise them on the day the notice arrives.

Where a larger scheme is involved and the timing of payment matters more than the amount, phasing a permission to spread the levy liability is the mechanism to consider. And where additional retail floorspace is created at a scale that engages town centre policy, the authority may also want the trade impact assessed, which brings in a retail impact assessment and the trade draw methodology behind it.

To see which documents a mezzanine application is likely to need, enter your postcode on PlanScope and answer the guided questions on existing use and floorspace.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. This is general guidance, not legal advice; check the position with your local planning authority before relying on it.

Frequently asked questions

Does a mezzanine need planning permission?

Usually not. Works affecting only the interior of a building, without materially affecting its external appearance, fall outside the definition of development. The main exception is retail: section 55(2A) of the Town and Country Planning Act 1990 makes a mezzanine creating more than 200 m² of floorspace in a retail building development requiring permission.

Is the community infrastructure levy payable on a mezzanine?

Only where there is a chargeable development, which requires a planning permission or a notice of chargeable development for development permitted by a general consent. Where permission is granted, the levy applies to the new floorspace at the charging schedule rate for that use, indexed as the regulations require.

Does the minor development exemption help?

It removes liability where the chargeable development is less than 100 m² of new build floorspace and contains no dwellings. For retail mezzanines it rarely assists, because the 200 m² threshold that triggers the need for permission is already above the exemption. For a non retail mezzanine it may well apply.

Can I deduct the existing building floorspace?

Usually not on an insertion. The deduction applies to retained parts of in use buildings forming part of the chargeable development, and the floorspace below a mezzanine is not part of it. Check how the authority has described the chargeable development on the liability notice, since the answer turns on the permission.

How do I challenge the floorspace figure on a liability notice?

Request a review of the chargeable amount by the collecting authority within the short period the regulations allow after the notice is issued, with your own measured and annotated plan attached. If the review does not resolve it, an appeal lies to the Valuation Office Agency. The deadlines are measured in days.

Sources and further reading

community infrastructure levymezzanineretailfloorspacecommercial occupiers

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Viability, Obligations and Commercial

View all →
Viability, Obligations and Commercial6 min read

Professional fees and contingency in a development appraisal

Fees and contingency look like small lines in an appraisal and move the residual land value a long way. Both are tested, and both are defended with scope documents rather than convention.

Read article →
Viability, Obligations and Commercial7 min read

Transport contributions and the trip based calculation

Highway authorities build sustainable transport contributions from trip rates and mode share. Understanding how the figure is assembled is the only way to test whether it meets the statutory tests.

Read article →
Viability, Obligations and Commercial6 min read

Affordable housing on a site with a demolition credit

Twelve houses replacing four is twelve gross and eight net. Whether the threshold and percentage are read gross or net can be the whole margin, and the levy applies a separate floorspace test with its own timing trap.

Read article →
Viability, Obligations and Commercial6 min read

Nutrient neutrality mitigation cost in a viability appraisal

In an affected catchment, nutrient mitigation is a condition of consent rather than an enhancement. Price it per dwelling with a dated quotation, and model the securing obligation and the programme delay alongside it.

Read article →
Viability, Obligations and Commercial6 min read

Finance costs and the interest assumption in an appraisal

Finance moves more when you change the model than when you change the rate. Evidencing the debit rate, splitting the fees and showing finance is counted once.

Read article →
Viability, Obligations and Commercial7 min read

Open space and play contributions calculated per bedroom

A per-bedroom contribution is really an occupancy calculation. Which multipliers to check, how commuted maintenance sums work, and the six arithmetic errors to look for.

Read article →