Open space and play contributions calculated per bedroom
A per-bedroom contribution is really an occupancy calculation. Which multipliers to check, how commuted maintenance sums work, and the six arithmetic errors to look for.
Most councils calculate open space and play contributions by converting your unit mix into a number of people, then applying an adopted provision standard per person, then applying a cost per square metre. An open space contribution per bedroom is therefore not really a per-bedroom charge at all. It is an occupancy calculation with the bedroom count as the input, and that is where the arithmetic goes wrong.
Check the method before you argue about the total. On a 40-unit scheme a wrong occupancy multiplier or a missing deduction for existing dwellings is worth more than most negotiations about the rate.
Where the standard comes from
The provision standard sits in the adopted local plan, usually supported by an open space assessment and a supplementary planning document. National guidance expects authorities to assess the need for open space, sport and recreation facilities and the opportunities for new provision, and the resulting standard is local rather than national.
Many standards trace back to benchmark guidance published by Fields in Trust, which recommends quantity, accessibility and quality benchmarks for outdoor sport, play and informal open space. Councils adapt those benchmarks to their own audit, so two neighbouring authorities can apply different figures to identical schemes.
For play space in London, the Mayor's policy requires 10 m² of play space per child, with child yield derived from a published calculator. That is a clearer method than most, and it repays attention even outside London because it shows how the calculation is meant to work.
Whatever the source, the obligation has to satisfy the statutory tests in the Community Infrastructure Levy Regulations 2010: necessary to make the development acceptable in planning terms, directly related to the development, and fairly and reasonably related in scale and kind. A contribution calculated by formula still has to meet those tests on your scheme.
Occupancy assumptions by bedroom count
The multiplier converts dwellings into people, and it is normally derived from census household size data for the authority's area, applied by number of bedrooms.
Illustrative example, using figures of the kind councils adopt rather than any particular authority's published standard: one bedroom 1.4 persons, two bedrooms 2.0, three bedrooms 2.8, four or more bedrooms 3.4. A scheme of 10 one-bed flats, 20 two-beds and 10 three-beds then yields 14 plus 40 plus 28, or 82 people. Apply an adopted standard of, say, 2.4 hectares of open space per 1,000 population and the requirement is 0.197 hectares, which is then converted into a sum at the adopted cost per hectare.
Three points to check against the adopted document.
- Whether the multipliers are per bedroom or per bedspace, because some standards count bedspaces and a two-bedroom four-person flat is then counted differently from a two-bedroom three-person flat.
- Whether affordable units carry the same multiplier, since some authorities apply a higher occupancy to affordable housing based on their own tenancy data.
- Whether the standard applies to the whole development or to the net increase in population.
That last one is the error worth looking for first. Where you are replacing four existing dwellings with twenty, the contribution should normally be calculated on the net additional population, and a formula applied to the gross figure overstates it by the occupancy of the four units being lost.
On-site provision against a payment
Policy usually requires on-site provision above a threshold and a payment below it, and the threshold is where the negotiation sits.
On-site provision has a land cost and a maintenance liability, and it has to be usable: a strip of amenity grass between a footpath and a boundary fence meets a quantity standard and fails a quality one. Councils increasingly apply accessibility and quality benchmarks as well as quantity, so provision that cannot be reached safely by children from the far end of the scheme may not count.
A payment has the advantage of certainty and the disadvantage that you lose control of where the money goes. Ask three questions before agreeing one:
- Which specific project will the money be spent on, and is it identified in an infrastructure list or a plan?
- What is the spending period, and does the agreement provide for repayment if the money is unspent?
- Is the sum indexed, and against which published index?
Repayment clauses are standard and worth insisting on. A ten-year spending period with repayment of unspent sums plus interest is a reasonable position and most authorities accept it.
Maintenance sums and commuted periods
Where open space is provided on site, somebody has to maintain it for the life of the development, and there are three routes.
| Route | Mechanism | Watch for |
|---|---|---|
| Transfer to the council with a commuted sum | Freehold transfer plus a capitalised maintenance payment | The length of the commuted period and the yield used to capitalise |
| Management company | Service charge on residents | Council resistance where the charge is high, and adoption fallback wording |
| Parish or town council transfer | Local agreement | Capacity to maintain, and a longer commuted period |
Commuted periods commonly run between ten and twenty-five years and the figure is a matter of local policy rather than law. The sum is usually an annual maintenance cost multiplied by the period, sometimes discounted to present value and sometimes not. Ask which, because the difference on a long period is material.
Where a management company is proposed, expect the agreement to require a fallback allowing the council to adopt if the company fails, and expect the service charge level to be scrutinised as part of the affordable housing discussion.
Where provision is already adequate
The statutory tests cut both ways. If the authority's own open space audit shows a surplus in the relevant typology within the relevant catchment, a contribution towards new provision may not be necessary to make the development acceptable.
This argument works when it is made with the council's own evidence. Quote the audit, the typology, the catchment and the surplus figure, then explain why the development does not create a deficiency. It fails when it is made as an assertion that there is plenty of green space nearby.
A better version of the same argument asks for the money to be directed to qualitative improvement of an existing space rather than to new provision, which usually satisfies everybody. An Open Space Assessment and a Play Space Assessment are the documents that carry that case, and they should engage with the authority's audit rather than restating national benchmarks.
Checking the arithmetic
Ask for the calculation in writing and work through it line by line. The errors that recur:
- Gross rather than net population, with no deduction for existing dwellings.
- Children counted twice, once in the open space requirement and again in the play space requirement, where the adopted standard treats play as a component of open space.
- A per-dwelling rate applied alongside a per-person rate for the same typology.
- Indexation applied from the wrong base date, or to a figure that is already indexed.
- VAT added to a contribution where the adopted cost already includes it.
- Student accommodation, older persons housing or houses in multiple occupation treated with the standard family multipliers.
Put the corrected calculation in a table in your response and ask the officer to confirm it. Most of these are arithmetic rather than policy disagreements, and officers correct them readily when the error is shown rather than alleged.
Where the total remains unaffordable against the appraisal, the mechanisms in affordable housing cascade mechanisms in a section 106 agreement and the boundary questions in section 278 agreements and where a section 106 starts are the next places to look.
PlanScope drafts the open space and play space evidence alongside the rest of the application pack, and you can see which of the 66 report types your scheme is likely to need before you commission anything.
This is general guidance, not legal advice; standards, multipliers and costs are set locally and change, so check the adopted local plan and supplementary guidance for your authority before relying on any figure here. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
How is an open space contribution calculated?
The unit mix is converted into a population using occupancy multipliers by bedroom count, the adopted provision standard is applied per thousand population, and the resulting area is converted into a sum at an adopted cost rate. The multipliers and the standard are local, so two neighbouring authorities can produce different totals.
Should the contribution be based on gross or net population?
Normally the net increase. Where existing dwellings are being replaced, the occupancy of the units being lost should be deducted, and a formula applied to the gross figure overstates the requirement. This is the first error to check on any redevelopment site, and officers usually correct it once it is shown.
Can I refuse to pay where there is enough open space nearby?
You can argue it, using the council's own audit. Quote the typology, the catchment and the recorded surplus, then explain why the development creates no deficiency. The argument fails as an assertion. A better version asks for the money to be directed to qualitative improvement of an existing space instead.
How are maintenance sums calculated?
Usually an annual maintenance cost multiplied by a commuted period, commonly between ten and twenty-five years, sometimes discounted to present value and sometimes not. Ask which, because on a long period the difference is material, and ask what yield has been used if a discount is applied.
What tests does the obligation have to meet?
Those in the Community Infrastructure Levy Regulations 2010: the obligation must be necessary to make the development acceptable in planning terms, directly related to the development, and fairly and reasonably related in scale and kind. A contribution produced by a formula still has to satisfy those tests on your particular scheme.
Should the agreement include a repayment clause?
Yes, and most authorities accept one. A defined spending period, typically around ten years, with repayment of any unspent sum plus interest, protects you where the identified project does not proceed. Ask which specific project the money is for and whether it appears in an infrastructure list or plan.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.