Permitted Development

Adding a second extension when one already exists

7 min readBy PlanScope Editorial Team

Class A measures everything from the original dwellinghouse, so an extension built in 1998 has already used part of your allowance. How to work out what is left.

A second extension under permitted development is possible, but the allowance is cumulative. Class A of Part 1 of Schedule 2 to the General Permitted Development Order 2015 measures everything from the original dwellinghouse, which means the extension your predecessor built in 1998 has already used part of what you were hoping to use now. Nobody gets a fresh allowance on completion.

The practical result is that most houses with a rear extension already in place have little or no single storey rear depth left, and a good number have no permitted development rights at all because the garden has filled up with buildings.

The allowance is measured from the original house

Original dwellinghouse has a specific meaning in the Order. It is the house as it stood on 1 July 1948, or as it was first built if that was later. Everything added since is an enlargement, whoever added it.

So the depth limits are measured from the rear wall of that original house, not from the back of the existing extension. For a single storey rear extension the limit is 4 m beyond the original rear wall for a detached house and 3 m for anything else, with a maximum height of 4 m. For an extension of more than one storey it is 3 m beyond the original rear wall, and it must not come within 7 m of the boundary opposite that wall.

Element Detached house Semi-detached or terraced
Single storey rear depth from original rear wall 4 m 3 m
Single storey rear depth under prior approval 8 m 6 m
More than one storey, rear depth 3 m 3 m
Maximum height, single storey rear 4 m 4 m
Eaves height within 2 m of a boundary 3 m 3 m

If a 3 m single storey extension was built on a semi in 2001, the 3 m is gone. A further 1 m conservatory on the back of it needs an application, however modest it looks.

What previous owners did counts against you

Permitted development rights attach to the building, not to the person who owns it. There is no reset on sale, no reset on a change of use and back, and no reset because the earlier work was done under a planning permission rather than under permitted development.

This surprises people, and it is the single most common reason a householder project goes wrong. The homeowner measures from the back of their kitchen, builds 3 m, and receives an enforcement enquiry because the original rear wall was 3 m further forward than they assumed.

Work from the oldest plan you can find rather than from what is there. And if you cannot establish where the original rear wall was, treat that as the question to answer before you commission any design work.

Conservatories and glazed additions are extensions too

A conservatory is an extension for the purposes of Class A. There is no exemption for glazed additions, no exemption for a lean-to, and no exemption for something built without Building Regulations approval.

The confusion comes from Building Regulations, where conservatories below a certain floor area with separating doors are exempt from parts of the regime. That exemption has nothing to do with planning. A 12 m² conservatory added in 1996 counts against the depth allowance and against the curtilage coverage in exactly the same way as a brick extension.

The same goes for an attached garage, a utility lean-to, a porch beyond the permitted porch limits, and an infilled side return. If it enlarged the building, it counts.

The 50 per cent curtilage test runs alongside the depth limits

Class A also stops permitted development where the total area of ground covered by buildings within the curtilage, other than the original dwellinghouse, would exceed 50 per cent of the curtilage area.

Read that carefully, because it catches the garden rather than the house. Every building within the curtilage counts: the garage, the shed, the garden office, the greenhouse, the bin store with a roof on it. A large garden room built under Class E can leave a house with depth allowance on paper and no coverage allowance in practice.

The curtilage for this calculation is the curtilage as it existed on 1 July 1948, or when the house was built if later, which matters on plots that have been extended by buying a strip from a neighbour. Land added later does not enlarge the denominator.

So the calculation has two independent tests and failing either one takes the project out of permitted development. Depth from the original rear wall. Coverage across the original curtilage. Both have to pass.

Working out what is left

Do this in order, and write the numbers down:

  1. Establish the footprint and the rear wall position of the original dwellinghouse from the earliest plan available.
  2. Measure every addition since, with dates where you can, and mark them on a copy of that plan.
  3. Calculate the remaining rear depth as the limit for your house type minus the deepest existing projection from the original rear wall.
  4. Measure the original curtilage area, then the ground area covered by all buildings other than the original house, and check the 50 per cent test.
  5. Check the side wall position, since an extension beyond a side wall must be single storey, no more than 4 m high and no wider than half the width of the original house.
  6. Check whether the property is on designated land or subject to an Article 4 direction, which removes or narrows these rights. Our note on permitted development limits in a conservation area covers what changes.

Where the figures come out close to a limit, the margin is not yours to take. A surveyor measuring to the nearest 50 mm is worth the fee.

Finding evidence of the earlier work

The council's online planning register is the first stop, though coverage of older decisions varies and pre-1990 records are often not digitised. Beyond that, historic Ordnance Survey mapping shows building footprints at successive dates, aerial imagery is useful for the period since the 1990s, and title deeds sometimes attach a plan showing the house as it was when the plot was first sold.

Building Regulations completion certificates held by the council or by a previous owner date the work even where there was no planning application. So do old mortgage valuations and estate agents' particulars, which people keep more often than you would expect.

Be careful with online constraint and history layers. They are convenient, they are not complete, and relying on an absence of a record as proof that nothing was built is a mistake, as set out in checking planning data sources before relying on a right.

When the allowance is spent

Two routes remain. The prior approval procedure in Class A allows a single storey rear extension up to 8 m on a detached house or 6 m otherwise, subject to a neighbour consultation exercise run by the council. It is still measured from the original rear wall, so a previous 3 m extension reduces what the prior approval can deliver.

Otherwise you need a householder planning application. That is not a worse outcome in every case. An application lets you exceed the depth limits, build two storeys where the 7 m boundary rule would have stopped you, and design to the site rather than to the Order. Expect the council to apply a daylight test such as the 45 degree line from neighbouring windows, and to look at the effect on the rear garden proportion.

If you want certainty before building, apply for a certificate of lawfulness of proposed use or development under section 192 of the Town and Country Planning Act 1990. It is the only formal way to confirm that what you intend is permitted development, and it costs far less than removing a built extension. Where an application is the route, a short Planning Statement setting out the design response and the neighbour position does more than a covering letter.

Upward extensions are a separate set of rights with their own limits, covered in upward extensions under Class AA and Class AB.

Enter your postcode on PlanScope to see which documents a householder application for your site would need.

This is general guidance, not legal advice. A certificate of lawful development is the only formal way to confirm that works are lawful, so check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Does a previous owner's extension use up my permitted development rights?

Yes. Permitted development rights attach to the building rather than the owner, so there is no reset on sale. The depth limits in Class A are measured from the rear wall of the original dwellinghouse, meaning the house as it stood on 1 July 1948 or as first built if later, whoever added to it since.

Does a conservatory count towards the extension allowance?

Yes. A conservatory is an enlargement of the dwellinghouse for the purposes of Class A, with no exemption for glazed additions. The partial exemption that applies to some conservatories under Building Regulations has no bearing on planning, so a conservatory counts against both the depth limit and the curtilage coverage test.

How does the 50 per cent garden rule work?

Class A is not available where buildings within the curtilage, other than the original dwellinghouse, would cover more than 50 per cent of the curtilage area. Garages, sheds, garden rooms and greenhouses all count. The curtilage used is the one existing in 1948 or at first construction, so land bought later does not help.

How do I find out how deep the original house was?

Start with the council's online planning register, then historic Ordnance Survey mapping, aerial imagery from the 1990s onwards, title deed plans, Building Regulations completion certificates and old estate agents' particulars. Treat the absence of a record as unproven rather than as evidence that nothing was built.

What can I do once the allowance is used up?

Either the prior approval route in Class A, which allows a single storey rear extension up to 8 m detached or 6 m otherwise but is still measured from the original rear wall, or a householder planning application. An application lets you exceed the limits and design to the site rather than to the Order.

Sources and further reading

permitted developmentextensionsclass ahouseholdergpdoconservatory

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Permitted Development

View all →
Permitted Development7 min read

Enclosing a carport or open porch under Class A

Whether a carport infill is permitted development depends on where it sits relative to the principal elevation. Porches have their own class with more generous limits.

Read article →
Permitted Development7 min read

A householder extension built over a public sewer

Permitted development rights say nothing about drains. If a public sewer runs under the garden, the water company has a separate say, and foundations are the expensive part.

Read article →
Permitted Development7 min read

Extending a home created by a commercial conversion

A dwelling created by prior approval does not automatically arrive with householder permitted development rights. Flats have none, and the date tests run from when the building was built.

Read article →
Permitted Development9 min read

Permitted development where an earlier permission conditions the site

A rear extension can sit well within Class A and still be unlawful, because a condition on the permission that created the house says otherwise. How Article 3(4) works in practice.

Read article →
Permitted Development8 min read

Agricultural prior approval refused on siting or design

Under Part 6 the council can only refuse the siting, design and external appearance you proposed. The permitted development right survives, so a revised set of details usually beats an appeal.

Read article →
Permitted Development7 min read

Hard standing, plant and storage at an industrial unit

Part 7 of Schedule 2 covers hard surfaces, plant and private ways at industrial premises. Article 3(4) removes those rights where the original permission carries a condition, which is where most disputes begin.

Read article →