Costs, Fees and Budgeting

What a biodiversity net gain shortfall costs in credits

6 min readBy PlanScope Editorial Team

Where a scheme cannot deliver its 10 per cent gain on site or off site, statutory credits fill the gap at a published tiered price set deliberately high. The hierarchy, the rounding and the 30 year obligation all affect the budget.

Statutory biodiversity credits are the last resort in the biodiversity net gain system, and they are priced to be exactly that. Where a development cannot deliver its 10 per cent gain on site and cannot find off-site units, the developer buys credits from the government at a published, tiered price that sits deliberately above what the open market charges. Budgeting for a biodiversity net gain shortfall therefore starts with the question of why you are in the credit tier at all, because almost every other route costs less.

The price schedule changes. The structure does not.

The hierarchy before credits are reached

The Environment Act 2021 inserted Schedule 7A into the Town and Country Planning Act 1990 and attaches a biodiversity gain condition to most planning permissions in England. The scheme became mandatory for major development on 12 February 2024 and for small sites on 2 April 2024.

The gain must be delivered in a set order. On-site habitat creation and enhancement first. Then registered off-site gains, whether on land the developer controls or units bought from a habitat bank. Statutory credits only where the first two are not possible.

That order is not advisory. The local planning authority approves the biodiversity gain plan, and a plan that jumps to credits without evidencing why on-site and off-site delivery were ruled out will be refused. Expect to show the on-site options tested, the layout iterations, and a record of the off-site market enquiries made and why they failed.

The statutory metric is the arithmetic behind all of it, and the Environment Act 2021 regime expects it to be completed by a competent person. A PlanScope Biodiversity Net Gain Assessment draft is a starting point for that person, never a substitute for them.

On-site, off-site and statutory credits

The three routes behave differently in a cash flow, which matters more than the headline rate.

Route What you pay for When you pay
On-site Design, planting, establishment, 30 years of management and monitoring Spread across the build and the management period
Off-site units Purchase of registered units, plus legal and registration costs Largely up front, before the gain plan is approved
Statutory credits Credits at the published tier price Before development starts, to the Secretary of State

On-site delivery looks the lowest cost per unit and often is, but it takes developable area out of the scheme, so the real cost is the land value foregone. On a tight urban site that figure can exceed the credit price, which is the honest reason some schemes go off site even when on-site delivery is technically possible.

Off-site units carry a discount you have to model. The metric applies a spatial risk multiplier, so units delivered outside the local planning authority area or the relevant National Character Area count for less than the same habitat delivered close to the development. Buying distant units means buying more of them.

How the statutory credit price is set

Defra publishes a price per credit, tiered by the distinctiveness of the habitat being replaced. Low distinctiveness grassland sits in the lowest tier. High distinctiveness habitat sits several multiples higher, and watercourse units are priced separately from area units again.

Two mechanical points catch people out. You buy credits of the tier matching the habitat lost, so a scheme that takes out a species-rich hedgerow or a stretch of ditch cannot settle it with the lowest-tier price. And credits are sold in whole units, with the shortfall rounded up, so a deficit of 0.2 units costs a full unit.

Prices are reviewed, so quote the current schedule on gov.uk at the date of the appraisal and say in the appraisal that you have done so. Carrying last year's figure into a land bid is how a scheme loses its margin quietly.

Why credits are deliberately expensive

The pricing is policy, not a market rate. Government set credit prices above the expected cost of equivalent off-site units so that the credit route stays unattractive and the money flows into habitat creation through the market instead. The receipts fund habitat creation by Natural England rather than delivering a specific site for your development.

So a developer who treats credits as a convenient fixed price and skips the off-site search is paying a premium for convenience, and may still find the authority refuses the gain plan for failing the hierarchy.

There is one honest case for credits: a small, time-critical shortfall on a scheme where the off-site market in that area has nothing registered. Say that plainly in the gain plan, with the enquiries evidenced.

Habitat banks and market units

The off-site market works through registered gain sites. A landowner creates or enhances habitat, secures it for at least 30 years by a section 106 agreement or a conservation covenant, registers it on the biodiversity gain sites register, and sells the units allocated to it.

Costs to budget beyond the unit price: the registration fee charged for entering a gain site or allocating units, the broker or intermediary fee where one is used, legal fees on the allocation agreement, and your ecologist's time checking that the units being sold actually match the habitat type and condition your metric requires.

That last check is the one that gets skipped. A purchase of medium distinctiveness units will not discharge a high distinctiveness deficit, and discovering that after exchange is expensive.

Budgeting the thirty year management obligation

Whichever route you take, something is secured for 30 years, and the cost of that obligation is not in the unit price if you are delivering on site.

Build a line for annual management, periodic monitoring reports at the intervals the gain plan sets, remedial works where condition targets are missed, and the cost of the legal mechanism itself. Many authorities also charge a monitoring fee under the section 106 agreement.

Treat the on-site option as a 30 year liability on the land rather than a one-off landscaping item, and the comparison with off-site units looks different. On a small housing scheme the management and monitoring tail is frequently the deciding factor.

A Preliminary Ecological Appraisal at the right point in the design, before the layout is fixed, is the lowest cost intervention available, because it tells you what the baseline is while the plan can still move. Note that the pre-development baseline is assessed as at the habitat's condition before any degradation, so clearing a site to improve the score does the opposite.

Checking the current price schedule

Three things to verify at the date of your appraisal rather than from memory: the current statutory credit prices by tier on gov.uk, the current version of the statutory metric, and the registration and allocation fees for gain sites.

Also confirm whether your scheme is exempt. Householder applications, de minimis development below the stated habitat thresholds, and self-build and custom housebuilding within the stated limits sit outside the requirement, and the exemption tests are specific enough to be specific enough to read rather than assume.

For a comparable piece of catchment maths on a different constraint, see the note on budgeting nutrient neutrality mitigation. To see where the ecology documents sit against the rest of an application pack, browse the 66 report types, and PlanScope pricing sets out what a draft costs before professional review.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required, and this is general guidance rather than legal advice.

Frequently asked questions

When can a developer buy statutory biodiversity credits?

Only as a last resort. The hierarchy under Schedule 7A to the Town and Country Planning Act 1990 requires on-site delivery first, then registered off-site gains, with statutory credits available where neither is possible. The biodiversity gain plan must evidence the on-site options tested and the off-site enquiries made.

How is the statutory credit price decided?

Defra publishes a price per credit tiered by the distinctiveness of the habitat being replaced, with watercourse units priced separately from area units. Prices are set above the expected cost of equivalent off-site units so the credit route stays a last resort. Check the current schedule on gov.uk at the date of your appraisal.

Does buying off-site units far away cost more?

Yes, in effect. The statutory metric applies a spatial risk multiplier, so units delivered outside the local planning authority area or the relevant National Character Area count for less than the same habitat close to the development. A distant purchase means buying more units to close the same deficit.

What does the 30 year obligation add to the cost?

Annual management, periodic monitoring reports, remedial works where condition targets are missed, the legal cost of the section 106 agreement or conservation covenant, and often a council monitoring fee. On small housing schemes this tail frequently decides whether on-site or off-site delivery is the better choice.

Which developments are exempt from biodiversity net gain?

Householder applications, development below the stated de minimis habitat thresholds, and self-build and custom housebuilding within the stated limits are outside the requirement. The tests are specific, so read the current exemption criteria rather than assuming, and record in the application which exemption is relied on.

Sources and further reading

biodiversity net gainbng creditsenvironment act 2021costsecology

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Costs, Fees and Budgeting

View all →
Costs, Fees and Budgeting6 min read

The costs that arrive after planning permission is granted

Permission is the start of the spending, not the end. Condition discharge, verification reporting, the levy, section 278 works, Building Regulations and utility connections all arrive after the build cost is fixed.

Read article →
Costs, Fees and Budgeting7 min read

Budgeting an application for one to nine dwellings

On a minor residential scheme the evidence base and the survey seasons drive the budget, not the application fee. A stage by stage way to build the cash flow.

Read article →
Costs, Fees and Budgeting7 min read

Budgeting a variation of condition during construction

A departure from the approved drawings breaches a condition. The budget item that matters is the standing time while the amendment or section 73 application runs.

Read article →
Costs, Fees and Budgeting7 min read

What a local validation list adds to application cost

Two neighbouring councils can require very different documents for an identical scheme. How local validation lists are adopted and limited, which items cost most, and how to build a document budget before quoting.

Read article →
Costs, Fees and Budgeting7 min read

Section 278 highway works: the cost elements nobody budgets

Section 278 of the Highways Act 1980 lets a developer build on the public highway at its own expense, and the authority charges for everything around it. The lines that appear on real accounts and rarely on early budgets.

Read article →
Costs, Fees and Budgeting7 min read

Budgeting a planning inquiry appeal: what drives the cost

Section 78 appeals carry no fee, so an inquiry budget is professional time: topics in dispute, witnesses needed and sitting days programmed. How to price those three before instructing anyone, and how to cut them without weakening the case.

Read article →