Mayoral development orders and London referrals

7 min readBy PlanScope Editorial Team

A mayoral development order grants permission for described development with borough consent. Referral is a power to intervene in someone else's application. The two get confused constantly.

A mayoral development order is a power for the Mayor of London to grant planning permission directly for development specified in the order, with the consent of each borough whose land is affected. It is a plan-led consenting tool. It is not the same thing as the Mayor's role in referable applications, which is a power to intervene in a borough's decision on a scheme someone else has applied for. Confusing the two wastes a lot of time in London development strategy meetings.

As at 14 October 2026, the mayoral development order power sits in sections 61DA to 61DC of the Town and Country Planning Act 1990, inserted by the Localism Act 2011. The referral regime sits in the Greater London Authority Act 1999 as amended, with the categories of referable development set out in the Town and Country Planning (Mayor of London) Order 2008. Check both for amendments before relying on the detail here.

What a mayoral development order can do

An order grants permission for development described in it, on land described in it, subject to conditions and limitations the order sets out. In effect it does for a defined site what the General Permitted Development Order does nationally for defined classes.

The attraction for a developer or a public landowner is certainty ahead of a detailed scheme. An order can fix the acceptable parameters for a regeneration site, including land use mix, massing envelopes and access arrangements, so later detailed work proceeds without a fresh grant of permission. That removes the determination risk from the critical path.

The constraints are real. The Mayor cannot make an order over a borough's objection, because borough consent is a precondition. The order has to be preceded by consultation and publicity, and the environmental and habitats regimes apply to the order itself, so a site requiring assessment under the Environmental Impact Assessment Regulations 2017 has to deal with that at order stage rather than later.

Borough consent is the heart of the mechanism, and it is why take-up has been very limited since 2011.

A borough considering consent is being asked to hand over the determination of future development on land in its area. That is a political decision as much as a planning one, and it is usually easier for a borough to say that it will grant permission itself on a scheme it has negotiated. Where orders have been pursued it has generally been on land in public ownership, with a development framework already agreed, and with a borough that wanted the certainty as much as the Mayor did.

The procedural steps follow the shape of other development orders: a draft order with a statement of reasons, consultation with the boroughs, statutory consultees and the public, consideration of representations, then making the order. Anyone promoting one should expect the evidence base to look much like that for a local development order, with the assessment work front-loaded.

For a current record of which orders exist, check the Greater London Authority's own published planning information rather than relying on secondary summaries, because the position moves and the number is small enough that any list is quickly out of date.

How it differs from a referable application

The referral regime is the one almost every London developer actually meets.

Feature Mayoral development order Referable application
Who starts it The Mayor, usually at a landowner's or borough's instigation The applicant, by applying to the borough
Borough role Must consent before the order is made Determines the application, subject to mayoral powers
What it produces A standing grant of permission for described development A decision on one application
Trigger Policy need and agreement on a site The scheme meeting a category in the 2008 Order
Frequency in practice Rare Routine for larger schemes

Referral categories in the 2008 Order are defined by scale, height, floorspace and location. Development of 150 or more houses or flats falls within them, as does development above stated heights, with a lower height trigger adjacent to the River Thames than elsewhere, and floorspace thresholds that differ between central, inner and outer London. The Order has been amended, so read the current consolidated version rather than working from memory.

The Mayor's direction powers

Referral works in two stages, and the practical consequences of each differ.

At stage one the borough refers the application to the Mayor early in its consideration. The Mayor issues a stage one report setting out whether the scheme complies with the London Plan and what would need to change. The report carries no decision. It is still the most useful document an applicant on a large London scheme will receive, because it tells you what the Mayor's planning officers think before the borough has resolved anything.

At stage two, after the borough has resolved how it intends to decide, the Mayor has a short window to allow the borough to proceed, to direct refusal, or to direct that the Mayor becomes the local planning authority for the application and determines it personally. Taking over an application leads to a representation hearing in public and a mayoral decision.

Three points practitioners should hold onto. A direction to refuse ends the application, leaving appeal as the route. Taking over is used sparingly and generally where the Mayor supports a scheme a borough intends to refuse. And the stage one report is worth treating as an instruction list, because unresolved stage one issues are what stage two intervention is built on.

An illustrative example

Illustrative only. A 220-unit redevelopment of a borough-owned depot site is referable on unit numbers. The applicant engages the Greater London Authority before submission, so the stage one report raises only affordable housing tenure split and fire safety detail. Both are resolved before the borough's committee. Stage two passes without a direction. Had the borough instead resolved to refuse on density grounds against officer advice, the applicant's realistic options would have been a mayoral take-over request or an appeal, and the stage one report would have been the foundation of either.

Promoting an order for a site

If you are considering an order rather than an application, test four things before spending money.

  1. Is the land in a single or coordinated ownership, ideally public, so that the parameters can be fixed without assembling third-party agreement?
  2. Will the borough consent, and is there a political route to that consent that survives an election?
  3. Does the site have an agreed development framework or masterplan that the order can codify?
  4. Can the assessment work, including environmental and habitats assessment, be completed at order stage?

If any of those answers is no, a conventional application with a well managed pre-application process will usually get there faster. The honest position is that the order power has been available for over a decade and has been used rarely, and that tells you something about its practicality rather than about its drafting.

Where an order is viable, the saving is not in the planning fee. It is in removing determination risk from a long programme, which matters most where the development is phased over many years and the delivery entity needs certainty to raise finance. Reform proposals affecting plan-making and consenting continue to appear, and plan-making reform and emerging plans covers the moving parts that interact with this.

Risks for applicants and boroughs

For an applicant, the risks are sunk cost and inflexibility. Money spent on an order that a borough then declines to consent to is unrecoverable, and an order drafted tightly enough to be acceptable can be too tight to accommodate a market change five years later. Parameters need headroom.

For a borough, the risk is loss of control over detail and over obligations. An order can carry conditions but the section 106 position has to be dealt with separately, and securing contributions across a long phased build without a conventional agreement at each stage needs careful drafting. Levy liability also needs thinking through at the outset, because the point at which development is treated as commencing drives the paperwork, as commencement notices and the levy amendment regulations show.

For both, the biggest risk is treating the order as a shortcut. The assessment work does not disappear, it moves earlier.

PlanScope can draft the Planning Statement and the wider document set for a London scheme, structured to the London Plan and the borough's adopted policies, and you can browse the 66 report types to see what a referable application usually needs. Follow reform news on the planning law updates timeline.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. This is general guidance, not legal advice, and the position stated here is as at 14 October 2026. Check the current legislation and the London Plan with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

What is a mayoral development order?

It is an order made by the Mayor of London granting planning permission for development described in the order on land described in it, subject to conditions. The power sits in sections 61DA to 61DC of the Town and Country Planning Act 1990, inserted by the Localism Act 2011. Each affected borough must consent before the order can be made.

Which London applications are referable to the Mayor?

Those falling within the categories in the Town and Country Planning (Mayor of London) Order 2008, defined by scale, height, floorspace and location. Development of 150 or more houses or flats is caught, as is development above stated heights, with a lower trigger adjacent to the River Thames. The Order has been amended, so check the current version.

What happens at stage one of a referral?

The borough refers the application early in its consideration and the Mayor issues a stage one report assessing compliance with the London Plan and identifying what would need to change. It is not a decision. It is the most useful document an applicant on a large London scheme receives, because unresolved stage one issues are what later intervention is built on.

Can the Mayor refuse a borough's application?

At stage two, after the borough has resolved how it intends to decide, the Mayor can allow the borough to proceed, direct refusal, or direct that the Mayor becomes the local planning authority and determines the application personally. A direction to refuse ends the application, leaving an appeal as the route forward.

Why are mayoral development orders so rarely used?

Because borough consent is a precondition, and a borough is being asked to hand over determination of future development in its area. It is usually easier politically for a borough to grant permission itself on a scheme it has negotiated. The assessment work also has to be completed at order stage rather than later.

Sources and further reading

londonmayoral development ordergla referrallondon plandevelopment ordersplanning law

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Planning Law Updates

View all →
Planning Law Updates6 min read

Gateway Two and Three and how they affect programme

For a higher-risk building, construction cannot start before Gateway Two approval and occupation cannot start before the Gateway Three certificate. Both belong in the programme from day one.

Read article →
Planning Law Updates6 min read

Short-term lets: the C5 use class and registration

The announced C5 use class and the register for short-term lets are not in force in England. What controls a let today is the material change of use test, and in London a night limit.

Read article →
Planning Law Updates6 min read

The Housing Delivery Test and what follows a low result

The Housing Delivery Test measures what an authority built against what it needed, and three thresholds decide what follows. This is how each consequence works in practice.

Read article →
Planning Law Updates7 min read

Local plan reform and the new plan-making route

The Levelling-up and Regeneration Act 2023 replaces the local plan provisions of the 2004 Act, repeals the duty to cooperate and gives national policies statutory precedence. Here is what is in the Act and what depends on regulations.

Read article →
Planning Law Updates6 min read

The local authority biodiversity reporting duty

The Environment Act 2021 added a reporting requirement to the biodiversity duty, so English councils must publish what they have done for nature and what they plan next. Here is how to find one and use it.

Read article →
Planning Law Updates7 min read

Higher-risk buildings and the 18 metre test

The higher-risk building test has two limbs and both must be met. Here is how height and storeys are measured, which buildings the 2023 Regulations exclude, and how the gateways relate to the planning fire statement.

Read article →