An independent viability review turns your appraisal into a negotiation. How to agree the scope, answer information requests and settle the benchmark land value argument.

When an authority commissions an independent review of your viability appraisal, the appraisal stops being a document and becomes a negotiation. The reviewer is instructed by the council, usually paid for by you, and their report will go to committee alongside the officer recommendation. National viability guidance expects the whole exercise to be conducted openly, on the basis that the assessment will be published other than in rare cases, so the open book viability review is less about keeping numbers private and more about defending each input in public.

The developers who come out of this well do three things early. They agree the scope of the review before the reviewer starts. They answer information requests in a form the reviewer can audit. And they narrow the disputed inputs to two or three before the report is written.

How the review is commissioned and who pays

The council has no duty to accept your appraisal at face value and no in-house capacity to test it on most schemes, so it instructs a surveyor. The cost is almost always passed to the applicant, either through a Planning Performance Agreement or a standalone undertaking signed before the review begins.

Read that undertaking. Three clauses are worth negotiating.

  • A fee cap, or at least a stated daily rate and an estimated number of days, so the cost does not expand with the number of information requests.
  • A scope of instruction you have seen, so the review tests the appraisal rather than redesigning the scheme.
  • A right to comment on the draft report before it is finalised, which most reviewers will accept and most councils will not volunteer.

The reviewer's independence is a professional obligation rather than a planning one. RICS members carrying out financial viability work in planning are bound by the institution's professional statement on conduct and reporting, which requires objectivity and prohibits fee arrangements contingent on the outcome. If you suspect a conditional arrangement, raise it in writing at the outset rather than after the report lands.

What the reviewer is actually instructed to test

A review is not a re-run of your appraisal with the reviewer's own assumptions. It is a test of whether your inputs are evidenced and whether the conclusion follows from them. In practice the instruction covers five areas.

Input What the reviewer checks
Gross development value Comparable evidence, unit mix, affordable values, ground rents
Build cost Cost plan or published index, abnormals schedule, contingency level
Benchmark land value Existing use value plus a premium, not the price paid
Developer return Percentage of value or cost, and its justification for this scheme
Finance and programme Debit rate, drawdown profile, sales rate

Benchmark land value is where most reviews are won or lost. National guidance is clear that the price paid for land is not a justification for failing to meet policy requirements, and that the benchmark should be established from existing use value plus a premium to the landowner. An appraisal that works backwards from the acquisition price invites the reviewer to substitute a lower benchmark and report a surplus.

The developer return is the second battleground. National guidance refers to a return in the region of 15 to 20 per cent of gross development value as a starting point for plan making, while accepting that a different figure may be appropriate in particular circumstances. Argue your figure from the risk profile of this scheme, with evidence, rather than from convention.

Information requests and how to answer them

Expect requests in waves, and expect the later ones to be sharper than the first. The way you answer them shapes the reviewer's view of the appraisal as much as the numbers do.

  1. Supply the source document, not a summary of it. A build cost plan from the quantity surveyor beats a figure in a table.
  2. Keep one version of the appraisal live, numbered and dated, and issue changes as a tracked schedule rather than a fresh file.
  3. Answer questions you dislike. A refusal to produce the abnormals breakdown reads as a concession that it will not withstand scrutiny.
  4. Flag unavailable information with a reason, and offer the nearest available evidence.

Where the scheme includes affordable housing, the review will test the affordable values against the registered provider offers you hold. Your Affordable Housing Statement should already set out the tenure mix and the basis of those values, and a mismatch between that statement and the appraisal is the first thing a careful reviewer notices.

Confidentiality against the transparency expectation

National guidance expects viability assessments to be published, with an executive summary written for a non-technical reader. Commercial sensitivity is a narrow exception rather than a general right, and councils are subject to the access to information regime regardless of what the submission says.

The workable position is to accept publication and manage what goes into the document. Registered provider offers and contractor tenders can usually be referenced by date and value without reproducing the letters. Land transaction terms held in commercial confidence can be described rather than disclosed, because the benchmark land value should not rest on the price paid anyway.

Marking the whole appraisal confidential achieves very little. It delays the committee report, irritates the officer and tends to produce a redacted version that reads worse than the original.

Narrowing the points in dispute before the report

The most useful meeting in the process is the one where you and the reviewer go through the inputs and agree which are settled. Ask for it after the first round of information requests and before the draft report.

Come with a two-column schedule: agreed inputs on the left, disputed on the right, each with the evidence relied on. Most appraisals reduce to two or three genuine disagreements, typically the benchmark, the return and one cost line. A reviewer who can report that fourteen inputs are agreed and three are not has given the officer something usable, and the committee discussion becomes a decision on three numbers rather than a dispute about credibility.

Sensitivity testing helps here too. Running the appraisal at the reviewer's figure for one input, and yours for the rest, shows whether the disagreement actually changes the policy outcome. Where it does not, the point stops mattering.

Illustrative example: on a 48-unit urban scheme the reviewer accepts build cost and sales values but takes a benchmark land value 18 per cent below the applicant's figure. Sensitivity testing shows the affordable housing offer moves from 14 to 16 units. That is a negotiation about two units, not about the appraisal method, and it can be settled with a review mechanism in the section 106 agreement.

Responding to the review report

You will usually get a short window. Use it for a focused response rather than a point-by-point rebuttal of everything.

Deal with the inputs that change the outcome, concede the ones that do not, and offer a mechanism for the residual uncertainty. A late-stage review clause, a cascade in the affordable housing obligation or a phased trigger for contributions can all bridge a gap the appraisals cannot close. The note on affordable housing cascade mechanisms in a section 106 agreement sets out how those clauses are usually drafted.

Where the scheme has already stalled and the obligation is the problem, a review at application stage is the wrong tool and the route through renegotiating obligations on a stalled scheme will serve you better.

A Viability Assessment is a report councils expect to see from a suitably qualified author, and professional review is strongly advised before submission. PlanScope drafts the structure, the policy framing and the narrative sections so your surveyor is editing rather than starting from a blank page, and you can see which reports your scheme is likely to need by entering the postcode.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Who pays for the council's viability reviewer?

Almost always the applicant, through a Planning Performance Agreement or a standalone undertaking signed before the review starts. Negotiate a fee cap or a stated daily rate with an estimated number of days, and ask to see the scope of instruction, so the review tests your appraisal rather than redesigning the scheme.

Will my viability appraisal be published?

Expect it to be. National viability guidance says assessments should be prepared on the basis that they will be made publicly available other than in exceptional circumstances, with an executive summary for a non-technical reader. Commercial sensitivity is a narrow exception, so manage what goes into the document rather than marking it confidential.

Can I justify a lower affordable housing offer by the price I paid for the land?

No. National guidance is explicit that the price paid for land is not a justification for failing to comply with policy. Benchmark land value should be established from existing use value plus a premium to the landowner. An appraisal reverse-engineered from the acquisition price invites the reviewer to substitute a lower benchmark.

What developer return will a reviewer accept?

National guidance refers to a return of around 15 to 20 per cent of gross development value as a starting point for plan making, while accepting that a different figure may suit particular circumstances. Argue your number from this scheme's risk profile with evidence, because convention alone rarely survives a review.

How do I stop the review dragging on?

Ask for a meeting after the first round of information requests and bring a schedule separating agreed inputs from disputed ones. Most appraisals reduce to two or three real disagreements. Sensitivity testing then shows whether each one changes the policy outcome, and the ones that do not can be dropped.

What if the gap cannot be closed?

Offer a mechanism rather than continuing to argue. A late-stage review clause, a cascade in the affordable housing obligation or phased contribution triggers can all bridge residual uncertainty. Councils accept these routinely because they protect the authority if values improve, and they let the application be determined.

Sources and further reading

viabilitysection 106affordable housingbenchmark land valueopen book review

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Viability, Obligations and Commercial

View all →
Viability, Obligations and Commercial7 min read

Agent of change obligations for a music or sports venue

Building homes beside an established venue means funding the mitigation. The split between conditions and obligations, noise deeds and their limits, and the drafting.

Read article →
Viability, Obligations and Commercial7 min read

Build cost indices and the date of the cost plan

Cost indices and tender price indices measure different things. How the base date, the index and the valuation date interact, and how to state the basis so it holds up.

Read article →
Viability, Obligations and Commercial6 min read

Professional fees and contingency in a development appraisal

Fees and contingency look like small lines in an appraisal and move the residual land value a long way. Both are tested, and both are defended with scope documents rather than convention.

Read article →
Viability, Obligations and Commercial7 min read

Transport contributions and the trip based calculation

Highway authorities build sustainable transport contributions from trip rates and mode share. Understanding how the figure is assembled is the only way to test whether it meets the statutory tests.

Read article →
Viability, Obligations and Commercial6 min read

Affordable housing on a site with a demolition credit

Twelve houses replacing four is twelve gross and eight net. Whether the threshold and percentage are read gross or net can be the whole margin, and the levy applies a separate floorspace test with its own timing trap.

Read article →
Viability, Obligations and Commercial6 min read

Nutrient neutrality mitigation cost in a viability appraisal

In an affected catchment, nutrient mitigation is a condition of consent rather than an enhancement. Price it per dwelling with a dated quotation, and model the securing obligation and the programme delay alongside it.

Read article →