Costs, Fees and Budgeting

Screening and scoping opinions cost nothing, so use them

6 min readBy PlanScope Editorial Team

Neither a screening nor a scoping opinion attracts a planning fee, and both narrow what consultants can charge you for. Few tools in the system are better value.

An EIA screening opinion request costs nothing in application fees, and neither does a scoping opinion. Both are free statutory procedures under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017, with fixed response periods, and both produce a written position from the local planning authority that you can hold them to. For a developer trying to control an evidence base that can run into six figures, that combination is unusual enough to be worth using on almost every borderline scheme.

What a screening opinion decides

Screening answers one question: is this environmental impact assessment development? Schedule 1 projects always are. Schedule 2 projects are screened against thresholds and against the selection criteria in Schedule 3, which cover the characteristics of the development, its location and the type and characteristics of the potential impact.

The Schedule 2 thresholds that catch most development are in the urban development category: more than 150 dwellings, more than one hectare of non-residential urban development, or an overall site area exceeding five hectares. Below those figures the development is outside Schedule 2 for that category and no screening is required at all.

Sensitive areas change the arithmetic. Where any part of the development falls within a sensitive area, which includes sites of special scientific interest, National Parks, National Landscapes, World Heritage Sites, scheduled monuments and European sites, the thresholds fall away and screening is required whatever the scale.

A negative screening opinion, meaning the authority concludes an environmental statement is not required, is the outcome most applicants want, and it has to be reasoned. The authority must state its reasons, and those reasons go on the register.

What a scoping opinion fixes

Scoping comes next, where the development is EIA development. The authority states what information the environmental statement should contain, after consulting the statutory consultation bodies.

The reason this matters commercially is in the regulations themselves. Where a scoping opinion has been adopted, the environmental statement must be based on it. That turns the opinion into the specification for the whole evidence base, and it gives you a document to point at when a consultee later asks for an assessment that was never scoped in.

Scoping out is as valuable as scoping in. An opinion that records agreement that, say, wind microclimate or agricultural land classification need not be assessed removes a line item from the budget and a risk from the programme.

Why neither carries a fee

The fee regulations prescribe fees for planning applications and for certain other procedures. They do not prescribe a fee for a request under the screening or scoping provisions of the EIA Regulations, so the authority has no power to charge one.

Councils do charge for pre-application advice, and some offer an enhanced EIA advice service with a fee attached. That is a different product, bought voluntarily, and it is worth distinguishing the two when the planning department sends a charging schedule in response to a statutory request. If you want the paid discussion as well, buy it, but do not pay for the statutory opinion.

The comparison with other front-loaded costs is instructive. A design review panel is charged for, as set out in what a design review panel costs and who pays, and so are most formal pre-application services. The statutory opinions are the exception.

The information to submit with a request

The regulations set a short list for each. Both need a plan sufficient to identify the land, and a description of the development including its physical characteristics and location. A screening request needs a description of the aspects of the environment likely to be significantly affected. A scoping request needs an explanation of the likely significant effects on the environment.

In practice a good request runs to twenty or thirty pages and includes more than the minimum: a constraints plan, parameter plans or indicative layouts, a description of the construction programme, and a topic by topic table setting out your view on whether each is likely to give rise to significant effects, with reasons.

That table is the whole trick. An authority presented with a reasoned position on each topic tends to respond to it. An authority presented with a bare description writes its own list, and the list will be longer.

Attach any survey work already completed. A preliminary ecological appraisal or a desk based heritage assessment already in hand supports a case for scoping a topic out, and costs nothing extra to append.

Timescales and what happens if they slip

A screening opinion must be adopted within three weeks of the request, and a scoping opinion within five weeks, each extendable by agreement in writing. Those periods run from receipt of a request containing the required information, so an incomplete request restarts the clock.

If the authority fails to respond within the period, the remedy is to ask the Secretary of State for a screening direction, which overrides the local position. That is a real option rather than a theoretical one, though it adds time and tends to sour the working relationship, so a reminder and an agreed short extension is usually the better first move.

Build the periods into the programme properly. Three weeks for screening plus five for scoping plus the time to prepare both requests is roughly three months before the main survey work is commissioned, and surveys themselves are often seasonal.

Using the opinion to control consultant scope

Issue the scoping opinion to every consultant as part of their brief, and ask each to confirm in their fee proposal that the scope matches it. Where a consultant proposes work beyond the opinion, ask why, and record the answer.

The opinion also gives you a defence against scope creep during determination. A consultee requesting an assessment that the authority scoped out can be answered by reference to the opinion and the consultation that preceded it, and a case officer who adopted the opinion is poorly placed to insist otherwise without new information.

An environmental impact assessment must be prepared by competent experts under the 2017 Regulations, and the environmental statement has to include a statement of the expertise behind it. PlanScope's draft is a starting point for those experts rather than a substitute for them, and the specialist chapters need qualified authors.

Determination of EIA development takes 16 weeks rather than the usual 13, which is worth knowing before you promise a date to a funder. The full set of report types that a scoped environmental statement might call on is listed on the planning documents index, and what each one costs on the pricing page.

When to skip screening and assess anyway

Two situations justify going straight to an environmental statement. Where the scheme is clearly Schedule 1, screening is pointless. And where the project is marginal but the applicant needs certainty against a judicial review risk, a voluntary environmental statement removes the argument altogether, at the cost of the work.

The opposite case also exists. Where the development sits comfortably below the Schedule 2 thresholds and outside any sensitive area, requesting a screening opinion invites the authority to think about whether significant effects might arise anyway, which it might otherwise never have done. Some applicants prefer not to ask the question.

That is a judgement call rather than a rule. On balance, where there is any real prospect of a challenge from an objector group, the reasoned negative screening opinion on the register is worth having.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is there a fee for a screening opinion?

No. The planning fee regulations do not prescribe a fee for a request for a screening or scoping opinion under the EIA Regulations 2017, so the authority cannot charge for the statutory procedure. Councils may charge for voluntary pre-application advice, including enhanced environmental advice services, which is a separate and optional product.

How long does the council have to respond?

Three weeks for a screening opinion and five weeks for a scoping opinion, each running from receipt of a request containing the information the regulations require, and each extendable by written agreement. If the authority misses the period, the applicant can ask the Secretary of State for a screening direction.

What are the Schedule 2 thresholds for urban development?

Screening is required for urban development projects where the development includes more than one hectare of non-residential urban development, includes more than 150 dwellings, or has an overall site area exceeding five hectares. Those thresholds do not apply where any part of the development falls within a sensitive area, in which case screening is required regardless of scale.

Does a scoping opinion bind the environmental statement?

Where a scoping opinion has been adopted, the environmental statement must be based on it. That gives the applicant a specification to brief consultants against and a defence against later requests for assessments that were scoped out, unless new information justifies revisiting the position.

Who can prepare an environmental statement?

The 2017 Regulations require that it is prepared by competent experts, and the statement must include details of the relevant expertise. An AI-assisted draft is a starting point for those experts, never a substitute. Specialist chapters on ecology, noise, air quality and transport need appropriately qualified authors in each discipline.

Sources and further reading

eiascreening opinionscopingcostsbudgetingenvironmental statement

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Costs, Fees and Budgeting

View all →
Costs, Fees and Budgeting7 min read

Outline or full planning application: fees and risk

The reserved matters fee is calculated as if it were a full application, so the outline route rarely saves fees. What it saves is abortive design cost and risk.

Read article →
Costs, Fees and Budgeting7 min read

Bonds and sureties for landscaping and highway works

Security for landscaping and adopted highway works comes through section 106, section 278 or section 38, never a condition. How bonds are sized, priced and released.

Read article →
Costs, Fees and Budgeting7 min read

Demolition prior notification: cost and when it applies

Demolition is development. Part 11 of the GPDO turns most of it into a 28 day prior approval, but conservation areas, listed buildings and the Building Act notice all sit outside that route.

Read article →
Costs, Fees and Budgeting7 min read

Free planning applications for disabled adaptations

The 2012 fee regulations remove the planning fee for works providing access or greater safety, health or comfort for a disabled person, in homes and in buildings open to the public. It must be claimed on the application.

Read article →
Costs, Fees and Budgeting6 min read

The costs that arrive after planning permission is granted

Permission is the start of the spending, not the end. Condition discharge, verification reporting, the levy, section 278 works, Building Regulations and utility connections all arrive after the build cost is fixed.

Read article →
Costs, Fees and Budgeting6 min read

What a biodiversity net gain shortfall costs in credits

Where a scheme cannot deliver its 10 per cent gain on site or off site, statutory credits fill the gap at a published tiered price set deliberately high. The hierarchy, the rounding and the 30 year obligation all affect the budget.

Read article →