Free planning applications for disabled adaptations
The 2012 fee regulations remove the planning fee for works providing access or greater safety, health or comfort for a disabled person, in homes and in buildings open to the public. It must be claimed on the application.
No planning fee is payable where the application is for works to adapt a home for a disabled person who lives there or is about to move in. The disabled adaptation planning fee exemption sits in the fee regulations, it covers access works and works providing greater safety, health or comfort, and it applies to buildings open to the public as well as to dwellings. It is claimed on the application rather than granted on request, and a surprising number of applications go in with a cheque attached that nobody needed to write.
Before claiming it, check whether you need permission at all.
The statutory exemption and its wording
The Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) Regulations 2012 set out when no fee is payable. Two limbs matter here.
The first covers the alteration or extension of an existing dwellinghouse, or works within its curtilage, carried out to provide means of access to or within the dwelling for a disabled person who lives there or proposes to take up residence, or to provide facilities designed to secure that person's greater safety, health or comfort.
The second covers works to a building to which members of the public are admitted, or to land, for providing access for disabled people or facilities designed to secure their greater safety, health or comfort. So a village hall adding a ramp and an accessible WC is in the same position as a household adding a ground floor wet room.
The Regulations carry their own definition of a disabled person, drawn from earlier welfare legislation rather than from the Equality Act 2010. The two are not identical, so read the definition in the current Regulations rather than assuming the Equality Act test applies.
Works wholly for a disabled person's benefit
The exemption attaches to the purpose of the works, and that is where most disputes start.
A ground floor bedroom and wet room extension for a wheelchair user is squarely within it. A ramp, a widened doorway, a level threshold, a through-floor lift enclosure, a hoist gantry and a hardstanding for an adapted vehicle are all within it. So is a dropped kerb formed to allow an adapted vehicle to park off street.
What falls outside is the mixed scheme. An extension that provides an accessible bedroom at one end and a new family kitchen and dining room at the other is not wholly for the disabled person's benefit, and authorities charge the full fee on the whole application.
Two ways to handle that. Design the adaptation as a standalone scheme and apply for it separately, accepting that two applications take longer. Or submit one application, pay the fee and get on with it. Which is right depends on the fee against the delay, and on a householder scheme the fee is often the smaller number.
Check first whether permission is needed at all. Many adaptations are permitted development under Part 1 of the General Permitted Development Order: a single storey rear extension within the size, height and boundary limits, or an outbuilding within the curtilage. Ramps and level thresholds are frequently either not development or covered by a right. A lawful development certificate is the only formal way to confirm that works are lawful, and it carries its own fee, which the exemption does not remove.
Evidence the council will ask for
There is no statutory list, and practice varies between authorities, which is frustrating and worth knowing in advance.
What councils commonly accept:
- A short statement with the application explaining who the works are for, their relationship to the property, and how each element of the scheme serves their needs.
- A letter from an occupational therapist, which is the strongest single document because it ties the adaptation to an assessed need.
- Evidence of a Disabled Facilities Grant application or approval under the Housing Grants, Construction and Regeneration Act 1996.
- A blue badge, a benefits award letter or a GP letter, where nothing else is available.
Authorities should not be asking for full medical records, and you are entitled to push back politely on a request for them. Offer the occupational therapist's letter instead.
Where the person is about to move in rather than already resident, say so and explain the circumstances, because the Regulations cover a prospective resident and validation staff sometimes miss that.
Where the exemption stops
It is a planning fee exemption and nothing more. It does not remove:
The Building Regulations charge, although separate provision exists for waiving building control charges where work is solely to provide access or facilities for a disabled person, so ask the building control body directly. Listed building consent is free in any event, so the point does not arise there.
Community Infrastructure Levy, which has its own exemptions rather than following the fee position. Extensions to a dwelling below the stated floorspace threshold are generally outside the levy, and a residential extension exemption exists for a dwelling the applicant owns and occupies as their principal residence, claimed before work starts.
Any other consent the works need: an application to the highway authority for a vehicle crossing, a protected tree consent, or an agreement with the sewerage undertaker where the extension passes over a public sewer.
Interaction with building regulations approval
Planning and building control decide different questions and the adaptation has to satisfy both. Approved Document M deals with access to and use of buildings, and on a conversion or extension the relevant standard depends on the work.
The practical point for a householder is sequencing. Get the occupational therapist's recommendations first, then the drawings, then the planning position, then building control. Designing to a grant budget and then discovering the level threshold detail needs a different floor build-up is the common and avoidable mistake.
Listed buildings and access works
Access alterations to a listed building are the hardest version of this, because the statutory duty requires special regard to be had to preserving the building and its features of special architectural or historic interest.
Listed building consent is free of charge, so the fee exemption is not the issue. The issue is justification. A proposal that removes historic fabric to form a level entrance needs an explanation of why no less harmful option works, supported by an assessment of the building's significance. That belongs in a Heritage Statement prepared with an understanding of the building rather than a template.
Options that tend to succeed: a reversible ramp in a secondary doorway, a platform lift within an existing lobby, regrading the external ground level rather than cutting the threshold, and internal routes that avoid principal rooms. A Design and Access Statement is required for applications affecting a listed building and is the right place to show the alternatives considered.
Making the claim on the form
Put it in writing in two places. On the fee section of the application form, state that no fee is payable because the works are for the benefit of a disabled person under the fee regulations. And in the covering letter, name the regulation, describe the works and attach the supporting evidence.
Then check validation. An application submitted with no fee and no explanation is routinely held as invalid for weeks while nobody looks at it, which costs more time than the fee would have cost money. If validation queries the exemption, ask for the reason in writing and supply the occupational therapist letter.
For an overview of the documents a householder application usually needs, browse the report types, and PlanScope pricing sets out what a draft costs where a report is required.
This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
Which works qualify for the disabled fee exemption?
Alterations or extensions to an existing dwelling, or works within its curtilage, providing access to or within the home for a disabled person who lives there or is about to move in, or providing facilities for their greater safety, health or comfort. Works to buildings open to the public are covered on the same basis.
Does the exemption apply to a mixed scheme?
No. An extension providing an accessible bedroom at one end and a new family kitchen at the other is not wholly for the disabled person's benefit, and the authority will charge the full fee on the whole application. Either submit the adaptation as a standalone scheme or pay the fee and avoid the delay.
What evidence do councils ask for?
Practice varies, since there is no statutory list. A short statement explaining who the works are for and how each element serves their needs, plus a letter from an occupational therapist, is the strongest combination. Evidence of a Disabled Facilities Grant, a blue badge or a benefits award also helps. Full medical records should not be required.
Does the exemption cover Building Regulations charges?
No, it is a planning fee exemption only. Separate provision exists for waiving building control charges where work is solely to provide access or facilities for a disabled person, so ask the building control body directly. The levy and any highway or drainage consents follow their own rules as well.
Do I even need planning permission for an adaptation?
Often not. Many adaptations fall within Part 1 of the General Permitted Development Order, including single storey rear extensions within the size, height and boundary limits, and outbuildings within the curtilage. Ramps and level thresholds are frequently either not development or covered by a right. A lawful development certificate confirms it formally.
Sources and further reading
- Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) Regulations 2012
- Planning Practice Guidance: fees for planning applications
- Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2 Part 1
- Housing Grants, Construction and Regeneration Act 1996
- Planning (Listed Buildings and Conservation Areas) Act 1990
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.