Serving notice on owners and the searches it needs

7 min readBy PlanScope Editorial Team

If anyone else owns part of the land in your red line, certificate B and a served notice are required before submission. The title searches that make that possible are quick and best done first.

If anyone other than you owns part of the land in your red line, you sign certificate B and serve notice on them before you submit. That is the whole of the certificate B planning application requirement in one sentence, and it is the item that most often turns a self-build application invalid on day one.

The certificates sit in the Town and Country Planning (Development Management Procedure) (England) Order 2015 and appear on the standard form. Section 65(5) of the Town and Country Planning Act 1990 prevents an authority from entertaining an application without the requisite certificate, so this is not a formality the case officer can waive.

The four certificates

Certificate Position What you must do
A You own all the land and there is no agricultural tenant Sign and date; no notice needed
B Other owners are known to you Serve notice on each, then sign
C Some owners known, others not traceable Serve notice on those known, advertise for the rest
D No owner identified at all Advertise in a local newspaper

"Owner" has a specific meaning here. It is the freehold owner, or a person entitled to a tenancy with at least seven years of the term unexpired. A short-term tenant is not an owner for this purpose. An agricultural tenant is dealt with separately and must be notified regardless of the length of the term.

The land in question is all the land to which the application relates, which is wider than people assume. It includes land needed for access, for visibility splays, for a drainage connection and for construction working space if that land is inside your red line.

When certificate B applies

Certificate B is the normal position on a self-build plot. Three situations account for most of them.

The plot was bought with a deferred completion or an option, so the seller remains the registered owner at the date of application. The access crosses a strip retained by a neighbour, a developer or an estate company. Or the visibility splay the highway authority requires extends over verge land in the highway authority's ownership, which makes that authority an owner to be notified.

The last of those catches people repeatedly. If the splay is shown over adopted highway and that land is inside the red line, the highway authority is an owner. Many agents draw the splay in blue as other land in the applicant's control instead, which is wrong unless they actually control it. Red marks the application site and blue marks other land the applicant controls, and the distinction decides who has to be notified.

Shared driveways and unregistered strips are the other recurring problem. A 1930s plot with a rear access over an unregistered track will need either a certificate C or a title investigation, and the investigation is quicker than people expect.

The searches, and what they cost

You cannot complete certificate B without knowing who the owners are, which means a title investigation rather than a glance at a plan.

  1. Obtain an official copy of the register and title plan for your own land, to confirm the extent of what you own.
  2. Run a search of the index map against the land outside your title, which identifies whether it is registered and gives the title numbers.
  3. Obtain official copies for each title the index map returns, to get the proprietor's name and address for service.
  4. Where land is unregistered, check the index map result, then look for conveyancing history, estate rentcharge records or neighbouring deeds that identify an owner.
  5. Keep every search result with the application file, dated.

Online official copies cost a few pounds each and are available immediately. Postal applications cost more and take longer. HM Land Registry publishes the current figures in its fee order, so check them rather than relying on a figure from an older project. For most plots the whole exercise costs less than the planning fee.

Where land is genuinely unregistered and the owner cannot be found, you move to certificate C. That brings a cost the authority does not bear: the newspaper advertisement is the applicant's responsibility, unlike the statutory publicity the authority arranges after validation.

Serving notice and recording it

The notice is in the prescribed form on the Order and tells the recipient that an application is being made, what it is for, and where it can be inspected. It must be given to any person who was an owner or agricultural tenant 21 days before the application is made.

Practical points that save arguments later:

  • Serve by a method you can evidence. Recorded delivery to the address on the register, or personal service with a dated note.
  • Use the address for service on the official copy, not the address you think the owner lives at.
  • Where the owner is a company, serve at the registered office shown at Companies House.
  • Serve on every joint proprietor named on the register, not one of them.
  • Keep a copy of the notice itself as well as the proof of posting.

Record the date on which the last notice was served, because that date governs whether the 21 day requirement is met for every recipient.

Agricultural tenants and the separate notice

Where any part of the land is or was within the last year agricultural land, the form requires a declaration about agricultural tenants. If there is a tenant of an agricultural holding, notice must be served on them in the prescribed form whatever the length of their tenancy.

This matters on paddocks, orchards and smallholdings bought for a self-build. A grazing licence is not necessarily a tenancy of an agricultural holding, and the difference turns on the terms of the agreement rather than on what it is called. Where there is any doubt, serve the notice. Serving it unnecessarily costs a stamp. Omitting it when it was required invalidates the certificate.

When the certificate is wrong

Knowingly or recklessly issuing a certificate that contains a false or misleading statement is an offence under section 65(6) of the 1990 Act, punishable by a fine.

The civil consequence is often the bigger problem. A permission granted on a defective certificate is vulnerable to challenge, and a notified owner who was not in fact notified has a straightforward complaint. On resale, a buyer's solicitor will check the certificate against the title and ask questions about any mismatch, and an unanswered question of that kind can stall a sale while a certificate of lawfulness or an indemnity is arranged.

An illustrative example. A self-builder buys a corner plot and submits with certificate A. The visibility splay shown on the highway drawing extends 8 metres along the verge, which is adopted highway inside the red line. The council invalidates the application, the applicant re-submits with certificate B and notice served on the county council as highway authority, and six weeks are lost. The fix, had it been spotted first, was a single notice and a signature.

Where the position is more tangled, it may be worth withdrawing and resubmitting cleanly rather than correcting on the file, and our note on withdrawing and resubmitting a planning application sets out when that is the better course.

Building it into the budget

Title searches, a notice or two, and possibly a newspaper advertisement. On most plots that is a modest sum against a planning fee and a set of drawings, and it sits alongside the other pre-submission enquiries described in our note on budgeting a set of utilities capacity enquiries. The supporting documents themselves are listed across the 66 report types.

Do the title work before you commission drawings. Finding out that the access strip belongs to a dissolved company changes the scheme, and it costs far less to discover that in week one.

If you are pricing the supporting documents rather than the searches, PlanScope pricing sets out the free report, the per report price and the Professional tier.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

When do I need to sign certificate B?

Whenever someone other than the applicant owns any part of the land the application relates to and that person is known to you. Owner means the freeholder or a tenant with at least seven years of the term unexpired. Notice in the prescribed form must be served on each of them before the application is made.

Does the highway verge count as other people's land?

Yes, if it is inside your red line. A visibility splay shown over adopted highway makes the highway authority an owner for the purposes of the certificate, so notice must be served on it. Drawing the splay in blue as land in the applicant's control is wrong unless the applicant actually controls that land.

What searches do I need to complete certificate B?

Obtain an official copy of the register and title plan for your own land, run a search of the index map over the land outside your title to identify registered titles, then obtain official copies for each title returned to get the proprietor's name and address for service. Keep every dated result on the file.

Who pays for the newspaper advertisement under certificate C or D?

The applicant does. That is different from the statutory site and press notices the authority arranges after validation, which are funded by the application fee. Certificates C and D also require evidence of the reasonable steps taken to identify the missing owners before advertising becomes available.

What happens if the certificate turns out to be wrong?

Knowingly or recklessly issuing a false or misleading certificate is an offence under section 65(6) of the Town and Country Planning Act 1990. The practical risk is often larger: a permission granted on a defective certificate is open to challenge, and a buyer's solicitor will raise any mismatch between the certificate and the title on resale.

Sources and further reading

certificate bownership noticeland registryself buildvalidationplanning costs

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Costs, Fees and Budgeting

View all →
Costs, Fees and Budgeting7 min read

Press and site notices: the costs councils recover

Article 15 publicity is the authority's duty, paid for from the application fee. The advertisement costs that land on a developer come from highway orders, late Environmental Statements and performance agreements.

Read article →
Costs, Fees and Budgeting7 min read

Outline or full planning application: fees and risk

The reserved matters fee is calculated as if it were a full application, so the outline route rarely saves fees. What it saves is abortive design cost and risk.

Read article →
Costs, Fees and Budgeting7 min read

Bonds and sureties for landscaping and highway works

Security for landscaping and adopted highway works comes through section 106, section 278 or section 38, never a condition. How bonds are sized, priced and released.

Read article →
Costs, Fees and Budgeting6 min read

Screening and scoping opinions cost nothing, so use them

Neither a screening nor a scoping opinion attracts a planning fee, and both narrow what consultants can charge you for. Few tools in the system are better value.

Read article →
Costs, Fees and Budgeting7 min read

Demolition prior notification: cost and when it applies

Demolition is development. Part 11 of the GPDO turns most of it into a 28 day prior approval, but conservation areas, listed buildings and the Building Act notice all sit outside that route.

Read article →
Costs, Fees and Budgeting7 min read

Free planning applications for disabled adaptations

The 2012 fee regulations remove the planning fee for works providing access or greater safety, health or comfort for a disabled person, in homes and in buildings open to the public. It must be claimed on the application.

Read article →