Supply and demand evidence in an employment land review

7 min readBy PlanScope Editorial Team

Employment land evidence answers one question for plan-making and a narrower one on an application. Here is how the supply, demand and marketing evidence fit together.

Employment land supply evidence does two different jobs, and the mistake that wrecks most reports is treating them as one. In plan-making it answers how much employment land the area needs over the plan period and whether the supply meets it. On a planning application it answers a narrower question: whether this particular site has a reasonable prospect of being used for employment, now or in the foreseeable future.

A plan-wide shortfall does not mean your site is needed. A plan-wide surplus does not mean it is surplus. The authority will make the distinction, so the report should make it first.

What the assessment has to establish

Three findings carry the weight, and everything else in the document supports them.

The quantitative position comes first: how much employment floorspace and land exists, how much is forecast to be needed, and over what period. Then the qualitative position: whether the sites making up the supply are actually capable of meeting the forecast demand, in the right locations, at the right size, with the right access. Last, the market position: what the evidence of rents, vacancy, enquiries and take-up says about demand that forecasts can miss.

National guidance on housing and economic development needs assessments and on land availability assessments sets the framework for the first two. The third is where professional judgement does the work, and where a report earns or loses credibility.

For an application involving the loss of employment floorspace, add a fourth finding: marketing evidence. That is usually the decisive material.

Measuring the existing supply

Start with what is there, and be precise about what counts.

The supply is not simply the allocated sites in the local plan. It includes allocated and unimplemented sites, sites with extant permission for employment use, vacant existing floorspace, and land in employment use with capacity for intensification. Each category behaves differently, and lumping them into a single hectare figure hides the problem.

Supply component What to record
Allocations not yet built Area, constraints, ownership, years allocated without delivery
Extant permissions Floorspace, use class, expiry date, evidence of start
Vacant floorspace Area, quality band, time on market, asking rent
Intensification capacity Site coverage, plot ratio, access constraints

The column that tends to settle an argument is the number of years an allocation has sat undelivered. A site allocated for employment in two successive plans and never built is evidence about the market, whatever the forecast says.

Record use class carefully. The 2020 changes to the Use Classes Order folded offices, research and development and light industry into Class E, which means a building that was once counted as office floorspace can now change to other Class E uses without permission. That has consequences for any supply figure built on historic use.

Demand forecasting approaches

Three methods are in general use, and a credible report runs more than one and explains the divergence.

Labour demand forecasting takes employment projections by sector, converts jobs to floorspace using density assumptions, and converts floorspace to land using plot ratios. It is sensitive to the sector split and to the density assumptions, both of which should be stated and sourced rather than assumed.

Labour supply forecasting works from the resident population and economic activity rates, and tends to produce a different answer in areas with high net commuting. Where the two methods diverge sharply, that divergence is itself a finding.

Past completions and take-up extrapolates the historic rate of development forward. It is the simplest method and the most easily criticised, because past take-up in a constrained area reflects what was available rather than what was wanted.

State the assumptions in a table. An assessment whose floorspace per job figure cannot be found will be picked apart by anyone arguing the other side.

Qualitative suitability of allocated sites

A hectare of employment land on paper is not a hectare a business can occupy. This section tests each site in the supply against what the forecast demand actually requires.

The tests that matter are size and configuration, access to the strategic road network, floor to ceiling height and yard depth for industrial and logistics uses, power supply capacity, flood risk, contamination, ownership fragmentation, and whether the site is adjacent to housing in a way that limits operating hours.

Power capacity has become one of the more decisive constraints in several parts of England, and a site with no realistic grid connection within the plan period is not available supply in any meaningful sense. The report should say so rather than counting it.

Where the conclusion is that part of the supply is unsuitable, quantify the deduction. An employment land assessment that concludes qualitatively that some sites are poor, without adjusting the numbers, has not finished the job.

Marketing evidence for a loss case

Where the application proposes to lose employment floorspace, the marketing record is the evidence the authority weighs most heavily.

What a well-prepared marketing case contains: the period of active marketing, usually expected to run for 12 to 24 months though the local plan sometimes specifies a figure, the agent instructed and their credentials in that sector, the asking rent or price with evidence that it was set at market level, the marketing channels used with dated copies of particulars and listings, a log of enquiries and viewings with the reason each did not proceed, and any offers received and why they were rejected.

The two weaknesses that defeat a loss case are an asking price above market and a marketing period that began only after the alternative scheme was designed. Authorities and inspectors both look for them.

Set the marketing evidence against the building rather than the land. A 1960s industrial unit with 4 metre eaves, no yard and a shared access has a different market from the generic figure for industrial floorspace in the borough, and the report should say which market it is in.

Alternative use arguments and their limits

The Framework supports a plan-led approach that avoids the long-term protection of employment sites where there is no reasonable prospect of them being used for that purpose, and that is the policy hook for most loss cases.

Three arguments are routinely overstated. That residential value exceeds employment value proves nothing, because that is true of almost every employment site in southern England. That the building is in poor condition proves little, because condition is a function of the owner's investment. That no enquiries were received proves nothing where the marketing was inadequate.

What does work is a combination: a site that is qualitatively poor against the tests above, real marketing at market terms over a sustained period, and an alternative use that delivers something the plan is short of. Where the alternative is residential, the viability assessment and the employment evidence have to tell the same story about values, and reviewers read them side by side. The sections a reviewer reads first in a viability assessment are a useful guide to how that cross-check gets done.

Prior approval under Class MA of the General Permitted Development Order 2015 is a separate route for some commercial to residential changes, with its own conditions and limitations, and it does not require this evidence at all. Check whether it is available before building a full loss case.

Presenting the conclusion

Put the conclusion in the first page, with the numbers that support it, then show the working.

A conclusion that reads as a range with a stated central case is more credible than a single number. Say what would change the answer: a different sector split, a change in the plan period, delivery of a stalled allocation. And where the evidence is finely balanced, say that too, because a report that concludes emphatically on thin data invites an equally emphatic rebuttal.

Keep the economic impact assessment, where one is submitted, consistent with the employment evidence on job numbers and floorspace. Contradictions between the two are the easiest point for an objector to make.

PlanScope drafts employment and economic evidence structured to UK planning policy, with gaps flagged rather than filled with assumptions. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. Councils usually expect a suitably qualified author for employment land work, so professional review is strongly advised.

Frequently asked questions

How long should employment floorspace be marketed before a loss case?

Expect 12 to 24 months of active marketing, though some local plans specify a period and that figure governs. What matters alongside the duration is that marketing began before the alternative scheme was designed, that the asking price was set at market level with evidence, and that enquiries and viewings were logged with reasons for not proceeding.

Which demand forecasting method should an assessment use?

A credible assessment runs more than one. Labour demand forecasting converts sector job projections to floorspace and land, labour supply forecasting works from resident population and activity rates, and past take-up extrapolates historic completions. Where the methods diverge sharply, the divergence is a finding in itself and should be explained rather than averaged away.

Does the Use Classes Order affect employment land supply figures?

Yes. The 2020 changes folded offices, research and development and light industry into Class E, so a building once counted as office floorspace can now move to other Class E uses without permission. Any supply figure built on historic use categories needs checking against what the Order now permits before it is relied on.

Is a plan-wide employment land surplus enough to justify losing a site?

No. A plan-wide surplus does not establish that a particular site is surplus, just as a shortfall does not establish that a particular site is needed. The application-stage question is whether this site has a reasonable prospect of being used for employment, which turns on its qualitative suitability and the marketing record.

Can Class MA prior approval avoid the need for employment evidence?

For some commercial to residential changes, yes. Prior approval under Class MA of the General Permitted Development Order 2015 has its own conditions and limitations and does not require a supply and demand case. Check whether the building and the site qualify before building a full loss case, because the two routes involve very different evidence.

Sources and further reading

employment landuse classesviabilityreport deep divecommercial

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Report Deep Dives

View all →
Report Deep Dives7 min read

Specifying odour abatement in an extraction statement

The abatement specification follows from the odour risk assessment. Cooking type, extract volume and receptor distance set the number of treatment stages needed.

Read article →
Report Deep Dives7 min read

Deliveries and routing in a construction traffic plan

A routing section that promises to use the primary network where practicable will be returned. Name the roads, give the peak vehicle numbers, and say how a breach is handled.

Read article →
Report Deep Dives7 min read

Choosing consultation methods in an SCI

The methods section has to show the consultation could have changed something. That means justifying each method against its audience and reporting what it failed to reach.

Read article →
Report Deep Dives7 min read

Judging significance of effects in an LVIA

Significance of effects in an LVIA is a reasoned judgement built from value, susceptibility and magnitude. Matrices present the conclusions; they do not produce them.

Read article →
Report Deep Dives7 min read

Unregulated emissions in a whole life carbon assessment

Appliances, small power and lifts are not controlled by Part L but still belong in B6. Why figures vary so widely and what a checkable assessment states.

Read article →
Report Deep Dives7 min read

The maintenance section of a landscape strategy

The maintenance section is where a landscape strategy is won or lost. It has to name who does the work, for how long, paid from what, with what happens when planting fails.

Read article →