Viability, Obligations and Commercial

Acquisition costs and stamp duty in a viability appraisal

6 min readBy PlanScope Editorial Team

Acquisition costs are a small line that causes large arguments. The conventional schedule, the stamp duty question, and what to do when the land is already owned.

Acquisition costs in a viability appraisal are the fees and taxes a purchaser pays on top of the land price: stamp duty land tax, the agent's fee, legal fees and due diligence. They are a small line in a residual appraisal and they cause an outsized number of arguments, because the reviewer's first question is whether the benchmark land value you have used already includes them.

Get the convention right and the line is uncontroversial. Get it wrong and you have either double counted a few per cent of land value or understated your costs, and either way the reviewer stops trusting the rest of the model.

Which acquisition costs belong in the appraisal

The conventional schedule is short and each item should be stated as a percentage or a sum with a basis.

  • Stamp duty land tax, calculated on the land price at the rates applicable to the transaction.
  • Agent's acquisition fee, usually expressed as a percentage of the purchase price.
  • Legal fees on the acquisition, including the cost of reporting on title.
  • Due diligence: survey, ground investigation, title searches and any specialist report commissioned before exchange.

What does not belong here is anything that is a development cost rather than a transaction cost. Pre-application fees, planning application fees, design fees and the cost of the evidence base sit in professional fees, not acquisition. Reviewers see them migrated into acquisition costs often enough to look for it.

Finance on the land purchase is a separate matter again, and it belongs in the finance line with the rest of the cash flow rather than being rolled into acquisition.

Stamp duty and the bands that apply

Stamp duty land tax applies in England and Northern Ireland. Scotland has land and buildings transaction tax and Wales has land transaction tax, with their own rates and thresholds, so a scheme in either nation needs the relevant national tax rather than an England figure.

Rates and thresholds change at fiscal events, so take the current figures from the published rates rather than from a template appraisal. Three structural points hold regardless of the numbers.

The charge is banded and applies to the slice of consideration within each band, not at a single rate to the whole price. Non-residential and mixed-use land is charged on a different scale from residential land, and most development site acquisitions fall on the non-residential scale even where the end use is housing. And acquisitions of residential property by companies can attract the higher rates for additional dwellings and, above a threshold, a flat higher charge, with relief available to property development businesses that meet the conditions.

The practical consequence is that the tax figure in your appraisal depends on how the land is classified at the date of the transaction, not on what you intend to build. State the classification you have assumed and why.

These are small and should still be evidenced. A reviewer will accept a market percentage without much argument where you have said what it is based on, and will query a figure that sits above the range without explanation.

Two situations need a note in the appraisal. Where the site was assembled from several ownerships, the aggregate legal and agency cost is higher than a single purchase and the schedule should show it per transaction. And where an option or promotion agreement is in place, the promoter's fee is not an acquisition cost in the conventional sense, so set out how the arrangement has been reflected and avoid counting the same money twice.

Due diligence costs are worth itemising on brownfield sites. A ground investigation and a Phase 1 desk study commissioned before exchange are real money, and they are easier to justify as acquisition costs than as abnormals once construction starts. Land contamination reports need a suitably qualified and experienced author working to BS 10175, so these are not costs to assume away.

Where the land is already owned

This is where appraisals go wrong most often, and the answer is more straightforward than the arguments suggest.

Land already in your ownership still enters the appraisal at benchmark land value, not at historic cost. National viability guidance establishes benchmark land value from existing use value plus a premium to the landowner, and the price you paid in 2014 is irrelevant to that calculation.

Acquisition costs are a different question. No transaction is taking place, so no stamp duty is payable and no agent is being paid. The defensible positions are either to exclude acquisition costs altogether and say so, or to include them as a notional allowance on the basis that a hypothetical purchaser would incur them, and say that too. What is not defensible is including them silently while presenting the land at benchmark value and hoping nobody asks.

Where the land was acquired recently at above benchmark value, resist the temptation to use the acquisition costs line to recover part of the overpayment. The price paid is not a justification for failing to meet policy requirements, and a reviewer who spots the manoeuvre will discount other judgements in the appraisal.

Double counting against benchmark land value

The core question is whether the benchmark you have adopted is the sum received by the landowner or the total cost to the purchaser.

Convention Land line Acquisition costs
Benchmark as net receipt to landowner Benchmark land value Added as a separate line on top
Benchmark as gross cost to purchaser Benchmark land value including costs Not added again

Either convention works provided the appraisal says which one it has used. Most appraisals and most reviewers treat benchmark land value as the amount the landowner receives, with purchaser's costs added separately, and that is the safer default because it matches how the existing use value calculation is normally built.

Illustrative example: a site with a benchmark land value of £1,200,000 and acquisition costs assumed at 6.8 per cent, covering tax, agency and legal fees, produces a land cost line of £1,281,600. If the benchmark had been derived from a market transaction expressed as a gross price including the purchaser's costs, adding 6.8 per cent again overstates the cost by just under £82,000 and, on a small scheme, that is an affordable unit.

The schedule to submit

Put acquisition costs in their own table in the appraisal, with four columns: item, basis, rate and amount. Add a short note stating the convention adopted for benchmark land value and whether purchaser's costs are included in it.

Three further habits reduce the number of questions you get back.

  1. Reference the source for the tax calculation, with the date of the rates used.
  2. Where the site is being acquired subject to conditions, say whether the appraisal assumes the conditional or unconditional price.
  3. Keep the same figures in the appraisal, the Viability Assessment narrative and any Affordable Housing Statement you submit, because inconsistencies between those documents are the fastest way to lose credibility with a reviewer.

A Viability Assessment is a report councils expect from a suitably qualified author, and professional review is strongly advised before submission. Where the appraisal shows the obligation cannot be met in full, the mechanisms described in renegotiating obligations on a stalled scheme and in phasing a permission to spread the levy liability are the next places to look.

PlanScope drafts the narrative and policy sections of a viability submission so your surveyor is editing rather than starting from nothing, and you can see which reports your scheme is likely to need by entering the postcode.

This is general guidance, not legal, valuation or tax advice; stamp duty rates change and you should check the current published rates and take professional advice before relying on any figure here. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Which costs count as acquisition costs?

Stamp duty land tax, the agent's acquisition fee, legal fees on the purchase and pre-exchange due diligence such as survey and ground investigation. Planning fees, design fees and the cost of the evidence base are development costs and belong in professional fees, not here. Finance on the land sits in the finance line.

Which stamp duty scale applies to a development site?

Usually the non-residential and mixed-use scale, even where the end use is housing, because the classification follows the land at the date of the transaction rather than the intended development. Rates and thresholds change at fiscal events, so take them from the current published rates and state the date used.

Do acquisition costs apply if I already own the land?

No transaction is taking place, so no tax or agency fee is actually incurred. You can either exclude them and say so, or include a notional allowance on the basis that a hypothetical purchaser would pay them and say that too. Including them silently while presenting land at benchmark value is what reviewers object to.

Can I use the price I actually paid for the land?

Not as the land cost. Benchmark land value is derived from existing use value plus a premium to the landowner, and the price paid is not a justification for failing to meet policy requirements. Using the acquisition costs line to recover part of an overpayment tends to undermine the rest of the appraisal.

How do I avoid double counting purchaser's costs?

State the convention you have used. If benchmark land value is the net sum received by the landowner, add purchaser's costs as a separate line. If the benchmark is derived from a gross market price that already includes them, do not add them again. Most reviewers expect the first convention.

What about schemes in Scotland or Wales?

Stamp duty land tax applies in England and Northern Ireland only. Scotland has land and buildings transaction tax and Wales has land transaction tax, each with its own rates and thresholds. Use the relevant national tax and the relevant national planning policy framework rather than transposing an England appraisal.

Sources and further reading

viabilitystamp dutyacquisition costsbenchmark land valueappraisal

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Viability, Obligations and Commercial

View all →
Viability, Obligations and Commercial7 min read

Agent of change obligations for a music or sports venue

Building homes beside an established venue means funding the mitigation. The split between conditions and obligations, noise deeds and their limits, and the drafting.

Read article →
Viability, Obligations and Commercial7 min read

Build cost indices and the date of the cost plan

Cost indices and tender price indices measure different things. How the base date, the index and the valuation date interact, and how to state the basis so it holds up.

Read article →
Viability, Obligations and Commercial6 min read

Professional fees and contingency in a development appraisal

Fees and contingency look like small lines in an appraisal and move the residual land value a long way. Both are tested, and both are defended with scope documents rather than convention.

Read article →
Viability, Obligations and Commercial7 min read

Transport contributions and the trip based calculation

Highway authorities build sustainable transport contributions from trip rates and mode share. Understanding how the figure is assembled is the only way to test whether it meets the statutory tests.

Read article →
Viability, Obligations and Commercial6 min read

Affordable housing on a site with a demolition credit

Twelve houses replacing four is twelve gross and eight net. Whether the threshold and percentage are read gross or net can be the whole margin, and the levy applies a separate floorspace test with its own timing trap.

Read article →
Viability, Obligations and Commercial6 min read

Nutrient neutrality mitigation cost in a viability appraisal

In an affected catchment, nutrient mitigation is a condition of consent rather than an enhancement. Price it per dwelling with a dated quotation, and model the securing obligation and the programme delay alongside it.

Read article →