Planning obligations attached to permission in principle
A permission in principle cannot carry planning obligations. Affordable housing, contributions and levy liability are all settled at technical details consent, which is where the cost lands.
Permission in principle does not carry planning obligations. It cannot: the consent fixes only the use, the location and the amount of development, and financial contributions, affordable housing and infrastructure requirements are all settled later, at technical details consent. For anyone buying a site on the strength of a permission in principle, that is the single most important thing to understand. You are buying confirmation that housing is acceptable in principle on that land, with the cost of making it acceptable still unpriced.
What permission in principle actually fixes
Permission in principle was introduced by the Housing and Planning Act 2016, which inserted section 58A into the Town and Country Planning Act 1990. It comes by two routes: an application to the local planning authority under the Town and Country Planning (Permission in Principle) Order 2017, or an entry on the authority's brownfield land register.
The grant settles three things and nothing else. The use, which for the application route is mainly housing. The location, by reference to the site boundary. And the amount of development, expressed as a number of dwellings, usually as a range with a minimum and a maximum.
Everything else is reserved: layout, scale, appearance, landscaping, access, drainage, ecology, parking, noise, contamination, and every contribution the authority wants. The scope of the application route and the life of the consent are both set by the Order as amended, so check the current position rather than relying on a figure from an older deal.
Why obligations cannot be secured at the first stage
An agreement under section 106 of the 1990 Act binds land in connection with a planning permission, and it has to be proportionate to a development whose effects are known. At permission in principle stage the effects are not known, because the scheme has no layout, no mix and no access arrangement. There is nothing to calibrate a contribution against.
The statutory tests make the same point from the other direction. Regulation 122 of the Community Infrastructure Levy Regulations 2010 requires an obligation to be necessary, directly related to the development and fairly and reasonably related in scale and kind. A contribution agreed before the development is described cannot satisfy the third limb with any confidence.
So the sequence is fixed. Principle first, then the priced package.
Technical details consent and the contribution stage
Technical details consent is where the application becomes a normal planning application in all but name. The authority tests the detailed scheme against its development plan, consults in the usual way, and secures whatever obligations the scheme generates.
| Matter | Permission in principle | Technical details consent |
|---|---|---|
| Use, location, amount | Fixed | Must accord with the principle |
| Affordable housing | Not secured | Secured by obligation |
| Education, open space, highways sums | Not secured | Secured by obligation |
| Conditions | Not imposed | Imposed in the usual way |
| Levy liability | Not triggered | Triggered on grant |
| Consultee comments | Limited | Full consultation |
The practical effect is that a site with permission in principle for up to nine dwellings can still face an affordable housing requirement, a drainage upgrade, a highway works package and an education sum once the detail is submitted, and none of those were visible when the land changed hands.
Where the mix proposed at technical details stage brings the scheme over a policy threshold, the Affordable Housing Statement has to address the full requirement, and the principle already granted gives no protection against it.
Levy liability and the timing of the charge
Community Infrastructure Levy liability attaches to the permission that authorises development, which in this route is the technical details consent rather than the permission in principle. That timing has two consequences worth planning for.
First, the rate applied is the rate in force when technical details consent is granted, not when the principle was established. A charging schedule reviewed in between will apply at the later rate.
Second, the usual exemptions and reliefs operate from the technical details consent, so self-build exemption claims, the notice served before works start and the assumption of liability all key off that date. Phasing the technical details consent can spread the liability, in the same way as phasing a permission to spread the levy liability on a conventional consent.
Risk for a purchaser relying on the permission
A permission in principle has real planning value. It is also a thinner asset than it looks, and the gap between the two is where overpayment happens.
The unpriced items, in rough order of how often they surprise people:
- Affordable housing, where the dwelling range crosses a local threshold.
- Drainage, where no capacity enquiry has been made and the outfall is uncertain.
- Highway works, where access has never been assessed by the highway authority.
- Biodiversity net gain, where the baseline habitat condition has not been surveyed.
- Contamination, on any site with a previous commercial or industrial use.
- Levy liability at a rate that may change before technical details consent.
Biodiversity net gain deserves a line of its own. The principle says nothing about habitat, so the gain requirement lands entirely at technical details stage, and on a site with good condition grassland the compensation cost can be material. The baseline has to be measured by a competent person under the Environment Act 2021 regime, and the survey season may not align with your programme.
What to check before buying
Read the decision notice and the application documents together. The notice will state the use, the boundary and the dwelling range, and the range is the commercial heart of the deal. A principle for five to nine dwellings is a different asset from one for nine dwellings.
Then build the cost of the technical details consent as a line in the appraisal rather than a contingency. That means a pre-application enquiry on access and drainage, a desk review of contamination history, a habitat baseline where any vegetation exists, and a read of the authority's current charging schedule and affordable housing policy.
Where the sums threaten deliverability, a Viability Assessment at technical details stage is the route, and it will be judged against the land value you paid only to the extent that the price was reasonable in policy terms. Overpaying on the strength of an unpriced principle is not an argument that carries weight.
An illustrative example
A paddock edge site with permission in principle for five to nine dwellings, bought on the basis that consent was effectively in place. This example is illustrative only. At technical details stage the highway authority requires a visibility splay that removes one plot, the habitat baseline shows moderate condition grassland requiring off-site units, and the drainage solution needs a pumped connection. The scheme that gets consent is seven dwellings with three unpriced cost lines added, which is a materially different proposition from the nine the appraisal assumed.
Where this route works well
None of this makes permission in principle a bad instrument. On a straightforward infill plot with a known access and mains drainage at the boundary, it is a quick and inexpensive way to establish that housing is acceptable, and the technical details stage is then narrow.
The route works least well where the hard questions are the ones the principle cannot answer. Where access, drainage or habitat is the actual constraint on your site, a full application with a supporting Planning Statement will tell you more and cost less in total than a principle followed by an argument.
You can enter your postcode on PlanScope to see which supporting documents a technical details submission on your site is likely to need.
This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.
PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
Can a section 106 agreement be attached to a permission in principle?
No. The consent fixes only use, location and amount of development, so there is no described scheme to calibrate an obligation against. Regulation 122 of the Community Infrastructure Levy Regulations 2010 requires an obligation to be fairly and reasonably related in scale and kind, which cannot be judged before the detail exists. Obligations are secured at technical details consent.
When does levy liability arise on this route?
On the grant of technical details consent, because that is the permission authorising development. The rate applied is the one in force at that date, so a charging schedule reviewed between the two stages will apply at the later rate. Exemption claims, assumption of liability and the notice served before works start all key off the technical details consent.
Does biodiversity net gain apply to permission in principle?
The gain requirement bites at technical details consent, not at the principle stage. That means the habitat baseline, the metric calculation and any off-site units all sit in the later application. The baseline must be measured by a competent person under the Environment Act 2021 regime, and survey seasons can delay a programme.
Is a permission in principle worth buying?
It has real value where the site is straightforward, with known access and mains drainage at the boundary. It is worth much less where access, drainage, contamination or habitat is the real constraint, because the principle answers none of those questions. Price the technical details stage as a cost line rather than a contingency.
What does the dwelling range on the decision notice mean?
It states the minimum and maximum number of dwellings the principle covers, and it is the commercial heart of the consent. A principle for five to nine dwellings is a different asset from one for nine, because the technical details scheme must sit within the range. Read the range before relying on a headline unit number.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.