Constraints and Designations articles – page 10

294 articles
Constraints and Designations7 min read

Neighbourhood plan designations and the weight they carry

A made neighbourhood plan is part of the statutory development plan, so its Local Green Spaces, views and settlement boundaries bind decisions. Here is how much weight each stage carries.

Read article →
Constraints and Designations6 min read

Local plan allocations as constraint and opportunity

Allocation policies come with requirement schedules that are development plan policy in their own right. Here is how to read them before you buy or draw anything.

Read article →
Constraints and Designations6 min read

Designations that trigger a statutory consultee

Nearly every statutory consultation trigger is geographic. Work them against your constraint layers before submission and you can predict who will be consulted and what they will want.

Read article →
Constraints and Designations6 min read

Historic landfill records and how to find them

Published landfill datasets miss most pre-1970s tips. Here is how to search them, cross-check with historical mapping, and work out what the findings mean for monitoring.

Read article →
Constraints and Designations7 min read

The Broads and its own planning authority

Sites in the Broads executive area are decided by the Broads Authority, not the district council. Here is what its navigation duty, restricted permitted development rights and tidal flood risk mean for an application.

Read article →
Constraints and Designations6 min read

Challenging a designation boundary that maps your site wrong

A mapped boundary is evidence, not a fact. Where it is wrong, the route to fixing it runs through the body that published it, and the timescales rarely match a development programme.

Read article →
Constraints and Designations6 min read

Buffer distances in planning and where they come from

Some separation distances are fixed by law, some are advisory minimums from national standing advice and some appear in a local document with no evidence behind them. Knowing which is which changes the argument.

Read article →
Constraints and Designations6 min read

What a commercial constraints search misses

A search report answers what national datasets can answer. Site allocations, minerals safeguarding, local wildlife sites and nutrient neutrality are not among them.

Read article →
Constraints and Designations6 min read

Checking site constraints on the national planning data service

The national planning data service answers a constraints check in minutes, but local layers such as Article 4 directions are published unevenly. A blank map is not a clear site.

Read article →
Constraints and Designations6 min read

When two designations overlap and the tests conflict

Green Belt, flood zones, heritage duties and habitats tests are different shapes of test, and none absorbs the others. Sequence them from hardest gateway to softest balance.

Read article →
Constraints and Designations6 min read

Safeguarding for railways and strategic infrastructure

A lineside site carries two consent tracks: the planning application with its statutory consultation, and the infrastructure owner's own asset protection approvals for piling, oversail, fencing and drainage.

Read article →
Constraints and Designations7 min read

Functional floodplain: what Flood Zone 3b changes

Housing is not appropriate development in the functional floodplain, and no mitigation changes that. The extent comes from the local strategic assessment, not the national map.

Read article →
Constraints and Designations6 min read

Air Quality Management Areas and what they add

An AQMA declaration shifts the starting assumption rather than blocking development. The assessment has to separate exposure of new occupants from emissions the scheme adds.

Read article →
Constraints and Designations6 min read

Article 4 directions: what they remove and how to check

An article 4 direction removes named permitted development rights in a mapped area. Why applications it forces are free of charge, and why twelve months notice matters.

Read article →
Constraints and Designations7 min read

Tree Preservation Orders: what is protected and how

Tree Preservation Orders protect individual trees, groups, areas and woodlands but never hedges. What is exempt, how to apply for consent, and the replacement duty that survives a lawful felling.

Read article →
Constraints and Designations6 min read

Habitats sites: SAC, SPA and Ramsar in planning

Where a habitats site may be affected, the council must conclude there is no adverse effect on integrity. That is not a balance, which is why these schemes stall.

Read article →
Constraints and Designations6 min read

Development near a site of special scientific interest

The practical constraint around an SSSI is the impact risk zone rather than the notified boundary, and air quality and water zones can extend for kilometres.

Read article →
Constraints and Designations6 min read

National Landscapes: what changed beyond the name

The rename from Area of Outstanding Natural Beauty changed no boundary and no statute. The strengthened section 85 duty did change how applications have to be argued.

Read article →
Constraints and Designations6 min read

Conservation areas: what the designation actually controls

Designation removes several permitted development rights, makes demolition of an unlisted building a matter for planning permission, protects trees through a six-week notice and engages the section 72 duty.

Read article →
Constraints and Designations7 min read

Grey belt: how the definition is applied in practice

Grey belt turns on whether a parcel strongly contributes to three named Green Belt purposes. Here is how to assess one, and what comes attached if it qualifies.

Read article →
Constraints and Designations7 min read

Green Belt: the five purposes and the harm test

Green Belt policy turns on two tests: whether development is inappropriate, and whether the harm is clearly outweighed. Here is how each one works on a real site.

Read article →
Constraints and Designations7 min read

Hazardous substances consultation zones explained

Applications near a hazardous installation or a high pressure pipeline are referred to the Health and Safety Executive. How the zones work, how advice is given and how to design around it.

Read article →
Constraints and Designations7 min read

Common land, village greens and section 38 consent

Fencing, building or surfacing registered common land needs consent under section 38 of the Commons Act 2006, decided separately from planning permission. Deregistration, exchange land and green registration explained.

Read article →
Constraints and Designations6 min read

Water neutrality and how a scheme proves it

In a water neutrality area, total water use after development must be no greater than before. That means a water budget, a tight fittings specification and an offset delivered somewhere else in the same supply zone.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope