Constraints and Designations articles – page 13

294 articles
Constraints and Designations6 min read

Registered parks and gardens: what the designation means

There is no registered park consent. What registration changes is the evidence, the consultees and the harm test, and where a new building can sensibly sit within a designed landscape.

Read article →
Constraints and Designations6 min read

Archaeological Priority Areas and what triggers evaluation

A mapped priority area means the council wants to know what is under the ground before it decides. The tiers, the evaluation sequence, and how foundation design changes the answer.

Read article →
Constraints and Designations6 min read

Coal mining risk areas and the referral requirement

Coalfield councils will not validate an application in a Development High Risk Area without a Coal Mining Risk Assessment. The free check, the report contents, mine entry zones and Coal Authority permits.

Read article →
Constraints and Designations7 min read

Source Protection Zones and what they change on a site

A Source Protection Zone rarely stops a scheme. It changes the drainage design, the foundation method and the remediation targets, and the Environment Agency has views on all three.

Read article →
Constraints and Designations7 min read

Local Green Space designation and what it blocks

Local Green Space gives an ordinary field Green Belt style protection, but only through a local or neighbourhood plan and only where three strict tests are met.

Read article →
Constraints and Designations7 min read

Ancient woodland buffers and what councils expect

Ancient woodland is an irreplaceable habitat, so the policy test is close to a prohibition. How buffers are measured, what counts as deterioration, and the evidence an application needs.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope