Council Guides articles – page 2

140 articles
Council Guides6 min read

Replacement dwellings in the countryside: the policy tests

Two questions decide a countryside replacement dwelling before anyone looks at the design: is the residential use lawful and still alive, and is the new house materially larger?

Read article →
Council Guides7 min read

Outbuilding used for business or letting: the rules

Building a garden room and using it are two separate acts of development. Where the incidental use test breaks down, and how to get certainty before you commit.

Read article →
Council Guides6 min read

Rear extension depth and the 45-degree test explained

The 45-degree test is local design guidance, not statute, and it is the first thing an officer draws on your plan. Here is how it works and how to design around it.

Read article →
Council Guides6 min read

Dropped kerbs, driveways and front gardens: the rules

Front garden surfacing is a planning matter and the dropped kerb is a highways matter. Here is how the permeable surfacing condition works and what the highway authority checks.

Read article →
Council Guides7 min read

Basement extensions outside London: what councils ask for

Excavating a new basement under a house normally needs permission, while converting an existing cellar usually does not. Here is what councils outside London ask for and where applications fail.

Read article →
Council Guides7 min read

The flood exception test on a small site: passing both limbs

A single new house is not minor development, so the sequential and exception tests both bite. Here is what each limb needs and how councils condition small sites in Flood Zone 3a.

Read article →
Council Guides7 min read

Village shop to residential: prior approval or full application

Class MA prior approval assesses listed matters only. Where it is unavailable, a policy protecting the last village shop decides the case, and marketing evidence carries it.

Read article →
Council Guides6 min read

Solar farms and ground-mounted arrays: the policy tests

Field solar arrays are full planning applications. Land quality, landscape effect and restoration decide them, and the agricultural grade needs a site-specific soil survey.

Read article →
Council Guides7 min read

Caravans, static homes and holiday lets: what permission needs

Siting caravans or glamping units needs planning permission and, separately, a site licence. Here is where the temporary use allowance ends and what a rural tourism application should contain.

Read article →
Council Guides8 min read

Stables and equestrian planning permission: what councils need

Grazing horses can be lawful without an application, but stabling, schooling and a manege are a change of use. Here is what needs permission and what a small equestrian application should contain.

Read article →
Council Guides7 min read

Rural workers' dwellings and agricultural occupancy ties

A new home in open countryside for a rural worker turns on two tests: whether the enterprise needs someone on site, and whether it can pay for them.

Read article →
Council Guides6 min read

Employment land policies: losing a B2 or B8 site

Releasing a safeguarded industrial or storage site turns on evidence: marketing at realistic terms, the council's own employment land review, and whether homes can sit next to what remains.

Read article →
Council Guides6 min read

Retail frontage policies and change of use in a parade

Frontage policies count non-retail units along a defined street. Class E removed the permission requirement for many of those movements, which has left some policies with very little to bite on.

Read article →
Council Guides7 min read

Student accommodation planning policy: what councils test

Purpose-built student accommodation usually sits outside the use classes, which changes the policy test, the section 106 package and the evidence base a scheme has to carry.

Read article →
Council Guides7 min read

Converting a house into flats: the policy tests

Using a single dwellinghouse as two or more dwellings is a material change of use with no permitted development route. The principle of subdivision fails more applications than the floor plans do.

Read article →
Council Guides7 min read

Letting an annexe separately: the condition and the breach

Letting an annexe to an unconnected tenant breaches the ancillary occupation condition. A separate council tax band is evidence against you, not a permission, and section 73 is the route to regularise.

Read article →
Council Guides6 min read

Nursery planning permission: use class, parking and play space

Class E(f) covers a creche or day nursery, so moving into an existing Class E unit is not development. Conditions, external works, drop-off parking and play noise are where applications are decided.

Read article →
Council Guides7 min read

Hot food takeaways near schools: what council policy tests

A hot food takeaway sits outside Class E, so change of use always needs permission. Exclusion zones near schools, frontage clustering caps and environmental health evidence decide the outcome.

Read article →
Council Guides7 min read

Advertisement consent: what councils test on shopfront signs

Councils can only refuse advertisement consent on amenity and public safety grounds. Here is which shopfront signs already carry deemed consent, what a shopfront design guide will ask for, and what to submit.

Read article →
Council Guides7 min read

Council playing field and open space policies on small sites

A 15 unit scheme can trigger a Sport England consultation, an open space contribution and a play space calculation. Here is how each is assessed and what to submit.

Read article →
Council Guides7 min read

Council brownfield land registers and permission in principle

Permission in principle settles location, land use and amount, and nothing else. Here is how it differs from outline permission and when a full application is faster.

Read article →
Council Guides7 min read

Council garden land policies: building in a back garden

Garden plots are consented every week, but not on brownfield policy support. Here is how councils test tandem layouts, retained amenity and access, and what to submit.

Read article →
Council Guides7 min read

Council housing mix policies: unit sizes and bedroom numbers

Adopted local plans usually set a bedroom mix by tenure and apply Part M accessibility standards by percentage. Here is how the evidence works and how to argue a departure.

Read article →
Council Guides7 min read

Council urban design officers: what they look for in a scheme

Urban design officers are internal consultees whose memo often becomes the design paragraphs of the officer report. Here is what they read for and how to answer them.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope