Data Tools How-To articles – page 7

159 articles
Data Tools How-To6 min read

Source protection zones and what they mean for drainage

A site in an inner source protection zone cannot rely on soakaways for anything but clean roof water. Check the zone before the drainage strategy is drawn.

Read article →
Data Tools How-To6 min read

Checking coalfield referral areas before you fix a layout

A shaft under a plot moves buildings, not foundations. Check the coalfield referral status at appraisal, before the layout hardens around something that cannot be built on.

Read article →
Data Tools How-To6 min read

Using the BGS GeoIndex for borehole and ground data

The British Geological Survey publishes free onshore mapping and scanned borehole records. Used properly they shape a desk study, a soakaway design and a foundation budget.

Read article →
Data Tools How-To6 min read

Reading Defra background pollutant maps for an assessment

The background maps are the baseline for most air quality work. Two recurring errors are the wrong grid square and counting a modelled road twice.

Read article →
Data Tools How-To6 min read

Finding the Air Quality Management Area boundary for a site

Every Air Quality Management Area is declared by its own order naming a pollutant and an objective. Find the order before you commission an assessment.

Read article →
Data Tools How-To7 min read

Using the ancient woodland inventory before a layout is drawn

Ancient woodland is irreplaceable habitat and the standing advice buffer starts at 15 metres. Plot it before the masterplan, not after it has been priced.

Read article →
Data Tools How-To7 min read

Checking whether a site is on a brownfield land register

Brownfield land registers are published as open data under the 2017 Regulations. Part 1 records land the council considers suitable for housing, while a Part 2 entry grants permission in principle.

Read article →
Data Tools How-To7 min read

Finding the Green Belt boundary for a site

National policy says what Green Belt is for. Local plans draw the lines. The adopted policies map is the authoritative source, and everything else is a convenience.

Read article →
Data Tools How-To7 min read

Checking Article 4 directions in the national dataset

The national planning data service publishes Article 4 directions and their boundaries, but the direction document and the local land charges search are the legal record. Both matter before you buy.

Read article →
Data Tools How-To7 min read

Finding conservation area boundaries in the national dataset

The national dataset is the fastest way to check a conservation area boundary. The council's designation map is the legal one, and on a boundary property that matters.

Read article →
Data Tools How-To6 min read

Reading a list entry on the National Heritage List

A list entry tells you the grade, the date and what the inspector saw. It does not tell you what is protected, because listing covers the whole building.

Read article →
Data Tools How-To7 min read

Using MAGIC to check designations around a site

Twenty minutes on the Defra MAGIC map tells you which statutory designations touch your site, and which datasets you still have to check somewhere else.

Read article →
Data Tools How-To7 min read

Finding the right climate change allowance for a catchment

Every climate change figure in a flood risk assessment should trace back to a named table on a stated date. Here is how to find the catchment, epoch and band.

Read article →
Data Tools How-To7 min read

Checking surface water flood risk on the long term service

Surface water risk never appears on the Flood Map for Planning. Here is how to read the bands, get the depth and velocity layers, and use the result in a householder drainage statement.

Read article →
Data Tools How-To8 min read

Reading the Flood Map for Planning and what it leaves out

Flood Zones assume no defences exist and say nothing about surface water. How to read the Environment Agency map at plot scale, and what evidence to request next.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope