Daylight, Sunlight and Amenity – Page 4
BRE 209 tests, the 45-degree rule, overshadowing, overlooking and neighbour amenity.
Daylight, Sunlight and Amenity articles – page 4
390 articlesA side extension facing a blank flank wall
A blank flank wall has no window to assess and no right of light to lose. The objections that survive are the terracing effect, the rainwater detail at the boundary and the light in your own rooms.
Light to a neighbour's conservatory: how it is treated
A conservatory is normally an addition rather than a main habitable room, and most of its light arrives through the roof. The exceptions are the inner room behind it and a flank wall built close by.
A boundary wall raised to two metres and the light lost
Part 2 Class A allows two metres away from a vehicular highway and one metre next to one. That means the wall most likely to take light from a ground floor window is often the one needing no permission.
Reporting daylight shortfalls honestly in a submission
BRE 209 targets are advisory and officers approve schemes that miss them. What loses a scheme is a shortfall found late by an objector. How to report one so it can be weighed.
Sunlight to allotments, playgrounds and open space
BRE 209 suggests at least half an amenity area should get two hours of sun on 21 March. What that means for parks, allotments and play space, and how to check a submitted study.
Modelling the existing context in a daylight assessment
Most daylight disputes are arguments about the baseline model rather than the calculation. A reviewer's guide to survey sources, assumed room layouts, consented schemes and auditing someone else's geometry.
Overlooking distances and back to back separation
Separation distances are local conventions, not national policy. The 21m figure is a starting point, and a scheme that misses it can still succeed on a drawn privacy case.
Overshadowing a neighbouring garden: the assessment
An overshadowing study is a shadow model run against the sun path. The test that counts is whether half the garden still gets two hours of sun on 21 March.
Two hours of sunlight on 21 March for amenity areas
BRE 209 asks whether half of an amenity area gets two hours of sun on 21 March, with a secondary check against 0.8 times the former sunlit area. Here is how to apply both.
The 25 degree rule and when councils apply it
The 25 degree line is a screening test that avoids unnecessary calculation. Pass it and the daylight question is usually closed. Fail it and the real tests begin.
Average daylight factor and target illuminance compared
One method measures a percentage of overcast sky light with no regard to orientation. The other simulates real lux across a real year. A scheme can pass one and fail the other.
Daylight evidence for a listed building conversion
Deep plan historic buildings rarely meet modern daylight targets through their existing openings. The answer is an evidenced trade-off, not a silent shortfall.
Amenity space standards and useable outdoor space
Most amenity space policies set an area. Whether the space works depends on its depth, its orientation and whether anyone can put a table on it.
Reviewing somebody else's daylight report
An optimistic daylight report rarely contains a false number. It contains omitted windows, a convenient baseline and relief applied only where results fail.
Rooflights and the daylight they actually deliver
A rooflight sees most of the sky dome, which is why loft conversions work. Here is how pitch, orientation and the conservation detail change what you get.
Solar panels and loss of sunlight to a neighbour's array
There is no policy test for solar access to a panel array. The objection has to be built from the geometry, the benchmark dates and the string layout.
Obscure glazing and fixed panes as a planning solution
Obscure glass with a fixed lower pane solves overlooking cleanly for a bathroom and awkwardly for a bedroom. The specification and the condition wording decide which.
Loss of light as a ground of objection
Daylight to a habitable room is material; a view is not. Which tests a council applies, why a right of light is a separate civil matter, and how to write an objection that gets measured.
Shadow path diagrams and which dates to model
A shadow study that offers only June and December has answered the wrong question. How to build the 21 March set, which obstructions to model, and how to annotate the amenity area under test.
Reflectance, transmittance and maintenance assumptions
Three appendix assumptions decide more daylight results than the massing does. The conventional values for reflectance, transmittance and maintenance, and the checks that reveal an optimistic model.
Which windows to survey and how to record refused access
Most urban daylight assessments rely on assumptions for at least some neighbouring rooms. Here is how to screen the windows, document refused access and state the assumptions.
Modelled daylight results compared with hand calculation
Vertical sky component and no sky line can be verified by a case officer. Climate based daylight modelling describes rooms better but relies on assumptions only the modeller can see.
Overlooking assessment for roof terraces
A terrace has no single viewpoint. The assessment officers accept takes sight lines from every corner of the usable area, at parapet and leaning over it.
Daylight evidence for a roof extension on a terrace
Roof extensions sit above the windows they are accused of harming. The cases that matter are dormer cheeks near the party line, neighbouring rooflights and stepped terraces.
Not sure which documents your council will ask for?
Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.
Enter your postcode on PlanScope