Daylight, Sunlight and Amenity articles – page 7

391 articles
Daylight, Sunlight and Amenity6 min read

Sunlight to school playgrounds and play space

The BRE open space test asks for two hours of sunlight over half the area on 21 March. For a playground, the hours that matter are break and lunch.

Read article →
Daylight, Sunlight and Amenity7 min read

Reconciling daylight with solar gain in glazing design

The resolution is not a compromise on glazing area. It is glass selectivity, shading geometry, room depth and window head height, all set at concept stage.

Read article →
Daylight, Sunlight and Amenity7 min read

Applying the BRE numerical tests flexibly in cities

The BRE values are reference points, not standards. Flexibility means substituting a locally evidenced target for the general one, not asserting that a site is urban.

Read article →
Daylight, Sunlight and Amenity7 min read

Loss of outlook distinguished from loss of daylight

An extension can pass every daylight test and still be refused for overbearing impact. Daylight is measured, outlook is judged, and a view is not protected at all.

Read article →
Daylight, Sunlight and Amenity7 min read

Obtrusive light: curfew hours and intrusion limits

Obtrusive light is judged on light at the neighbour's window, light escaping upwards, and the curfew. Here is how the zones work and what to measure.

Read article →
Daylight, Sunlight and Amenity7 min read

Sense of enclosure as a refusal reason

An overbearing impact objection is judged by eye, not by calculation. Here is what the reason alleges, how inspectors weigh it, and the sections that answer it.

Read article →
Daylight, Sunlight and Amenity7 min read

Justifying a separation distance in a dense context

Separation standards come from local design guidance, not national policy. Here is how to argue the actual relationship on a tight urban site, and what to draw.

Read article →
Daylight, Sunlight and Amenity7 min read

Mirror massing as the alternative comparator

A cleared site produces huge percentage losses against an existing baseline. A notional comparator can put that in context, if the assumptions behind it survive scrutiny.

Read article →
Daylight, Sunlight and Amenity7 min read

The daylight penalty balconies impose on the room behind

An inset balcony is often the reason a living room fails its daylight target. Model it properly, then decide whether the amenity space is worth the room behind it.

Read article →
Daylight, Sunlight and Amenity8 min read

Daylight inside single aspect north facing flats

A north facing single aspect flat cannot pass a sunlight test, because the test does not apply to it. The daylight case has to be made on illuminance, room depth and honest reporting.

Read article →
Daylight, Sunlight and Amenity6 min read

Which windows and rooms to assess for daylight

The scope of a daylight report is where it gets attacked. Here is how to identify receptors, decide which rooms are protected, handle consented but unbuilt neighbours and record assumptions where access is refused.

Read article →
Daylight, Sunlight and Amenity6 min read

The two hours of sun test for gardens on 21 March

At least half a garden should receive two hours of sun on 21 March. Where it already receives less, the test becomes whether the sunlit area falls below 0.8 times its former size. Here is how both are assessed.

Read article →
Daylight, Sunlight and Amenity6 min read

Target illuminance and the current daylight standard

BS EN 17037 measures daylight as illuminance achieved for a fraction of the year, not as a single ratio. Here is how the target and minimum criteria work, what the UK National Annex asks for, and how to report both methods.

Read article →
Daylight, Sunlight and Amenity7 min read

Loss of outlook and enclosure as separate amenity harms

Daylight loss is a quantity question with numbers. Outlook and enclosure are judgements about what an occupier sees and how close the mass sits. Each needs different evidence.

Read article →
Daylight, Sunlight and Amenity6 min read

Amenity conditions that cannot be enforced, and why

Amenity conditions fail on precision and enforceability more often than any other kind. Converting a subjective effect into a measurable requirement is what makes them stand up.

Read article →
Daylight, Sunlight and Amenity6 min read

Cooking odour and the flats above a food business

Extraction that discharges above roof level, at sufficient velocity, with filtration matched to the cooking type, is what keeps cooking odour out of the flats upstairs. Retrofits start with the termination, not the filters.

Read article →
Daylight, Sunlight and Amenity6 min read

Construction period amenity and what conditions control

Building work is temporary, which is why councils control it with conditions rather than refuse permission. Knowing which body handles which complaint saves months of frustration.

Read article →
Daylight, Sunlight and Amenity6 min read

Amenity for the occupiers of the new development itself

Most amenity assessment looks outward at the neighbours. The living conditions of the scheme's own future occupiers are a separate test, and they refuse schemes on their own.

Read article →
Daylight, Sunlight and Amenity7 min read

Assessing daylight where the neighbouring window is unlawful

Lawfulness of a neighbouring window goes to the weight given to its amenity, not to whether it is assessed. Here is how to establish the position and present it without antagonising the officer.

Read article →
Daylight, Sunlight and Amenity7 min read

Daylight modelling software and what officers accept

No English council keeps a list of approved daylight software. What gets an assessment through is a stated method following BRE 209, checkable inputs and results a reviewer can reproduce.

Read article →
Daylight, Sunlight and Amenity7 min read

Amenity impacts of raising a boundary wall or fence

Class A allows 2 metres, or 1 metre next to a vehicular highway, measured from original ground level. Above that, outlook and enclosure usually matter more than measured light loss.

Read article →
Daylight, Sunlight and Amenity7 min read

Daylight evidence for a rear dormer in a terrace

A dormer sits high, set back and narrow, so daylight loss to a neighbour is usually negligible. Overlooking is the real issue, except in four recognisable terrace layouts.

Read article →
Daylight, Sunlight and Amenity7 min read

Artificial light spill into bedroom windows

Vertical illuminance at the glass, not brightness at the lamp, is what obtrusive light guidance controls. How zones, curfews and verification conditions fit together.

Read article →
Daylight, Sunlight and Amenity7 min read

High hedges, trees and light to a neighbouring house

Loss of light to a hedge is a complaint to the council under the Anti-social Behaviour Act 2003. Loss of light to a tree has almost no remedy. Knowing which applies saves a fee and six months.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope