Energy, Sustainability and Carbon articles – page 8

301 articles
Energy, Sustainability and Carbon8 min read

Roof space competition: plant, solar panels and green roof

Policy asks a flat roof to carry plant, panels, greening and attenuation as though the others were not there. How to allocate the area, what biosolar needs, and how to condition it without freezing the plant.

Read article →
Energy, Sustainability and Carbon8 min read

Data centre heat recovery into a district heat network

Heat offtake is the benefit most likely to win support for a data centre, and the one most often asserted without evidence. What the application has to show about temperature, route, plant and the offtake agreement.

Read article →
Energy, Sustainability and Carbon7 min read

External terminations for heat recovery ventilation

Two holes in the envelope, a separation requirement and an elevation an officer is judging. Heat recovery terminations are a consent question long before they are a services one.

Read article →
Energy, Sustainability and Carbon7 min read

Energy centre flue height and dispersion modelling

Model first, then design the flue, then place it on the elevation. Building downwash, receptor heights and the Clean Air Act consent all sit behind the number on the drawing.

Read article →
Energy, Sustainability and Carbon7 min read

Overheating assessment assumptions for student accommodation

Student rooms are bedroom, study and living room at once, so standard TM59 occupancy profiles understate the risk. The assumptions you declare decide whether the assessment survives review.

Read article →
Energy, Sustainability and Carbon8 min read

Glint and glare assessment for a solar farm

Glint and glare assessment is a geometry exercise that calculates where reflected sunlight lands through the year. Aviation receptors carry the most weight and leave the narrowest mitigation options.

Read article →
Energy, Sustainability and Carbon7 min read

Post-construction energy verification conditions

Energy verification conditions ask you to prove after construction that the building performs as the approved statement said. What evidence discharges them, and what to do when the as-built figures fall short.

Read article →
Energy, Sustainability and Carbon7 min read

Future proofing claims in an energy statement

Future proofing claims divide into spatial, capacity and behavioural commitments. The first two can be drawn, dimensioned and conditioned. The third usually fails the tests in national guidance on the use of planning conditions.

Read article →
Energy, Sustainability and Carbon7 min read

Biomass heating and the air quality constraint

Biomass heating proposals are judged on particulate and nitrogen oxide emissions at the flue as much as on carbon savings. Smoke control areas under the Clean Air Act 1993 and nearby Air Quality Management Areas set the evidence burden.

Read article →
Energy, Sustainability and Carbon7 min read

Evidencing a local plan renewable energy target

Whether a scheme meets an on site renewable target depends on what the policy measures and against what baseline. How to run the calculation and evidence a caveat.

Read article →
Energy, Sustainability and Carbon7 min read

The energy hierarchy on a small residential scheme

The same three steps apply on a minor scheme, but two of them resolve in a paragraph. What to include, how to size the array, and how to avoid a major scheme template.

Read article →
Energy, Sustainability and Carbon7 min read

Heat pump arrays for flats: noise and roof design

An array of heat pumps serving a block behaves differently from one unit on a house. How cumulative noise, screening, maintenance access and roofscape effect are handled.

Read article →
Energy, Sustainability and Carbon7 min read

Foundations and embodied carbon on a difficult site

On poor ground the substructure can carry as much upfront carbon as the frame. How to compare piling, rafts, stone columns and foundation reuse, and what to submit.

Read article →
Energy, Sustainability and Carbon6 min read

Pre-demolition audits and circular economy statements

An audit produced after the demolition contractor is appointed cannot change anything. What to record element by element, how to express targets and what to report afterwards.

Read article →
Energy, Sustainability and Carbon6 min read

Energy statement for a conversion where the fabric is fixed

When the envelope cannot change, an energy statement has to document the search rather than report a number. Baselines, measures, constrained roofs and how to justify partial compliance.

Read article →
Energy, Sustainability and Carbon6 min read

Renewables on a rural site with a constrained grid connection

The network operator's answer on capacity sets the deliverable size of a rural renewable scheme. How export limitation, private wire arrangements and storage change what you should apply for.

Read article →
Energy, Sustainability and Carbon6 min read

Green roof specification and what counts as urban greening

A roof specified as biodiverse with 60mm of medium will not behave like one. How substrate depth, structural load and access shape a green roof specification, and how greening scores treat sedum mat.

Read article →
Energy, Sustainability and Carbon7 min read

Overheating in single aspect flats and the design responses

Bedrooms fail the night criterion before living rooms fail the daytime one. Which design moves close the gap, and which conflicts cannot be specified away.

Read article →
Energy, Sustainability and Carbon7 min read

Heat network connection safeguarding on an allocated site

Answering a heat network policy takes a drawing, not a paragraph. Plant space, safeguarded routes, easements and the conditions and obligations that secure them.

Read article →
Energy, Sustainability and Carbon7 min read

Energy statement for a listed building with limited fabric change

On a listed building the energy hierarchy meets a statutory duty. Which fabric measures are usually acceptable, which are refused, and how to document the balance.

Read article →
Energy, Sustainability and Carbon7 min read

Combined heat and power and the air quality objection

The carbon argument for gas combined heat and power has narrowed as the grid decarbonised, while the local nitrogen dioxide argument has not moved. An energy statement has to face that rather than bury it.

Read article →
Energy, Sustainability and Carbon7 min read

Biosolar roofs: energy, drainage and biodiversity together

Panels, substrate and attenuation compete for the same depth, the same structural allowance and the same access. Here is how the three requirements are reconciled.

Read article →
Energy, Sustainability and Carbon7 min read

Energy statements for warehouse and logistics schemes

Low regulated demand and a huge roof make warehouse energy statements behave unlike housing. Here is how to present the percentage, the absolute saving and the offset position.

Read article →
Energy, Sustainability and Carbon7 min read

Solar canopies over car parks: the planning route

Car park solar canopies sit outside the small standalone solar permitted development class. What a full application has to answer on clearance, drainage, lighting, trees and grid capacity.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope