Flood, Drainage and SuDS articles – page 3

290 articles
Flood, Drainage and SuDS7 min read

Oil separators and car park drainage design

Separators only remove free oil and they need maintaining. For most car parks the right answer is a treatment train, with the separator reserved for high hazard surfaces.

Read article →
Flood, Drainage and SuDS7 min read

Silt and runoff control during construction

A stripped site sheds more water than the hardstanding before it, and the permanent drainage design does not exist yet. This is the period regulators pursue hardest.

Read article →
Flood, Drainage and SuDS7 min read

Reservoir inundation mapping in planning decisions

A site can be in Flood Zone 1 and in a reservoir inundation area at the same time. The sequential test does not apply, but the residual risk still has to be addressed.

Read article →
Flood, Drainage and SuDS7 min read

Depth and velocity hazard and safe access routes

Depth alone says little about safety. The hazard rating combines depth, velocity and debris, and it is what decides whether an access route out of a development is acceptable.

Read article →
Flood, Drainage and SuDS7 min read

Exceedance routing above the design event

Above the design event, water flows over the surface and someone has to decide where. An exceedance plan shows the route, the low points, the thresholds and what the water reaches.

Read article →
Flood, Drainage and SuDS8 min read

Evidencing the drainage hierarchy decision

Weak hierarchy justification stops more drainage strategies than bad hydraulics. What proof each step down the hierarchy needs, and the one table reviewers read first.

Read article →
Flood, Drainage and SuDS7 min read

Flow control devices and choosing between them

The flow control is what makes a discharge rate real. How head, blockage risk and adoption route decide between a vortex unit, an orifice plate and a throttle pipe.

Read article →
Flood, Drainage and SuDS7 min read

Rainfall data choices and the design storm profile

Summer or winter profile, FEH13 or an older model, and which grid reference. These inputs decide the attenuation volume and belong on the face of the calculation.

Read article →
Flood, Drainage and SuDS7 min read

Sustainable drainage on a site with contaminated ground

Contaminated ground rules out infiltration, which overturns the standard drainage hierarchy. Lined attenuation and a positive outfall are the answer, if the sequencing is right.

Read article →
Flood, Drainage and SuDS7 min read

Discharge rates: greenfield, brownfield and betterment

The permitted discharge rate shapes the whole drainage design. Here is how greenfield rates are estimated, how brownfield betterment is argued, and when a rate becomes undeliverable.

Read article →
Flood, Drainage and SuDS7 min read

Surface water and highway drainage: who takes the flow

A public sewer carries a statutory right to connect; a highway drain does not. What the highway authority needs to see, what it will charge for, and where to go when it refuses.

Read article →
Flood, Drainage and SuDS8 min read

Raised platforms and floodplain compensatory storage

Raising a site in Flood Zone 3a displaces flood water that has to be replaced band by band. The level for level calculation, the land search, the connectivity tests and how the storage is secured.

Read article →
Flood, Drainage and SuDS7 min read

Reviewing a hydraulic modelling report line by line

A model is a set of assumptions with arithmetic attached. How to check model choice, topography, boundary conditions, sensitivity testing and results presentation before relying on the output.

Read article →
Flood, Drainage and SuDS7 min read

Flood response plans secured by planning condition

Flood response plans deal with residual risk after the mitigation is built. The contents that get approved first time, how trigger levels tie to flood warnings, and whether a condition or an obligation should secure it.

Read article →
Flood, Drainage and SuDS8 min read

SuDS adoption and the management company question

No body is obliged to adopt a surface SuDS feature in England, so most end up with a management company. Settle the component-by-component position before the layout is fixed.

Read article →
Flood, Drainage and SuDS8 min read

Exceedance flow routing when the drainage system fills

Above the 1 in 100 year event, water runs overland. Designing where it goes is a layout and levels exercise, and lead local flood authorities expect to see it drawn rather than described.

Read article →
Flood, Drainage and SuDS7 min read

Basement drainage, anti-flooding devices and pumping

A basement drains below the level of the sewer, so surcharge pushes water back up the pipe. Pumped systems, anti-flood loops and the residual risk when the power goes.

Read article →
Flood, Drainage and SuDS6 min read

Drainage conditions: what a discharge submission needs

Surface water drainage conditions are returned for completeness more often than for engineering. Here is the package that gets approved first time, and the reasons submissions come back.

Read article →
Flood, Drainage and SuDS7 min read

Flood risk activity permits and the 8 metre byelaw distance

A permit under the Environmental Permitting Regulations 2016 is a separate consent from planning permission, and the 8 metre line should shape the layout from the first sketch.

Read article →
Flood, Drainage and SuDS7 min read

Permeable paving: sub-base storage, limits and maintenance

The paving is not the storage, the sub-base is. Here is how to size it, when infiltration is off the table, and what the front garden permitted development condition actually says.

Read article →
Flood, Drainage and SuDS7 min read

Resurveying levels and why a topographic survey matters

National terrain models are built for catchment scale work, not for proving freeboard on one plot. The datum, accuracy and feature list a flood risk assessment actually needs from a levels survey.

Read article →
Flood, Drainage and SuDS7 min read

Sequential test search areas and how to define one

A sequential test stands or falls on the area of search. Agree it with the officer, search the plan allocations and brownfield register, and never discount a site because the applicant does not own it.

Read article →
Flood, Drainage and SuDS8 min read

Treatment train stages and the pollution hazard index

The simple index approach compares pollution hazard indices for each surface with the mitigation indices of the SuDS components in series. Hydrocarbons are usually what decides whether a treatment train passes.

Read article →
Flood, Drainage and SuDS7 min read

Groundwater flooding and the evidence a council accepts

Groundwater risk has to be assembled rather than downloaded. Which data sources exist, how long to monitor, and how to put a single wet winter in context.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope