Flood, Drainage and SuDS articles – page 5

290 articles
Flood, Drainage and SuDS7 min read

Interception storage and the first few millimetres of rain

The first few millimetres of rain never leave a greenfield site. Interception puts that behaviour back, and on a self-build it is usually satisfied by paving, a soakaway and a rain garden.

Read article →
Flood, Drainage and SuDS7 min read

Vortex flow controls and accuracy at low discharge rates

Low greenfield runoff rates sit at the awkward end of a flow control's operating range. Head, device curves, blockage risk and the as-built discrepancy that catches schemes out.

Read article →
Flood, Drainage and SuDS7 min read

Reservoir inundation mapping and what it changes

Reservoir inundation extents are consequence maps drawn for emergency planners, not flood zones. How to describe the residual risk proportionately and which proposals deserve more.

Read article →
Flood, Drainage and SuDS9 min read

Pumping stations: standards and amenity separation

A pumping station sits at the low point, needs separation from habitable buildings and takes a fenced compound with highway access. Fix it at concept stage or lose three plots.

Read article →
Flood, Drainage and SuDS8 min read

Foul network reinforcement and Grampian conditions

A negative condition preventing occupation beyond a stated number of homes until off-site works are complete can make a constrained site developable, or it can strand the scheme at plot 60.

Read article →
Flood, Drainage and SuDS8 min read

Sewer capacity enquiries: asking the right question

A red line and a unit count buys a generic answer. A point of connection, a peak flow and a phasing programme buys a response you can attach to the drainage strategy.

Read article →
Flood, Drainage and SuDS7 min read

Residual flood risk: writing about breach and blockage

Residual risk is the section consultees read hardest. Naming each failure mechanism, testing it proportionately and saying who carries the duty afterwards.

Read article →
Flood, Drainage and SuDS7 min read

Site-specific flood assessment against the strategic one

The council's strategic assessment and your own site-specific one do different jobs. How to use the first to cut the cost of the second, and where its data runs out.

Read article →
Flood, Drainage and SuDS7 min read

Basement flood risk and pumped drainage

Basement dwellings sit in the highly vulnerable category, so the flood zone decides the principle and the pump design decides the detail. What to show in the assessment.

Read article →
Flood, Drainage and SuDS8 min read

Building close to a flood defence: byelaws and clearances

Permanent works within eight metres of a main river bank or flood defence need an Environment Agency permit, sixteen metres on tidal defences. The maintenance strip usually decides the layout.

Read article →
Flood, Drainage and SuDS7 min read

Riparian ownership and what the duty involves

Own land beside a ditch or stream and you probably own the channel to its centre line, with duties to pass on flow and keep the bed and banks clear. Here is what that means in practice.

Read article →
Flood, Drainage and SuDS8 min read

Blue roofs and attenuation on a podium deck

Where there is no ground level storage left, attenuation moves onto the roof. Here is what blue roofs and podium decks demand in loading, outlet control, waterproofing and maintenance.

Read article →
Flood, Drainage and SuDS7 min read

Infiltration testing to BRE Digest 365 in practice

A BRE Digest 365 test is three fills of a trial pit timed from 75 to 25 per cent of the effective depth, designed on the slowest. Here is how to get the fieldwork and the reporting right.

Read article →
Flood, Drainage and SuDS7 min read

Proving the existing run-off rate on a brownfield site

Flood authorities test the existing run-off rate harder than any other input. Here is the evidence that proves connected impermeable area, and how betterment is applied to it.

Read article →
Flood, Drainage and SuDS6 min read

Managing runoff on a steeply sloping site

On a sloping plot the drainage problem is speed rather than volume. Energy dissipation, terraced storage, infiltration and slope stability, and the levels a reviewer will ask for.

Read article →
Flood, Drainage and SuDS7 min read

Modelling a partially blocked flow control

Lead local flood authorities expect a drainage strategy to show what happens when the flow control blocks. Here is how the scenario is run, what levels it produces and how to present it.

Read article →
Flood, Drainage and SuDS7 min read

Planting specification for swales and wetland margins

A swale base and a wetland margin are different growing conditions two metres apart. Here is how to specify planting by zone, and what the maintenance regime has to say to keep it working.

Read article →
Flood, Drainage and SuDS7 min read

Construction dewatering: the consents you actually need

Dewatering an excavation needs an abstraction licence for taking the water and a permit or consent for discharging it. Neither comes from the council, and both take longer than the site programme assumes.

Read article →
Flood, Drainage and SuDS7 min read

Which rainfall dataset to cite in a drainage calculation

Name the rainfall model, the version, the grid reference and the extraction date. Here is how the Flood Estimation Handbook revisions differ, why storm profiles change the answer, and what a drainage reviewer checks first.

Read article →
Flood, Drainage and SuDS7 min read

Outfall design, bank stability and scour protection

A surface water outfall is where a drainage strategy either works or quietly fails. Four things have to be settled together: invert level, scour protection, bank stability and maintenance.

Read article →
Flood, Drainage and SuDS7 min read

Construction phase drainage and silt control

An operational drainage strategy describes a finished site. During construction the same site is bare earth discharging to the same watercourse with no permanent treatment in place, and it needs its own design.

Read article →
Flood, Drainage and SuDS7 min read

Greenfield runoff rate: comparing the accepted methods

Two accepted methods applied to the same field can differ by a factor of two on a small site. Here is what drives the difference, how the 50 hectare scaling works, and how to present it.

Read article →
Flood, Drainage and SuDS7 min read

Culvert capacity and trash screen design on a small site

A culverted watercourse on a small site raises two questions: can it carry the design flow with climate change added, and who will clean the screen. Here is how to answer both.

Read article →
Flood, Drainage and SuDS8 min read

Overland flow arriving from neighbouring land

Water from the field above is your flood risk, not the neighbour's problem. Blocking it shifts the risk and creates liability, so the design has to carry it through the site.

Read article →